AI-generated illustrative concept. This image does not depict this project or confirm its interiors, amenities, views or construction status.
Hero Realty · Mohali
Hero Homes Sector 88
Group Housing Site No. 1 · Sector 88, SAS Nagar (Mohali), Mohali

Hero Homes Mohali Phase 2A brochure. Area labels are reproduced from the recorded source; authority-approved unit areas have not been authenticated.
About Hero Homes Sector 88
Hero Homes Sector 88 brings the Phase I, Phase 2A, Phase 2B and Phase III records together under one project identity. The Phase I Aurum brochure records a 3 BHK + store + servant apartment and a penthouse; its layouts and area figures remain tied to Phase I only.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download BrochurePDF 12 pages 3.4 MB
Additional project reference documents
Drafts, presentations and historical references are not substitutes for a current project brochure or an authority-approved plan.
Phase I · Aurum brochure
Hero Homes Mohali Phase I · Aurum brochure
Download reference PDFPDF · 19 pages · 2.9 MB
Phase 2A brochure
Hero Homes Mohali Phase 2A brochure
Download reference PDFPDF · 12 pages · 10.4 MB
Phase III brochure
Hero Homes Mohali Phase III brochure
Download reference PDFPDF · 41 pages · 97.9 MB
Brochure copy
Hero Homes Mohali - Parkside Life, PR1114
Download reference PDFPDF · 48 pages · 6.9 MB
CHOOSE YOUR CONFIGURATION
Apartment sizes & floor plans
Phase 2A · Type I · Towers 1, 2, 3 & 6 / Tower 12
3 BHK + store
- Saleable area
- 1,481 sq ft
- Built-up area
- 1,206.78 sq ft
- Carpet area
- 926.89 sq ft
- Balcony area
- 155.79 sq ft
- Bedrooms
- 3
Hero Homes Mohali Phase 2A brochure. Source hero-homes-mohali-phase-2-brochure.pdf · page 6. Authority-approved unit area has not been authenticated.
Download layout PDF ↧Enquire about this configuration ↗PROJECT PLANS
Project site plan & floor plans
Open a plan to view it in detail. Confirm the exact tower, block, plot or unit in the current approved documents.
Recorded site, master or landscape plan for project orientation, with additional brochure floor plans where available. Confirm the exact tower, block, plot and current plan in the approved documents.
Hero Homes Mohali Phase I · Aurum plans
Hero Homes Sector 88 brochure · Phase 2B plans
PROJECT SPECIFICATIONS
Specifications
Compare the recorded materials, fittings and project provisions.
Specification schedule to confirm
Request the specification schedule applicable to your selected property and phase.
Ask ATY for specifications ↗Source & scope
A project-specific specification schedule is still awaited. No standard list of finishes or infrastructure has been assumed.
PROJECT FACILITIES
Amenities
Explore the project’s shared facilities and services.
Shared facilities to confirm
Request the project’s current amenity schedule and phase-wise access details.
Ask ATY about amenities ↗Source & scope
Facilities retained from the project’s recorded source material. Confirm which belong to the selected phase and which are completed and operational.
View supporting project source ↗PLAN YOUR VISIT
Location & map
Group Housing Site No. 1 · Sector 88, SAS Nagar (Mohali) · Mohali
Project information
- Developer brand
- Hero Realty
- Legal promoter
- Hero Realty Private Limited
- Property format
- Flat / apartment
- Configurations
- Penthouse · 3 BHK + store + servant · 3 BHK + store · 3 BHK + 3T + utility + store · 3 BHK + 3T + store · 4 BHK + utility
- Registered location
- Group Housing Site No. 1 · Sector 88, SAS Nagar (Mohali), Mohali
- Project Status
- Partial Delivered
- RERA Number
- PBRERA-SAS81-PR0114 · PBRERA-SAS81-PR0522 · PBRERA-SAS81-PR0828 · PBRERA-SAS81-PR1114
- Stage basis
- Partial Delivered — owner-confirmed on 23 September 2026. Confirm the selected phase and unit documents.
Further published project details
- Phase-wise RERA registrations
- Phase I: PR0114 · Phase 2A: PR0522 · Phase 2B: PR0828 · Phase III: PR1114
Published source facts retain their original scope; they do not override the phase-specific records below.
Project-specific points to clarify
- This shared Sector 88 page does not make the phases interchangeable. The Phase I Aurum brochure records one 3 BHK + store + servant layout and one penthouse plan set; neither applies to Phase 2A, Phase 2B or Phase III. Match the selected unit to its exact phase, registration, sanctioned layout and buyer-agreement terms.
RERA documents
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Confirm the exact phase, legal promoter, registration and current approvals
- Match the current sanctioned layout and area definitions
- Obtain an itemised current cost sheet and inspect the actual site
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
