Unitech · Mohali
Uniworld City, Mohali
Sectors 97, 106 and 107, Mohali, Mohali

Project details will be expanded when verified configuration and size information is available.
About Uniworld City, Mohali
Uniworld City, Mohali is included in Unitech’s official portfolio. Integrated township with plots, independent floors and apartments. Review the exact phase, approved plans, current physical stage and transaction documents before considering a property.
Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download Brochure
File not available
The brochure for Uniworld City, Mohali is not available at the moment. Please contact Acres To Yards for assistance.
Emaar Mohali Hills, Mohali, Punjab
CHOOSE YOUR CONFIGURATION
Spaces, sizes & layouts
Configuration details are being completed
Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.
Request sizes & layouts ↗Project information
- Developer brand
- Unitech
- Legal promoter
- Unitech Limited
- Property format
- Mixed-use / township
- Configurations
- Integrated township with plots, independent floors and apartments
- Registered location
- Sector 97, 106 & 107 , At Mohali along Kharar Banur Road (Pb) Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160043
- Project Status
- Status to Verify
- RERA Number
- PBRERA-SAS80-PR0367
- Stage basis
- Developer-reported or legacy official information; not independently verified against current phase-level completion, occupation or registration records.
- Total project land
- 908721.61 (in sqr mtrs)
- Declared start date
- 25-Jan-2006
- Completion / possession
- 24-Nov-2020 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
- Published format
- Integrated township with plots, independent floors and apartments
- Published status
- Official legacy township page; current phase status requires confirmation
Published source facts retain their original scope; they do not override the phase-specific records below.
Project-specific points to clarify
- Official township-area descriptions differ, so no total acreage is presented. The township address is supported by the Aspen Greens component page; current phase boundaries require authority verification.
DOCUMENTS & SOURCES
RERA information
PBRERA-SAS80-PR0367 — Uniworld City
- Recorded validity
- 24-Nov-2020
- Source review
- 7 September 2026
- Registration scope
- PBRERA-SAS80-PR0367 — Uniworld City
Project details recorded in this filing
- Legal promoter
- Unitech Limited
- Status at filing
- On-going
- Declared start date
- 25-Jan-2006
- Registered project / phase
- Uniworld City
- Registered address
- Sector 97, 106 & 107 , At Mohali along Kharar Banur Road (Pb) Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160043
- Declared infrastructure
- Underground Storm drainage and Sewerage network system, Rain Water harvesting, Street Lighting, Centralized Sewage Treatment Plant,24x 7 supply of water through centralized Water tank along with Overhead tank, Electrical supply through underground cabling system, Dual water supply network main or treated. wide roads leading to the carefully planned township independent floors, plotted developments
- Form B expected completion
- 24-Nov-2020
- Total project land · sq m
- 908721.61 (in sqr mtrs)
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Extension checks and source qualifications
Approval documents & project filings
Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.
Request approval documents ↗Extension checks
no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Project/phase name, legal promoter and locality reviewed. An umbrella catalogue entry may cover several separate registrations; do not transfer dates, approvals or unit sizes between them.
GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.
No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- The exact property layout and unit / plot identification.
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Match the exact legal promoter and separately registered project phase
- Verify current registration, orders and applicable planning approvals
- Obtain the exact layout, area basis and current itemised costs
- Check possession and completion / occupation evidence independently
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
