Acres To Yards — Built on trust, growing together.

Turnstone Realty · Mohali

The Medallion Aurum

Group Housing Site · Sector 67, SAS Nagar (Mohali) · International Airport Road, Mohali

Flat / apartmentUnder Construction
Selected configuration3+1 BHK
Unit sizeCheck the Brochure or Call ATY
Project locationMohali

The Medallion Aurum official project site. Area labels are reproduced from the recorded source; authority-approved unit areas have not been authenticated.

About The Medallion Aurum

The Medallion Aurum is a separately registered residential project in Sector 67, Mohali. Its official floor-plan labels identify 3-bedroom + utility and 4-bedroom + utility residences. The current official source reviewed does not provide a reliable unit-size schedule or downloadable plan files, so those details are shown as “Check the Brochure or Call ATY”.

Project images to follow

Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

File not available

The brochure for The Medallion Aurum is not available at the moment. Please contact Acres To Yards for assistance.

Acres To Yards
55-SF, Central Plaza, Sector 105,
Emaar Mohali Hills, Mohali, Punjab

CHOOSE YOUR CONFIGURATION

Apartment sizes & floor plans

2 recorded variants

3 bedrooms + 4 toilets + utility · official project-site floor-plan label

3+1 BHK

Bedrooms
3
Unit size
Check the Brochure or Call ATY
Carpet area
Check the Brochure or Call ATY

Check the Brochure or Call ATY for the current layout of this configuration.

The Medallion Aurum official project site. Authority-approved unit area has not been authenticated.

Enquire about this configuration ↗

Amenities

  • 15,000 sq ft aqua zone — official project site
  • Gym, yoga hall and spa — official project site
  • Tennis court, cricket practice nets, basketball and indoor badminton courts — official project site

Project information

Developer brand
Turnstone Realty
Legal promoter
Turnstone Realty LLP
Property format
Flat / apartment
Configurations
3+1 BHK · 4+1 BHK
Registered location
Group Housing Site · Sector 67, SAS Nagar (Mohali) · International Airport Road, Mohali
Project Status
Under Construction
RERA Number
PBRERA-SAS81-PR0866
Stage basis
Project information only. The RERA record and developer site do not establish current availability, title, completed construction, possession or a recommendation.
Further published project details
Punjab RERA registration
PBRERA-SAS81-PR0866Official source ↗
Project address
Group Housing Site, Sector 67, SAS Nagar, Mohali, Punjab 160062Official source ↗
Project start date
18 May 2022Official source ↗
Form B expected completion
30 November 2030Official source ↗

Published source facts retain their original scope; they do not override the phase-specific records below.

Project-specific points to clarify
  • The Medallion Aurum (Sector 67, PBRERA-SAS81-PR0866) is separate from The Medallion Sector 82 Alpha (PBRERA-SAS81-PR0685). Their plans, sizes and registration details are not interchangeable.
  • No current official brochure PDF or project-specific floor-plan image was available in the reviewed sources. A verified copy can be added when supplied.

DOCUMENTS & SOURCES

RERA information

15 September 2026
Recorded registrationPBRERA-SAS81-PR0866

The Medallion Aurum · Punjab RERA project record

Recorded validity
Punjab RERA quarterly update records 30 November 2030; confirm the current authority status and selected-unit position.
Source review
15 September 2026
Registration scope
The Medallion Aurum · Punjab RERA project record
Project details recorded in this filing
Project type
Residential (Building/Tower Development)Official source ↗
Project address
Group Housing Site, Sector 67, SAS Nagar, Mohali, Punjab 160062Official source ↗
Project start date
18 May 2022Official source ↗
Form B expected completion
30 November 2030Official source ↗

This project record is distinct from The Medallion Sector 82 Alpha. A RERA registration and Form B date do not establish current availability, construction completion, title, possession or suitability.

Extension checks and source qualifications

Approval documents & project filings

Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.

Request approval documents ↗

Extension checks

No extension conclusion is made here. The Punjab RERA quarterly-update page identifies promoter-submitted information as pending authority verification.

This project record is distinct from The Medallion Sector 82 Alpha. A RERA registration and Form B date do not establish current availability, construction completion, title, possession or suitability.

The configuration labels come from The Medallion Aurum’s official project site. No current official size schedule, brochure PDF or downloadable unit-plan file was available in the reviewed source, so no figures or layouts have been inferred.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • Unit size for the exact selected configuration.
  • Carpet area for the exact selected configuration.
  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Match the selected residence to its current sanctioned plan, tower and exact unit documents.
  • Obtain the current brochure, unit-size schedule, RERA carpet-area disclosure and itemised cost sheet.
  • Confirm current construction progress, approvals, possession terms and availability for the selected unit.

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.