Promoter Details (Other Than Individual)
| Turnstone Realty LLP | Limited Liabilities Partnership | ||
| Main Objects of Organization | Developing Real Estate Projects | ||
| Registered Address of Organization |
sector-67, SAS Nagar
,
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160062 |
||
| Official Address |
SCO- 67, First Floor, sector-82, SAS Nagar
,
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160062 |
||
| 3 (in years) | 0 (in years) | ||
| WebLink (Promoter/Parent-Entity) | |||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | Partner | Vijeta Infracon Private Limited through its Designated Partner AMAR PRABHU GOYAL |
#220, SECTOR 32-A
,
Chandigarh , Chandigarh - 160030 Email: goyal.prabhu[at]gmail.com |
|
| 2 | Partner | Mirus Infratech Private Limited through its Designated Partner GULZARINDER SINGH CHAHAL |
9 JOGINDER NAGAR PATIALA
,
Patiala , Punjab - 147001 Email: chahalgulzar[at]gmail.com |
|
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | The Medallion Group Housing Site No 4 and 5 IT City | On-going | 34843.4 | 30-Oct-2020 | 30-Oct-2025 | 30-Oct-2025 |
| 2 | MEDALLION 68 | On-going | 7276.26 | 22-Apr-2022 | 31-Aug-2025 | 31-Aug-2025 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| -- | -- | -- | -- | -- |
About the Project
| Project Name | The Medallion Aurum | ||
| Project Address |
Group Housing Site, Sector 67,
,
SAS Nagar
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160062 |
||
| Project Amenities | water supply, drainage water, solid waste management and disposal, electricity supply, | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Residential (Building/Tower Development) |
||
| Project Status | New Project | Project Cost (in rupees) | 7352000000.00 (INR) |
| Project Start Date | 18-May-2022 | Proposed/ Expected Date of Project Completion as specified in Form B | 30-Nov-2030 |
| Project Web Link | https://www.themedallion.co | Mega Project (Yes/No) | No |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
RCC Frame Structure :- Tiled :- Paint :- Branded Fittings :- Branded/ ISI Marked :- Modular-kitchen |
||
| Authorized Person for Communication with regards to Project |
Gulzarinder Singh
Chahal
#09 Joginder Nagar , Patiala , Punjab - 147001 E-Mail: chahalgulzar[at]gmail.com Mobile Phone: 9915800023 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | Axis Bank Limited | Branch Name | Sector 82 Mohali |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | UTIB0003511 |
| Account Holder Name | TURNSTONE REALTY LLP | ||
| Bank Address |
Sector 82 Mohali
,
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055 |
||
Project Land Details
| 51036.92 (in sqr mtrs) | |||
| 0 (in sqr mtrs) | 51036.92 (in sqr mtrs) | ||
| 8967.818 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 1530 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 39087.392 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 000 | 51036.92 (in sqr mtrs) | Sector 67 SAS Nagar Mohali | Not Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 3 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 4 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 5 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 6 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 7 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 8 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 9 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 10 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 11 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 12 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 13 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 14 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 15 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 16 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 17 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 18 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 19 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 20 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 21 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 22 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 23 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 24 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 25 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 26 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 27 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 28 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 29 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 3 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 4 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 5 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 6 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 7 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Clearances (Received) | 31-Mar-2023 |
Open official attachment ↗
|
| 2 | CLU Certificate | -- | -- |
Open official attachment ↗
|
| 3 | Copy of Registration as Promoter | -- | -- |
Open official attachment ↗
|
| 4 | Copy of Registration as Promoter | -- | -- |
Open official attachment ↗
|
| 5 | Environment Clearance certificate/ NOC | Approvals (Received) | 19-Sep-2023 |
Open official attachment ↗
|
| 6 | Environment Clearance certificate/ NOC | Approvals (Received) | 18-Jul-2023 |
Open official attachment ↗
|
| 7 | License to develop colony or society from Competent Authority | -- | -- |
Open official attachment ↗
|
| 8 | License to develop colony or society from Competent Authority | -- | -- |
Open official attachment ↗
|
| 9 | NOC from Fire Department/ Chief Fire Officer | Approvals (Received) | 14-Apr-2023 |
Open official attachment ↗
|
| 10 | Other Document (Bank Guarantee) | Approvals (Received) | 19-Aug-2023 |
Open official attachment ↗
|
| 11 | Other Document (Clarification Regarding Area ) | Approvals (Received) | 04-Sep-2023 |
Open official attachment ↗
|
| 12 | Other Document (Mining NOC ) | Approvals (Received) | 03-Jul-2023 |
Open official attachment ↗
|
| 13 | Other Document (PSPCL Demand Letter) | Approvals (Received) | 16-Aug-2023 |
Open official attachment ↗
|
| 14 | Other Document (Solid Waste NOC) | Permissions (Received) | 24-Apr-2023 |
Open official attachment ↗
|
| 15 | Other Document (Submission of BG) | Approvals (Received) | 21-Aug-2023 |
Open official attachment ↗
|
| 16 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 28-Jul-2023 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Collaboration or Joint Development Agreement | -- | -- |
Open official attachment ↗
|
| 2 | Consent details of actual owner of Land | -- | -- |
Open official attachment ↗
|
| 3 | Land Title Deed(s) - In case land is not owned by Promoter | -- | -- |
Open official attachment ↗
|
| 4 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 5 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 6 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 7 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (The Medallion Aurum)
| 1 | Residential ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | TOWER A |
Number of Floor/Plots Currently Sanctioned:
19
Number of Floor/Plots Proposed: 19 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2 | TOWER B |
Number of Floor/Plots Currently Sanctioned:
19
Number of Floor/Plots Proposed: 19 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 3 | TOWER C |
Number of Floor/Plots Currently Sanctioned:
19
Number of Floor/Plots Proposed: 19 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 4 | TOWER D |
Number of Floor/Plots Currently Sanctioned:
19
Number of Floor/Plots Proposed: 19 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 5 | TOWER E |
Number of Floor/Plots Currently Sanctioned:
19
Number of Floor/Plots Proposed: 19 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 6 | TOWER F |
Number of Floor/Plots Currently Sanctioned:
16
Number of Floor/Plots Proposed: 16 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 7 | TOWER G |
Number of Floor/Plots Currently Sanctioned:
16
Number of Floor/Plots Proposed: 16 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 8 | TOWER H |
Number of Floor/Plots Currently Sanctioned:
16
Number of Floor/Plots Proposed: 16 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 9 | TOWER I |
Number of Floor/Plots Currently Sanctioned:
14
Number of Floor/Plots Proposed: 14 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 10 | TOWER J |
Number of Floor/Plots Currently Sanctioned:
14
Number of Floor/Plots Proposed: 14 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 11 | COMMERCIAL SHOPS PLUS STORE |
Number of Floor/Plots Currently Sanctioned:
1
Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Basement | 30387.368 (in sqr Mtrs) | 0 | 0 |
| 2 | Basement | 33429.243 (in sqr Mtrs) | 0 | 0 |
| 3 | Stilt | 8232.785 (in sqr Mtrs) | 0 | 0 |
| 4 | Open | 2921.335 (in sqr Mtrs) | 0 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | As per the Architect details | 0.00 |
| 2 | Drinking Water | As per the Architect details | 0.00 |
| 3 | Street Lighting | As per the Architect details | 0.00 |
| 4 | Rain Water Harvesting | As per the Architect details | 0.00 |
| 5 | Club House | As per the Architect details | 0.00 |
| 6 | Swimming pool | As per the Architect details | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | Self-Development | As per the Architect details | 0.00 |
| 2 | Water Supply System | Self-Development | As per the Architect details | 0.00 |
| 3 | Sewerage and Drainage System | Self-Development | As per the Architect details | 0.00 |
| 4 | Solid Waste Management and Disposal | Self-Development | As per the Architect details | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | DIVYA PARDAL |
Architect
|
Turnstone Realty LLP and 20.07.2020 | NIL Projects |
| Address for Official Communication |
Flat No 203 Divya Apartments GH 21 Sector 27
,
Panchkula , Haryana - 134116 Email: pardaldivya06[at]gmail.com Mobile/Landline Number: 9646792989 |
|||
| 2 | HITESH MISHRA |
Structural Engineer
|
Turnstone Realty LLP and 20.07.2020 | Nil Projects |
| Address for Official Communication |
#383 Gali No 1 Hargobind Enclave Majitha Road
,
Amritsar , Punjab - 143001 Email: hiteshmishra51[at]gmail.com Mobile/Landline Number: 9988524656 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-II (April-June) | 2024 | QUP2024S20242393 | 03-Oct-2024 | Open official attachment ↗ |
| 2 | QTR-I (January-March) | 2024 | QUP2024F20242685 | 15-Oct-2024 | Open official attachment ↗ |
| 3 | QTR-IV (October-December) | 2023 | QUP2023L20243012 | 05-Nov-2024 | Open official attachment ↗ |
| 4 | QTR-III (July-September) | 2024 | QUP2024T20250573 | 20-Jan-2025 | Open official attachment ↗ |
| 5 | QTR-IV (October-December) | 2024 | QUP2024L20250857 | 21-Feb-2025 | Open official attachment ↗ |
| 6 | QTR-I (January-March) | 2025 | QUP2025F20251402 | 16-Apr-2025 | Open official attachment ↗ |
| 7 | QTR-II (April-June) | 2025 | QUP2025S20252838 | 05-Aug-2025 | Open official attachment ↗ |
| 8 | QTR-III (July-September) | 2025 | QUP2025T20254278 | 11-Nov-2025 | Open official attachment ↗ |
| 9 | QTR-IV (October-December) | 2025 | QUP2025L20260075 | 06-Jan-2026 | Open official attachment ↗ |
| 10 | QTR-I (January-March) | 2026 | QUP2026F20261953 | 23-Apr-2026 | Open official attachment ↗ |
| 11 | QTR-II (April-June) | 2026 | QUP2026S20263605 | 15-Jul-2026 | Open official attachment ↗ |
Open official attachment ↗