Horizon Belmond · promoter’s aerial exterior render. Project imagery does not establish current construction progress.
Horizon Group · Mohali
Horizon Belmond
Site 2, Sector 88–89 Dividing Road, Mohali

Promoter claim. Area labels are reproduced from the recorded source; authority-approved unit areas have not been authenticated.
About Horizon Belmond
Horizon Belmond flats: Site 2 on the Sector 88–89 dividing road, Mohali. Read the project identity and checks still needed before a purchase decision.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download BrochurePDF 31 pages 12.6 MB
Supplied developer brochure. Marketing information; confirm current specifications, availability and terms with Acres To Yards.
CHOOSE YOUR CONFIGURATION
Apartment sizes & floor plans
Unit 1; typical floor plan
3 BHK + servant
- Super area
- 2808 sq ft
- Carpet area
- Check the Brochure or Call ATY
Promoter claim. Source DOC-CE908938 · page 1. Authority-approved unit area has not been authenticated.
Enquire about this configuration ↗Amenities
- Park-facing homes
- Three-side-open site
- All-weather indoor pool
- Club Stardom
- Gym
- Yoga
- Games room
- Banquet
- Children's play area
Project information
- Developer brand
- Horizon Group
- Legal promoter
- Horizon Infrastructure and Developers LLP
- Property format
- Flat / apartment
- Configurations
- 3 BHK + servant · 4 BHK + servant
- Registered location
- Group Housing Site No-2 , Sector 88 Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140501
- Project Status
- Status to Verify
- RERA Number
- PBRERA-SAS81-PR0813
- Stage basis
- Current stage / possession unverified — developer/source-reported. This is not independent completion verification or a live stock offer.
- Total project land
- 26369.1 (in sqr mtrs)
- Declared start date
- 01-Apr-2022
- Completion / possession
- 31-Mar-2027 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
- Configurations
- 3 BHK + S, 4 BHK + S; lower/upper penthouse layouts
- Towers
- Seven Belmond towers
- Typical layout
- Two apartments per floor
Published source facts retain their original scope; they do not override the phase-specific records below.
DOCUMENTS & SOURCES
RERA information
PBRERA-SAS81-PR0813 — Horizon Belmond
- Recorded validity
- 31-Mar-2027
- Source review
- 7 September 2026
- Registration scope
- PBRERA-SAS81-PR0813 — Horizon Belmond
Project details recorded in this filing
- Legal promoter
- Horizon Infrastructure and Developers LLP
- Registered project / phase
- Horizon Belmond
- Registered address
- Group Housing Site No-2 , Sector 88 Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140501
- Declared infrastructure
- Underground Storm drainage and Sewerage network system, Rain Water harvesting, Street Lighting, Centralized Sewage Treatment Plant,24x 7 supply of water through centralized Water tank along with Overhead tank, Electrical supply through underground cabling system, Dual water supply network main or treated
- Status at filing
- New Project
- Declared start date
- 01-Apr-2022
- Form B expected completion
- 31-Mar-2027
- Declared specifications
- 1. Structure :- Earth quake resistant structure 2. Flooring :- tile/wooden flooring 3. Wall Finishing :- Paint finish 4. Sanitary Fittings :- as per Standard 5. Electrical Fittings :- as per Standard 6. Kitchen :- Standard Kitchen
- Total project land · sq m
- 26369.1 (in sqr mtrs)
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Extension checks and source qualifications
PROJECT DOCUMENT LIBRARY
Approvals & project filings
Registration scope: PBRERA-SAS81-PR0813. Retrieved 8 September 2026. Each document retains its own conditions; later revisions and current compliance require a separate check.
Government-issued records 7
RERA registration acceptance letter
Punjab Real Estate Regulatory Authority
30 April 2022
PBRERA-SAS81-PR0813; validity recorded to 31 March 2027. This letter accepts registration and states that a separate certificate will follow.
Aviation height NOC
HQ Western Air Command, Indian Air Force
28 December 2021
Conditional construction / height NOC. The document states five-year validity from issue; any extension or later revision needs checking.
GMADA promoter-registration certificate
Greater Mohali Area Development Authority
8 November 2021
Promoter registration records validity from 21 October 2021 to 20 October 2026. This certificate does not itself grant a colony-development licence.
Environmental clearance
SEIAA, Punjab
19 January 2022
EC22B038PB110217. Clearance with conditions for the filed project proposal; this is separate from PPCB consent to establish or operate.
Approval of fire safety arrangements
Mohali Municipal Corporation
30 March 2022
Construction-stage layout approval. The document requires a final Fire Department NOC on completion, before occupancy.
Mining Department permission
Punjab Water Resources / Mining authorities
3 February 2022
Historical conditional permission relating to excavation at Group Housing Site 2, Sector 88. Read all three pages for its scope and conditions.
GMADA allotment letter
Greater Mohali Area Development Authority
18 August 2021
Memo EO/2021/80645 for Group Housing Site 2, Sector 88. Historical allotment record; it does not establish current payment clearance or an unencumbered title.
Plans filed on RERA 15 PDFs
Original filed scans. Exact tower / unit mapping, latest revisions and authority-authenticated unit areas remain to be confirmed.
Approved Layout Plan
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Approved Layout Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Approved Project Site / Location Map
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Approved Project Site OR Location Map. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 01
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 02
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 03
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 04
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 05
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 06
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 07
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 08
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 09
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 10
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 11
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 12
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Building-plan attachment 13
Punjab RERA project filing
Retrieved 8 September 2026
Portal label: Sanctioned Building Plan. Original filed scan; latest revisions and exact tower / unit mapping remain to be confirmed.
Builder declarations & applications 3 PDFs
Submitted declarations and applications retain their source status; portal hosting does not make them issued approvals.
Form B affidavit and declaration
Horizon Infrastructure and Developers LLP
27 April 2022
Promoter affidavit filed on Punjab RERA. Its statements are declarations, including the expected completion date, rather than government-certified findings.
Builder declaration concerning CLU
Horizon Infrastructure and Developers LLP
26 April 2022
Uploaded under “CLU Certificate”, but the attachment is the promoter’s declaration that CLU is not required. No government-issued CLU certificate is contained in this file.
PPCB consent-to-establish application
Horizon Belmond submission to PPCB
28 April 2022 (portal entry)
Application ID 18546483; portal status “Approvals (Applied)”. This is an application, not an issued PPCB consent or NOC.
Still to obtain for this document set: Separate RERA registration certificate; Extension order; Occupancy / completion certificates; Final fire NOC. Absence from this set does not establish that a document has not been issued.
The 2022 registration acceptance letter records six blocks. Mapping these to the catalogue’s seven marketing towers requires confirmation.
Extension checks
no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Exact or punctuation-normalized project name and matching locality reviewed in official register; legal promoter is recorded separately from the catalogue brand.
The filed GMADA letter records historical allotment of Group Housing Site 2. Current dues, title position and later changes remain unverified.
No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- Carpet area for the exact selected configuration.
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Confirm the exact phase, legal promoter, registration and current approvals
- Match the current sanctioned layout and area definitions
- Obtain an itemised current cost sheet and inspect the actual site
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
