Acres To Yards — Built on trust, growing together.

Homeland · Mohali

Homeland Global Business Park

Plot A-40A · pockets M1, M2 and M3 · Industrial Focal Point Phase 8 Extension · Sector 75, Mohali

CommercialUnder Construction
Selected configurationOffice
RERA filed area range495–2,368 Sq Feet
Project locationMohali

Punjab RERA inventory PBRERA-SAS81-PC0419; this category may contain multiple unit or tower rows. Areas are approximate Sq Feet conversions of filed carpet-area entries; match the exact unit and sanctioned drawing.

About Homeland Global Business Park

Homeland Global Business Park brings commercial formats together in Sector 75, Mohali. The latest details supplied to ATY describe an approximately 15-acre development, divided into a 2.5-acre Phase 1 and a 12.5-acre Phase 2. The supplied deck introduces CP Atelier alongside CP One, Homeland 247 and Homeland Business Towers. Explore its location film, design team, floor-use diagrams and the phase-specific retail, office and service-suite rate references below. Marketed phases and brochure components must each be matched to their own registered parcel, permitted use and approved plans.

PROJECT FILM

Explore the location and proposed development

Owner-supplied promotional video, filename dated 6 September 2025. It combines location footage, route graphics and proposed development imagery; travel times, scale and progress shown are historical promotional references, not a current site survey. Original 832 × 464 source; play on demand.

Open video in a new tab ↗

PROJECT REFERENCE · 8 OCTOBER 2026

Latest details supplied to ATY

Figures supplied to ATY on 8 October 2026; not independently verified company quotations. Confirm the selected unit, area basis, applicable taxes and additional charges. These are reference rates, not all-in prices or confirmation of availability.

Phase reference

PhaseLandReported format
Phase 12.5 acresStilt plus 15-storey structure; lower-floor retail and higher-floor offices
Phase 212.5 acresRetail and proposed service suites; brochure phase illustration available, dimensioned component plans awaited

CP Atelier · brochure floor-use guide

LevelUse shown in the supplied deck
Basements 1–3Three basement levels
Ground–second floorsVanilla retail
Third floorMultiplex and family entertainment centre
Fourth floorFood court
Fifth floorRestaurant
Sixth floorBreakout zone
Seventh floorService floor
Eighth–fifteenth floorsPresidential offices

HGP deck, pages 25–34. Illustrative CP Atelier arrangement; not a dimensioned unit layout or confirmation of sanctioned use. Phase 2 references below are separate.

Phase 1 · company rate reference

SpaceRate per Sq Feet
First-floor retail₹30,000
Second-floor retail₹25,000
Offices₹16,500

The owner describes Phase 1 offices as self-use. First- and second-floor availability needs current confirmation; no lease commitment is represented.

Phase 2 · retail rate reference

Facing / floor1,100 Sq Feet and aboveBelow 1,100 Sq Feet
Road-facing · ground floor₹45,000 per Sq Feet₹47,500 per Sq Feet
Inside-facing · ground floor₹38,500 per Sq Feet₹42,500 per Sq Feet
Inside-facing · first floor₹31,000 per Sq Feet₹35,000 per Sq Feet
Inside-facing · second floor₹28,500 per Sq Feet₹32,500 per Sq Feet

Inside-facing and road-facing inventory are different categories. The size bands are quoted pricing thresholds, not verified unit sizes or area classifications.

Phase 2 · proposed upper-floor uses

LevelOwner-supplied reference
Third floorRecreational activities · particulars awaited
Fourth floorArena · particulars awaited
Fifth floor onwardService suites · ₹17,500 per Sq Feet; sizes and layouts awaited

These Phase 2 references do not replace the separate CP Atelier floor-use diagram in the earlier brochure. No hotel operator, residential classification or lease is confirmed.

Confirm the exact phase, inventory, sanctioned use, size basis, taxes and applicable charges through current project documents.

Location charges, common capex and IFMS amounts are withheld until their unit and inventory applicability is established. Possession, payment-plan, lease and return claims remain unverified and are not offered here.

Project highlights

One development, separate components
CP Atelier, CP One, Homeland 247 and Homeland Business Towers are shown in the deck.
Overall land reference
Approx. 15 acres — presentation figure; registered parcels are checked separately.
Planned commercial scale
Approx. 5 million sq ft+ and 1,000 ft+ frontage — brochure claims, not certified unit area.
CP Atelier floor use
Ground–2 retail; 3 multiplex and FEC; 4 food court; 5 restaurant; 6 breakout zone; 7 services; 8–15 presidential offices.
Phase-specific registration
CP Atelier: PC0325, pocket M3. Homeland Global Park: PC0419, pockets M1/M2. Neither establishes approval of every marketed component.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

PDF 38 pages 34.9 MB

CHOOSE YOUR CONFIGURATION

Spaces, sizes & layouts

3 recorded variants

RERA filed inventory · match the exact unit and plan

Office

RERA filed area range
495–2,368 Sq Feet

Additional project plans are shown below. Confirm which plan applies to this configuration.

Punjab RERA inventory PBRERA-SAS81-PC0419; this category may contain multiple unit or tower rows. Source PBRERA-SAS81-PC0419. Filed carpet area is shown in approximate Sq Feet; match the exact unit and sanctioned drawing.

Enquire about this configuration ↗

PROJECT PLANS

CP Atelier floor-use diagram & phase layout references

3 plans

Open a plan to view it in detail. Confirm the exact tower, block, plot or unit in the current approved documents.

The supplied HGP deck includes a location map, CP Atelier floor-use diagram and Phase 1 / Phase 2 illustration. These are brochure references, not dimensioned unit layouts or sanctioned drawings. Exact shop / office plans and individual sizes remain awaited.

Homeland presentation

Location map
CP Atelier · floor-use diagram
Phase 1 and Phase 2 · illustrative site reference

PROJECT SPECIFICATIONS

Specifications

Compare the recorded materials, fittings and project provisions.

  • CP Atelier vertical arrangement

    Three basement levels plus the floor-use arrangement shown in the presentation; exact approved unit plans awaited.

  • Design team named in deck

    Bentel Associates (principal architects), V Consulting (MEP), TPC (structure) and Copperhill (landscape). Appointments have not been independently confirmed.

  • Unit finishes and area schedule

    Check the Brochure or Call ATY

Source & scope

Project-specific specifications retained from the recorded project material. Confirm the applicable phase, selected property and contractual inclusions with ATY.

PROJECT FACILITIES

Amenities

Explore the project’s shared facilities and services.

  • High-street retail

    Ground, first and second floors in the CP Atelier deck.

  • Multiplex & family entertainment

    Third-floor use shown in the CP Atelier presentation.

  • Food court

    Fourth-floor dining format shown in the deck.

  • Restaurant

    Fifth-floor restaurant use shown in the deck.

  • Breakout zone

    Sixth-floor shared breakout space.

  • Presidential offices

    Office floors shown from the eighth to fifteenth levels.

Source & scope

HGP deck, pages 25–34: CP Atelier / Phase 1 proposals. These uses must not be transferred to Phase 2 or treated as operational facilities. Unit plans, approved uses and current availability require confirmation.

View supporting project source ↗

PLAN YOUR VISIT

Location & map

Plot A-40A · pockets M1, M2 and M3 · Industrial Focal Point Phase 8 Extension · Sector 75 · Mohali

Open in Google Maps ↗

Project information

Developer brand
Homeland
Legal promoter
S.A. Global Private Limited — CP Atelier; Homeland Realty Private Limited and Others — M1/M2 directory record
Property format
Commercial
Configurations
Office · Service apartment · Shop / retail
Registered location
Plot A-40A · pockets M1, M2 and M3 · Industrial Focal Point Phase 8 Extension · Sector 75, Mohali
Project Status
Under Construction
RERA Number
PBRERA-SAS81-PC0325 · PBRERA-SAS81-PC0419
Stage basis
Under Construction — owner-confirmed on 23 September 2026. Confirm the selected phase and unit documents.
Project-specific points to clarify
  • The deck’s page 13 prints PBRERA-SAS81-PR0757, which the authority directory identifies as Homeland Regalia in Sector 77. It is not used as a registration for this development. Page 38 correctly names CP Atelier PC0325.
  • The developer website cites PC0419-032026, while the authority directory lists the base registration PC0419 for M1/M2. These records are kept separate from CP Atelier M3.
  • The approx. 15-acre / 5 million sq ft development claims must not be substituted for registered parcel areas, carpet area or saleable unit area.
  • Brochure renders, travel times, catchment and price-growth forecasts are promotional references, not independently verified delivery, traffic, rent or return evidence.

DOCUMENTS & SOURCES

RERA information

23 September 2026

Homeland Global Park · pockets M1/M2 only. Authority HTML captured 16 September 2026. CP Atelier M3 has a separate registration (PC0325); its full HTML is not included in this document.

Recorded registrationPBRERA-SAS81-PC0325

CP Atelier · pocket M3

Recorded validity
Needs confirmation
Source review
23 September 2026
Registration scope
CP Atelier · pocket M3
Project details recorded in this filing
Legal promoter
S.A. Global Private Limited
Registered location
Commercial Pocket M3, A-40A, Phase VIII Extension, Industrial Focal Point, SAS Nagar

Identity matched to the authority directory dated 28 August 2026. Current certificate validity and completion documents not checked. PR0757 printed elsewhere in the deck belongs to Homeland Regalia.

Recorded registrationPBRERA-SAS81-PC0419

Homeland Global Park · pockets M1/M2

Recorded validity
06-Feb-2036
Source review
7 September 2026
Registration scope
Homeland Global Park · pockets M1/M2
Project details recorded in this filing
Legal promoter
HOMELAND REALTY PRIVATE LIMITED
Status at filing
New Project
Declared start date
06-Feb-2026
Registered project / phase
Homeland Global Park
Registered address
Commercial Allocable Pocket M1 M2, INDUSTRIAL FOCAL POINT, , PHASE VIII EXTENSION, Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160059
Declared infrastructure
Retail spaces, Business Towers and Service Apartments
Form B expected completion
06-Feb-2036
Total project land · approx. Sq Feet
5,14,226 Sq Feet

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise. Directory identity rechecked 23 September 2026: Homeland Realty Private Limited and Others; M1/M2 only. This record does not cover CP Atelier M3.

Extension checks and source qualifications

Approval documents & project filings

Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.

Request approval documents ↗

PBRERA-SAS81-PC0325 · extension checks

Obtain the current CP Atelier registration certificate and any extensions.

Identity matched to the authority directory dated 28 August 2026. Current certificate validity and completion documents not checked. PR0757 printed elsewhere in the deck belongs to Homeland Regalia.

PBRERA-SAS81-PC0419 · extension checks

no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise. Directory identity rechecked 23 September 2026: Homeland Realty Private Limited and Others; M1/M2 only. This record does not cover CP Atelier M3.

One owner-requested marketing profile; separate legal registrations. PC0325 covers CP Atelier M3; PC0419 covers Homeland Global Park M1/M2. Confirm each marketed component’s exact mapping; overall brochure scale and another component’s dates or approval cannot be transferred.

GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.

No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Match the selected component to its exact registered land pocket, promoter and sanctioned use.
  • Obtain the current floor plan, unit-area schedule and registration certificate before selecting a unit.

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.

Homeland Global Business Park · enhanced brochure illustration

Homeland Global Business Park · enhanced brochure illustration

AI-enhanced architectural illustration based on the owner-supplied brochure; not a current site photograph

1 / 4
Compare commercial property in Homeland Global Business ParkPlot A-40A · pockets M1, M2 and M3 · Industrial Focal Point Phase 8 Extension · Sector 75, Mohali

Where is Homeland Global Business Park located?

The recorded location is Plot A-40A · pockets M1, M2 and M3 · Industrial Focal Point Phase 8 Extension · Sector 75, Mohali. Use the project location section to check the site context and confirm the specific phase or property before arranging a visit.

Project location and information ↗

Which property types and configurations are recorded for Homeland Global Business Park?

The recorded property format is Commercial. The configuration reference is: Retail, offices, dining, entertainment and serviced residences. These records describe the project; current availability and the exact unit or plot require confirmation.

Compare configurations and area details ↗

Where can I find a brochure for Homeland Global Business Park?

A 38-page brochure is linked on this project page. Read its plans and specifications alongside the project-specific source notes; a brochure is not a current quotation or confirmation of availability.

Open Homeland Global Business Park brochure ↗

Where can I check the RERA information for Homeland Global Business Park?

Open the RERA section for the recorded registration references, documents and qualifications. Check the exact project and phase against the authority record. A recorded number or archived document does not establish current validity, completion or available stock.

Read the RERA information ↗