AI-generated illustrative concept. This image does not depict this project or confirm its interiors, amenities, views or construction status.
Trident Realty · Panchkula
Trident Hills Commercial
Within Trident Hills, Panchkula

Project details will be expanded when verified configuration and size information is available.
About Trident Hills Commercial
Official commercial township component project; only sourced details retained.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download Brochure
File not available
The brochure for Trident Hills Commercial is not available at the moment. Please contact Acres To Yards for assistance.
Emaar Mohali Hills, Mohali, Punjab
CHOOSE YOUR CONFIGURATION
Spaces, sizes & layouts
Configuration details are being completed
Exact component plans and sizes require confirmation before using parent-project information.
Request sizes & layouts ↗PROJECT SPECIFICATIONS
Specifications
Compare the recorded materials, fittings and project provisions.
Specification schedule to confirm
Request the specification schedule applicable to your selected property and phase.
Ask ATY for specifications ↗Source & scope
A project-specific specification schedule is still awaited. No standard list of finishes or infrastructure has been assumed.
PROJECT FACILITIES
Amenities
Explore the project’s shared facilities and services.
Shared facilities to confirm
Request the project’s current amenity schedule and phase-wise access details.
Ask ATY about amenities ↗Source & scope
Facilities retained from the project’s recorded source material. Confirm which belong to the selected phase and which are completed and operational.
View supporting project source ↗PLAN YOUR VISIT
Location & map
Within Trident Hills · Panchkula
Project information
- Developer brand
- Trident Realty
- Property format
- Mixed-use / township
- Configurations
- Commercial township component
- Registered location
- Within Trident Hills, Panchkula
- Project Status
- Under Development
- RERA Number
- HRERA-PKL-PKL-355-2022 · HRERA-PKL-PKL-356-2022 · HRERA-PKL-PKL-782-2025
- Stage basis
- Under Development — owner-confirmed on 23 September 2026. Confirm the selected phase and unit documents.
- Completion / possession
- Source dates require reconciliation — see RERA checks below
Project-specific points to clarify
- Official commercial category linked; specific phases/names still require verification.
DOCUMENTS & SOURCES
RERA information
Parent-project reference only. These registrations are not separate approvals for this component.
Conflicting dates, scope or conditions require authority clarification. The affected source claims remain qualified below.
HRERA-PKL-PKL-355-2022 — Trident Hills1
- Recorded validity
- Needs confirmation
- Source review
- 7 September 2026
- Registration scope
- Parent-project reference only
Project details recorded in this filing
- Registered project / phase
- Trident Hills1
- Legal promoter
- Trident Hills Private Limited
- Registration date printed on certificate
- 30-Sep-2022
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
HRERA-PKL-PKL-356-2022 — Trident Hills2
- Recorded validity
- Needs confirmation
- Source review
- 7 September 2026
- Registration scope
- Parent-project reference only
Project details recorded in this filing
- Registered project / phase
- Trident Hills2
- Legal promoter
- Trident Hills Private Limited
- Registration date printed on certificate
- 30-Sep-2022
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
HRERA-PKL-PKL-782-2025 — Trident Hills 3
- Recorded validity
- Needs confirmation
- Source review
- 7 September 2026
- Registration scope
- Parent-project reference only
Project details recorded in this filing
- Registered project / phase
- Trident Hills 3
- Legal promoter
- Trident Hills Private Limited
- Registration date printed on certificate
- 31-Oct-2025
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Extension checks and source qualifications
Approval documents & project filings
Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.
Request approval documents ↗HRERA-PKL-PKL-355-2022 · extension checks
Source records require reconciliation; do not rely on a single extension or completion date.
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
HRERA-PKL-PKL-356-2022 · extension checks
Source records require reconciliation; do not rely on a single extension or completion date.
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
HRERA-PKL-PKL-782-2025 · extension checks
Source records require reconciliation; do not rely on a single extension or completion date.
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Exact public registered identity matched; product-to-phase/unit-plan match remains required
GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.
No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- The exact property layout and unit / plot identification.
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Confirm the exact phase, legal promoter, registration and current approvals
- Match the current sanctioned layout and area definitions
- Obtain an itemised current cost sheet and inspect the actual site
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
