Acres To Yards — Built on trust, growing together.

STJ Group · Mohali

The Pinnacle

Mohali, near Chandigarh, Mohali

Residential / format to confirmPre Launch
Property formatResidential / format to confirm
Unit sizeCheck the Brochure or Call ATY
Project locationMohali

Project details will be expanded when verified configuration and size information is available.

About The Pinnacle

The Pinnacle is included in STJ Group’s official portfolio. Residential development. Review the exact phase, approved plans, current physical stage and transaction documents before considering a property.

Project images to follow

Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

PDF 46 pages 5.5 MB

Brochure copy from Housing.com. Housing.com-hosted copy; edition and authority approval not authenticated. STJ Group and GB Realty The Pinnacle; last page specifies Sector 83A IT City Mohali. Cover and last page visually matched. Historical marketing information where applicable. Confirm current edition, specifications and terms; this does not authenticate current approvals, possession or unit areas.

CHOOSE YOUR CONFIGURATION

Configurations & layouts

Configuration details are being completed

Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.

Request sizes & layouts ↗

Project information

Developer brand
STJ Group
Legal promoter
KLG Infra
Property format
Residential / format to confirm
Configurations
Residential development
Registered location
Chunnk Site No. 8 , Block-C, 83 Alpha SAS Nagar Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140306
Project Status
Pre Launch
RERA Number
PBRERA-SAS81-PR1166
Stage basis
Developer-reported or legacy official information; not independently verified against current phase-level completion, occupation or registration records.
Total project land
32491.01 (in sqr mtrs)
Declared start date
12-Feb-2025
Completion / possession
31-Jan-2034 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
Published format
Residential development
Published status
Developer portfolio lists upcoming

Published source facts retain their original scope; they do not override the phase-specific records below.

Project-specific points to clarify
  • An exact sector and unit configuration were not established from the official page. Verify them against the project’s current authority records.

DOCUMENTS & SOURCES

RERA information

7 September 2026
Recorded registrationPBRERA-SAS81-PR1166

PBRERA-SAS81-PR1166 — The Pinnacle

Recorded validity
31-Jan-2034
Source review
7 September 2026
Registration scope
PBRERA-SAS81-PR1166 — The Pinnacle
Project details recorded in this filing
Legal promoter
KLG Infra
Status at filing
New Project
Declared start date
12-Feb-2025
Registered project / phase
The Pinnacle
Registered address
Chunnk Site No. 8 , Block-C, 83 Alpha SAS Nagar Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140306
Declared infrastructure
Street Lights, Park, Water Supply, Club House etc
Form B expected completion
31-Jan-2034
Total project land · sq m
32491.01 (in sqr mtrs)

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Extension checks and source qualifications

Approval documents & project filings

Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.

Request approval documents ↗

Extension checks

no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Exact or punctuation-normalized project name and matching locality reviewed in official register; legal promoter is recorded separately from the catalogue brand.

GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.

No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Match the exact legal promoter and separately registered project phase
  • Verify current registration, orders and applicable planning approvals
  • Obtain the exact layout, area basis and current itemised costs
  • Check possession and completion / occupation evidence independently

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.