AI-generated illustrative concept. This image does not depict this project or confirm its interiors, amenities, views or construction status.
STJ Group · Mohali
The Pinnacle
Site No. 8, Block C, Sector 83 Alpha, IT City, Mohali, Mohali

Project details will be expanded when verified configuration and size information is available.
About The Pinnacle
The Pinnacle brings high-rise residential living to Sector 83 Alpha in Mohali’s IT City. Developed by STJ Group, the project sits at Site No. 8, Block C, within the planned sector network. Parks and a clubhouse form part of the filed common-facility programme. Explore the residence categories and recorded plans below to compare the space that suits your household.
ADVERTISED REFERENCE · CURRENT QUOTE TO CONFIRM
Indicative price guide
₹2.2 crore to ₹7.8 croreAsk ATY for today’s unit availability and an itemised cost sheet.
Price reference & source
RE Consult advertisement checked 1 October 2026. This is an undated third-party listing, not a current quotation or an all-in price. Confirm the selected unit, availability, area basis, payment terms and additional charges with ATY.
RE Consult · project advertisement ↗TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download BrochurePDF 46 pages 5.5 MB
CHOOSE YOUR CONFIGURATION
Configurations & layouts
Configuration details are being completed
Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.
Request sizes & layouts ↗Categories and sizes in the RERA filing
These are registered inventory categories, not a current stock list. Areas are approximate Sq Feet conversions of the filing’s carpet-area column. Large multi-unit totals and placeholder values are withheld because they cannot safely be called individual unit sizes.
A displayed range combines filed entries within the same category; it is not the size of every unit. Match the selected unit to its sanctioned drawing before relying on a figure.
PROJECT SPECIFICATIONS
Specifications
Compare the recorded materials, fittings and project provisions.
Construction
MIVAN construction
Flooring
Vitrified tiles
Wall finish
Paint finish
Bathroom fittings
Branded sanitary fittings
Electrical fittings
Branded switches and wires
Kitchen
Modular kitchen
Source & scope
Specifications recorded in the retained Punjab RERA filing, reviewed 7 September 2026. This is a declared finish schedule; brands, room-by-room scope and current contracted inclusions require confirmation.
View supporting project source ↗PROJECT FACILITIES
Amenities
Explore the project’s shared facilities and services.
Park
Clubhouse
Street lighting
Water supply
Source & scope
Facilities recorded in the retained Punjab RERA filing, reviewed 7 September 2026. This identifies proposed provision; current operation and phase scope require confirmation.
View supporting project source ↗PLAN YOUR VISIT
Location & map
Site No. 8, Block C, Sector 83 Alpha, IT City, Mohali · Mohali
Project information
- Developer brand
- STJ Group
- Legal promoter
- KLG Infra
- Property format
- Residential / format to confirm
- Configurations
- Residential development
- Registered location
- Chunnk Site No. 8 , Block-C, 83 Alpha SAS Nagar Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140306
- Project Status
- Pre Launch
- RERA Number
- PBRERA-SAS81-PR1166
- Stage basis
- Developer-reported or legacy official information; not independently verified against current phase-level completion, occupation or registration records.
- Total project land · approx. Sq Feet
- 3,49,730 Sq Feet
- Declared start date
- 12-Feb-2025
- Completion / possession
- 31-Jan-2034 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
- Published format
- Residential development
- Published status
- Developer portfolio lists upcoming
Published source facts retain their original scope; they do not override the phase-specific records below.
Project-specific points to clarify
- An exact sector and unit configuration were not established from the official page. Verify them against the project’s current authority records.
RERA documents
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- The exact property layout and unit / plot identification.
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Match the exact legal promoter and separately registered project phase
- Verify current registration, orders and applicable planning approvals
- Obtain the exact layout, area basis and current itemised costs
- Check possession and completion / occupation evidence independently
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
