SBP Group · Mohali
City of Dreams 6 (Super Tree Tower 1)
Sector 127, village Santemajra, Mohali

Promoter claim. Area labels are reproduced from the recorded source; authority-approved unit areas have not been authenticated.
About City of Dreams 6 (Super Tree Tower 1)
Officially identified residential high-rise project; missing details require further verification.
Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download BrochurePDF 25 pages 15.5 MB
Official developer brochure. Marketing information; confirm current specifications, availability and terms with Acres To Yards.
CHOOSE YOUR CONFIGURATION
Apartment sizes & floor plans
S+29
2 BHK
- Super built-up area
- 1455 sq ft
- Carpet area
- 771 sq ft
- Built-up area
- 1298 sq ft
Promoter claim. Source DOC-A11AA4AA · page 20. Authority-approved unit area has not been authenticated.
Enquire about this configuration ↗Project information
- Developer brand
- SBP Group
- Legal promoter
- CREDO ASSETS PRIVATE LIMITED
- Property format
- Flat / apartment
- Configurations
- 2 BHK · 3 BHK
- Registered location
- Village Sante Majra, HB No 186 , Tehsil Kharar Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140307
- Project Status
- Under Construction
- RERA Number
- PBRERA-SAS80-PR1061
- Stage basis
- Under construction — developer/source-reported. This is not independent completion verification or a live stock offer.
- Total project land
- 12469.359 (in sqr mtrs)
- Declared start date
- 09-Aug-2024
- Completion / possession
- 15-Jul-2031 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
- RERA (developer table)
- PBRERA-SAS80-PR1061
- Configuration (developer page)
- 2 and 3 BHK
- Area / plot size
- 1,455–1,890 sq ft; measurement basis unspecified in page
- RERA (developer table)
- PBRERA-SAS80-PR1061
Published source facts retain their original scope; they do not override the phase-specific records below.
Project-specific points to clarify
- City of Dreams 6 / Super Tree Tower 1 association requires exact tower schedule
DOCUMENTS & SOURCES
RERA information
PBRERA-SAS80-PR1061 — CITY OF DREAM 6
- Recorded validity
- 15-Jul-2031
- Source review
- 7 September 2026
- Registration scope
- PBRERA-SAS80-PR1061 — CITY OF DREAM 6
Project details recorded in this filing
- Legal promoter
- CREDO ASSETS PRIVATE LIMITED
- Status at filing
- New Project
- Declared start date
- 09-Aug-2024
- Registered project / phase
- CITY OF DREAM 6
- Registered address
- Village Sante Majra, HB No 186 , Tehsil Kharar Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140307
- Declared infrastructure
- Metalling of roads and paving of footpaths. as per Public Works Department Specifications Turfing and plantation of trees. Street lighting as per services plan and approved estimates. STP Rain Harvesting System Water works Transformer ETC
- Form B expected completion
- 15-Jul-2031
- Declared specifications
- 1. Structure :- RCC earthquake Structure 2. Flooring :- Vertified Tiles 3. Wall Finishing :- Premium Quality Wall finishing 4. Sanitary Fittings :- Premium qulaity Sanitary 5. Electrical Fittings :- Premium Wires 6. Kitchen :- Modular Kitchen
- Total project land · sq m
- 12469.359 (in sqr mtrs)
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Extension checks and source qualifications
Approval documents & project filings
Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.
Request approval documents ↗Extension checks
no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Website-listed number matched to official register; use exact registered phase below. Product-to-phase mapping still requires the matching plan.
GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.
No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Confirm the exact phase, legal promoter, registration and current approvals
- Match the current sanctioned layout and area definitions
- Obtain an itemised current cost sheet and inspect the actual site
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
