Acres To Yards — Built on trust, growing together.

SBP Group · Rajpura

SBP SIEL Industrial Estate

Charatrampur, Rajpura, Rajpura

IndustrialUnder Construction
Property formatIndustrial
Unit sizeCheck the Brochure or Call ATY
Project locationRajpura

Project details will be expanded when verified configuration and size information is available.

About SBP SIEL Industrial Estate

Officially identified industrial estate project; missing details require further verification.

Project images to follow

Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

File not available

The brochure for SBP SIEL Industrial Estate is not available at the moment. Please contact Acres To Yards for assistance.

Acres To Yards
55-SF, Central Plaza, Sector 105,
Emaar Mohali Hills, Mohali, Punjab

CHOOSE YOUR CONFIGURATION

Configurations & layouts

Configuration details are being completed

Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.

Request sizes & layouts ↗

Project information

Developer brand
SBP Group
Legal promoter
SIEL INDUSTRIAL ESTATE LTD
Property format
Industrial
Configurations
Industrial plots
Registered location
SIEL INDUSTRIAL ESTATE LIMITED, CHARATRAMPUR , TEH. RAJPURA, DIST.. PATIALA Rajpura , Patiala , Punjab - 140401
Project Status
Under Construction
RERA Number
PBRERA-PTL65-PI0015
Stage basis
Under construction in header; body advertises immediate possession — developer/source-reported. This is not independent completion verification or a live stock offer.
Total project land
1711821.78 (in sqr mtrs)
Declared start date
01-Mar-2020
Completion / possession
31-Dec-2027 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
RERA (developer table)
PBRERA-PTL65-PI0015
Configuration (developer page)
Industrial plots
Area / plot size
500–5,000+ sq yd
Site area
400+ acres

Published source facts retain their original scope; they do not override the phase-specific records below.

Project-specific points to clarify
  • Industrial-use / red-zone and immediate-possession claims are developer statements only; reconcile with under-construction header and regulatory permissions.

DOCUMENTS & SOURCES

RERA information

7 September 2026
Recorded registrationPBRERA-PTL65-PI0015

PBRERA-PTL65-PI0015 — SIEL INDUSTRIAL ESTATE LIMITED

Recorded validity
19-Sep-2029
Source review
7 September 2026
Registration scope
PBRERA-PTL65-PI0015 — SIEL INDUSTRIAL ESTATE LIMITED
Project details recorded in this filing
Legal promoter
SIEL INDUSTRIAL ESTATE LTD
Registered project / phase
SIEL INDUSTRIAL ESTATE LIMITED
Registered address
SIEL INDUSTRIAL ESTATE LIMITED, CHARATRAMPUR , TEH. RAJPURA, DIST.. PATIALA Rajpura , Patiala , Punjab - 140401
Declared infrastructure
Storm water drainage system, rain water harvesting, hydrant water supply, Sewerage disposal system, raw water supply for flushing, Maintenance of Green Area, Street Lighting, power distribution system,
Status at filing
New Project
Declared start date
01-Mar-2020
Form B expected completion
31-Dec-2027
Total project land · sq m
1711821.78 (in sqr mtrs)

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Extension checks and source qualifications

Approval documents & project filings

Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.

Request approval documents ↗

Extension checks

no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Website-listed number matched to official register; use exact registered phase below. Product-to-phase mapping still requires the matching plan.

GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.

No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Confirm the exact phase, legal promoter, registration and current approvals
  • Match the current sanctioned layout and area definitions
  • Obtain an itemised current cost sheet and inspect the actual site

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.