Acres To Yards — Built on trust, growing together.

Omaxe · New Chandigarh

Clockton High Street

Omaxe New Chandigarh, New Chandigarh

CommercialCompleted
Property formatCommercial
Unit sizeCheck the Brochure or Call ATY
Project locationNew Chandigarh

Project details will be expanded when verified configuration and size information is available.

About Clockton High Street

Clockton High Street is listed in Omaxe’s regional portfolio. Review the exact phase, legal identity, location and current project disclosures before making a decision.

Project images to follow

Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

PDF 4 pages 1.4 MB

Official developer brochure. Marketing information; confirm current specifications, availability and terms with Acres To Yards.

CHOOSE YOUR CONFIGURATION

Spaces, sizes & layouts

Configuration details are being completed

The recorded sources need clarification before exact variants can be displayed.

Request sizes & layouts ↗

Project information

Developer brand
Omaxe
Legal promoter
Omaxe New Chandigarh Developers Private Ltd.
Property format
Commercial
Configurations
Shopping complex and office spaces
Registered location
Omaxe New Chandigarh , Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901
Project Status
Completed
RERA Number
PBRERA-SAS80-PC0005
Stage basis
Delivered — developer/source-reported. This is not independent completion verification or a live stock offer.
Total project land
1497.34 (in sqr mtrs)
Declared start date
01-Mar-2014
Completion / possession
Source dates require reconciliation — see RERA checks below
Further published project details
Configuration / offering
Shopping complex and office spaces
Project type as labelled in current header
Shopping Complex & Office Spaces
RERA
PBRERA-SAS80-PC0005

Published source facts retain their original scope; they do not override the phase-specific records below.

DOCUMENTS & SOURCES

RERA information

7 September 2026

Conflicting dates, scope or conditions require authority clarification. The affected source claims remain qualified below.

Recorded registrationPBRERA-SAS80-PC0005

PBRERA-SAS80-PC0005 — Commercial-1 of Mega Residential project at Mullanpur (New Chandigarh Master Plan)

Recorded validity
Needs confirmation
Source review
7 September 2026
Registration scope
PBRERA-SAS80-PC0005 — Commercial-1 of Mega Residential project at Mullanpur (New Chandigarh Master Plan)
Project details recorded in this filing
Legal promoter
Omaxe New Chandigarh Developers Private Ltd.
Status at filing
On-going
Declared start date
01-Mar-2014
Registered project / phase
Commercial-1 of Mega Residential project at Mullanpur (New Chandigarh Master Plan)
Registered address
Omaxe New Chandigarh , Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901
Declared infrastructure
Project Approved by PUDA,Pollution free atmosphere complete developed infrastructure.Site is on 200 ft wide Sector Road.24 hours power back up facility .Wide road with comfortable traffic circulation and ample parking facilities in basement and surface.equipped with fire fighting system.
Total project land · sq m
1497.34 (in sqr mtrs)

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Extension checks and source qualifications

Approval documents & project filings

Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.

Request approval documents ↗

Extension checks

CONFLICT — extension search column shows 24-Apr-2023, but the linked signed order (p. 1), dated 24-Apr-2023, Memo RERA/Pb/EG(R)/2023/4412, expressly grants extension under Section 8 through 31-Dec-2023. Both were checked on 07-Sep-2026. Use the attributed signed-order endpoint for research and retain the portal discrepancy; a later completion or renewal outcome still requires verification.

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Website-listed number matched to official register; use exact registered phase below. Product-to-phase mapping still requires the matching plan.

GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.

No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Confirm the exact phase, legal promoter, registration and current approvals
  • Match the current sanctioned layout and area definitions
  • Obtain an itemised current cost sheet and inspect the actual site

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.