Acres To Yards — Built on trust, growing together.

Jubilee Group · Mohali

Techyards

Sector 102-A, adjoining IT City, Mohali, Mohali

Mixed-use / townshipUnder Construction
Selected configurationIT plot
Plot area500 sq yd
Project locationMohali

Promoter claim. Area labels are reproduced from the recorded source; authority-approved unit areas have not been authenticated.

About Techyards

Techyards is listed in Jubilee Group’s regional portfolio. Review the exact phase, legal identity, location and current project disclosures before making a decision.

Project images to follow

Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

PDF 16 pages 9.9 MB

Official developer brochure. Marketing information; confirm current specifications, availability and terms with Acres To Yards.

CHOOSE YOUR CONFIGURATION

Spaces, sizes & layouts

1 recorded variants

Plot on 60 ft road

IT plot

Plot area
500 sq yd

Promoter claim. Source DOC-C49B2999 · page 9. Authority-approved unit area has not been authenticated.

Enquire about this configuration ↗

Project information

Developer brand
Jubilee Group
Legal promoter
Jubilee Joy Homes LLP
Property format
Mixed-use / township
Configurations
IT plot
Registered location
Jubilee Techyards , Village Derri (H.B. No. 283) & Village Bathlana (H.B. No. 284) Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140307
Project Status
Under Construction
RERA Number
PBRERA-SAS81-PI0032
Stage basis
ongoing — developer/source-reported. This is not independent completion verification or a live stock offer.
Total project land
94975.663 (in sqr mtrs)
Declared start date
03-Dec-2025
Completion / possession
02-Dec-2030 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
Configuration / offering
Phase 1: IT plots, independent SCO plots, office suites and high-rise residences; Phase 2: residential floors
RERA
PBRERA-SAS81-PI0032-022026

Published source facts retain their original scope; they do not override the phase-specific records below.

DOCUMENTS & SOURCES

RERA information

7 September 2026
Recorded registrationPBRERA-SAS81-PI0032

PBRERA-SAS81-PI0032 — Jubilee Techyards

Recorded validity
02-Dec-2030
Source review
7 September 2026
Registration scope
PBRERA-SAS81-PI0032 — Jubilee Techyards
Project details recorded in this filing
Legal promoter
Jubilee Joy Homes LLP
Status at filing
New Project
Declared start date
03-Dec-2025
Registered project / phase
Jubilee Techyards
Registered address
Jubilee Techyards , Village Derri (H.B. No. 283) & Village Bathlana (H.B. No. 284) Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140307
Declared infrastructure
IT Park Project in line with Guidelines with Road Network, Parking Area, Sewerage, Street Light, STP, Water Supply Network, Disposal Network, Electricity Network will be facilitated in the project.
Form B expected completion
02-Dec-2030
Total project land · sq m
94975.663 (in sqr mtrs)

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Extension checks and source qualifications

Approval documents & project filings

Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.

Request approval documents ↗

Extension checks

no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Project/phase name, legal promoter and locality reviewed. An umbrella catalogue entry may cover several separate registrations; do not transfer dates, approvals or unit sizes between them.

GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.

No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Confirm the exact phase, legal promoter, registration and current approvals
  • Match the current sanctioned layout and area definitions
  • Obtain an itemised current cost sheet and inspect the actual site

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.

Techyards · IT plot layout

Techyards · IT plot layout

Promoter claim · DOC-C49B2999 · page 9

Open full-size plan ↗