Highland Lifespaces official project imagery · illustrative where rendered. Project imagery does not establish current construction progress.
Highland Lifespaces · Lalru
Highland Industrial City
Lalru–Mianpur Road · Tohffapur · Chandigarh–Ambala Road region, Lalru

Project details will be expanded when verified configuration and size information is available.
About Highland Industrial City
An integrated development in Lalru with industrial, residential and commercial components. Highland describes a 100+ acre development and publishes a Phase I industrial master plan. Project acreage is not an individual plot size; confirm the exact phase and plot.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download BrochurePDF 13 pages 26.5 MB
Official developer brochure. Marketing information; confirm current specifications, availability and terms with Acres To Yards.
CHOOSE YOUR CONFIGURATION
Plot sizes & layouts
Configuration details are being completed
Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.
Request sizes & layouts ↗Amenities
- Wide internal roads — proposed
- Weighing bridge — proposed
- Daily convenience store — proposed
- Dispensary — proposed
- Solid-waste disposal — proposed
- Drivers’ resting area — proposed
Project information
- Developer brand
- Highland Lifespaces
- Property format
- Industrial, residential & commercial plots
- Configurations
- Industrial plots, residential plots and commercial spaces
- Registered location
- Lalru–Mianpur Road · Tohffapur · Chandigarh–Ambala Road region, Lalru
- Project Status
- Under Construction
- RERA Number
- Exact registration match not established
- Stage basis
- Developer-published portfolio classification, reviewed 8 September 2026. Current physical progress, completion / occupancy documents and availability require confirmation.
Further published project details
- Development area
- 100+ acres — developer-described project extent
- Brochure registration reference
- PBRERA-SAS79-PR0974 — printed in the developer brochure; exact current authority match pending
- Developer brochure · PDF
- Phase I industrial master plan and proposed facilities; not an authority approval
Published source facts retain their original scope; they do not override the phase-specific records below.
Project-specific points to clarify
- The developer brochure prints a RERA reference; a matched signed registration, phase scope and current validity remain to be checked.
- Government benefit, subsidy and approval claims in promotional material are not treated as independently verified entitlements.
DOCUMENTS & SOURCES
RERA information
Registration documents to confirm
An exact official registration match has not been established in the checked sources. This does not establish that the project is unregistered.
Request the registration documents ↗Extension checks and source qualifications
Approval documents & project filings
The project’s matched approval PDFs and filing links are awaited.
Request approval documents ↗Developer-published project information. Exact current registration and approval documents remain to be matched.
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- The exact property layout and unit / plot identification.
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Match the exact project phase, legal promoter and current registration documents.
- Confirm the sanctioned unit plan, area definitions and contractual inclusions.
- Obtain current availability, an itemised cost sheet and a site inspection.
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
