Acres To Yards — Built on trust, growing together.

Highland Lifespaces · Lalru

Highland Industrial City

Lalru–Mianpur Road · Tohffapur · Chandigarh–Ambala Road region, Lalru

Industrial, residential & commercial plotsUnder Construction
Property formatIndustrial, residential & commercial plots
Unit sizeCheck the Brochure or Call ATY
Project locationLalru

Project details will be expanded when verified configuration and size information is available.

About Highland Industrial City

An integrated development in Lalru with industrial, residential and commercial components. Highland describes a 100+ acre development and publishes a Phase I industrial master plan. Project acreage is not an individual plot size; confirm the exact phase and plot.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

PDF 13 pages 26.5 MB

Official developer brochure. Marketing information; confirm current specifications, availability and terms with Acres To Yards.

CHOOSE YOUR CONFIGURATION

Plot sizes & layouts

Configuration details are being completed

Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.

Request sizes & layouts ↗

Amenities

  • Wide internal roads — proposed
  • Weighing bridge — proposed
  • Daily convenience store — proposed
  • Dispensary — proposed
  • Solid-waste disposal — proposed
  • Drivers’ resting area — proposed

Project information

Developer brand
Highland Lifespaces
Property format
Industrial, residential & commercial plots
Configurations
Industrial plots, residential plots and commercial spaces
Registered location
Lalru–Mianpur Road · Tohffapur · Chandigarh–Ambala Road region, Lalru
Project Status
Under Construction
RERA Number
Exact registration match not established
Stage basis
Developer-published portfolio classification, reviewed 8 September 2026. Current physical progress, completion / occupancy documents and availability require confirmation.
Further published project details
Development area
100+ acres — developer-described project extent
Brochure registration reference
PBRERA-SAS79-PR0974 — printed in the developer brochure; exact current authority match pending
Developer brochure · PDF
Phase I industrial master plan and proposed facilities; not an authority approval

Published source facts retain their original scope; they do not override the phase-specific records below.

Project-specific points to clarify
  • The developer brochure prints a RERA reference; a matched signed registration, phase scope and current validity remain to be checked.
  • Government benefit, subsidy and approval claims in promotional material are not treated as independently verified entitlements.

DOCUMENTS & SOURCES

RERA information

8 September 2026

Registration documents to confirm

An exact official registration match has not been established in the checked sources. This does not establish that the project is unregistered.

Request the registration documents ↗
Extension checks and source qualifications

Approval documents & project filings

The project’s matched approval PDFs and filing links are awaited.

Request approval documents ↗

Developer-published project information. Exact current registration and approval documents remain to be matched.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Match the exact project phase, legal promoter and current registration documents.
  • Confirm the sanctioned unit plan, area definitions and contractual inclusions.
  • Obtain current availability, an itemised cost sheet and a site inspection.

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.

Highland Industrial City · developer project image

Highland Industrial City · developer project image

Highland Lifespaces official project imagery · illustrative where rendered