Acres To Yards — Built on trust, growing together.

GMADA · New Chandigarh

Eco City 2

Eco City Phase II, New Chandigarh, New Chandigarh

PlotCurrent stage to confirm
Property formatPlot
Unit sizeCheck the Brochure or Call ATY
Project locationNew Chandigarh

Project details will be expanded when verified configuration and size information is available.

About Eco City 2

Eco City Phase II is a separate GMADA development. The authority’s historical works record identifies Phase II land development. Separate extensions and private projects in the surrounding area require their own records.

Project images to follow

Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

PDF 28 pages 2.2 MB

Official-source brochure copy. Historical allotment scheme brochure: opens 7 December 2020, closes 14 January 2021. Not a current sale offer. GMADA Eco City-2 New Chandigarh, printed PBRERA-SAS81-PM0152. Cover, scheme dates and back visually checked. Historical 2020-21 allotment scheme, not a current offer. Historical marketing information where applicable. Confirm current edition, specifications and terms; this does not authenticate current approvals, possession or unit areas.

CHOOSE YOUR CONFIGURATION

Plot sizes & layouts

Configuration details are being completed

Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.

Request sizes & layouts ↗

Project information

Developer brand
GMADA
Legal promoter
Greater Mohali Area Development Authority (GMADA)
Property format
Plot
Configurations
Plotted development; phase, extension and use must be matched
Registered location
Eco city-2 , New Chandigarh , Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055
Project Status
Status to Verify
RERA Number
PBRERA-SAS81-PM0152
Stage basis
Scheme-level public information only. Historical works or announcements do not confirm the present status, possession or availability of an individual property.
Total project land
1219674.13 (in sqr mtrs)
Declared start date
04-Nov-2016
Completion / possession
31-Mar-2023 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
Scheme identity
Eco City 2 · Eco City Phase II, New ChandigarhOfficial source ↗
Evidence scope
Public scheme reference, not a current unit-level verification.Official source ↗

Published source facts retain their original scope; they do not override the phase-specific records below.

Project-specific points to clarify
  • Historical works reference: https://www.gmada.gov.in/sites/default/files/documents/GMADA-MANUAL-17-16062022.pdf
  • Do not apply the status or registration of Phase I or a private apartment project to this scheme.

DOCUMENTS & SOURCES

RERA information

7 September 2026
Recorded registrationPBRERA-SAS81-PM0152

PBRERA-SAS81-PM0152 — Eco city -2 (New Chandigarh)

Recorded validity
31-Mar-2023
Source review
7 September 2026
Registration scope
PBRERA-SAS81-PM0152 — Eco city -2 (New Chandigarh)
Project details recorded in this filing
Legal promoter
Greater Mohali Area Development Authority (GMADA)
Status at filing
On-going
Declared start date
04-Nov-2016
Registered project / phase
Eco city -2 (New Chandigarh)
Registered address
Eco city-2 , New Chandigarh , Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055
Declared infrastructure
a. Roads as per MORTH, IRC specification b. Public Health Services i.e. water supply, sewerage, storm drainage, STP as per CPHEEO,BIS norms c. Electrical distribution system as per PSPCL norms d. Horticulture works as per requirements.
Form B expected completion
31-Mar-2023
Total project land · sq m
1219674.13 (in sqr mtrs)

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Extension checks and source qualifications

Approval documents & project filings

Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.

Request approval documents ↗

Extension checks

no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.

Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.

Project/phase name, legal promoter and locality reviewed. An umbrella catalogue entry may cover several separate registrations; do not transfer dates, approvals or unit sizes between them.

GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.

No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Match the exact scheme, block, property and current holder in authority records
  • Check the latest allotment or LOI, permitted use, dues and transfer conditions
  • Establish possession, services and applicable completion or occupation documents
  • Obtain independent legal review before paying or signing

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.