GMADA · New Chandigarh
Eco City 2
Eco City Phase II, New Chandigarh, New Chandigarh
Project details will be expanded when verified configuration and size information is available.
About Eco City 2
Eco City Phase II is a separate GMADA development. The authority’s historical works record identifies Phase II land development. Separate extensions and private projects in the surrounding area require their own records.
Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download BrochurePDF 28 pages 2.2 MB
Official-source brochure copy. Historical allotment scheme brochure: opens 7 December 2020, closes 14 January 2021. Not a current sale offer. GMADA Eco City-2 New Chandigarh, printed PBRERA-SAS81-PM0152. Cover, scheme dates and back visually checked. Historical 2020-21 allotment scheme, not a current offer. Historical marketing information where applicable. Confirm current edition, specifications and terms; this does not authenticate current approvals, possession or unit areas.
CHOOSE YOUR CONFIGURATION
Plot sizes & layouts
Configuration details are being completed
Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.
Request sizes & layouts ↗Project information
- Developer brand
- GMADA
- Legal promoter
- Greater Mohali Area Development Authority (GMADA)
- Property format
- Plot
- Configurations
- Plotted development; phase, extension and use must be matched
- Registered location
- Eco city-2 , New Chandigarh , Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055
- Project Status
- Status to Verify
- RERA Number
- PBRERA-SAS81-PM0152
- Stage basis
- Scheme-level public information only. Historical works or announcements do not confirm the present status, possession or availability of an individual property.
- Total project land
- 1219674.13 (in sqr mtrs)
- Declared start date
- 04-Nov-2016
- Completion / possession
- 31-Mar-2023 — Form B expected completion; confirm the buyer-agreement possession date
Further published project details
- Scheme identity
- Eco City 2 · Eco City Phase II, New ChandigarhOfficial source ↗
- Evidence scope
- Public scheme reference, not a current unit-level verification.Official source ↗
Published source facts retain their original scope; they do not override the phase-specific records below.
Project-specific points to clarify
- Historical works reference: https://www.gmada.gov.in/sites/default/files/documents/GMADA-MANUAL-17-16062022.pdf
- Do not apply the status or registration of Phase I or a private apartment project to this scheme.
DOCUMENTS & SOURCES
RERA information
PBRERA-SAS81-PM0152 — Eco city -2 (New Chandigarh)
- Recorded validity
- 31-Mar-2023
- Source review
- 7 September 2026
- Registration scope
- PBRERA-SAS81-PM0152 — Eco city -2 (New Chandigarh)
Project details recorded in this filing
- Legal promoter
- Greater Mohali Area Development Authority (GMADA)
- Status at filing
- On-going
- Declared start date
- 04-Nov-2016
- Registered project / phase
- Eco city -2 (New Chandigarh)
- Registered address
- Eco city-2 , New Chandigarh , Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055
- Declared infrastructure
- a. Roads as per MORTH, IRC specification b. Public Health Services i.e. water supply, sewerage, storm drainage, STP as per CPHEEO,BIS norms c. Electrical distribution system as per PSPCL norms d. Horticulture works as per requirements.
- Form B expected completion
- 31-Mar-2023
- Total project land · sq m
- 1219674.13 (in sqr mtrs)
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Extension checks and source qualifications
Approval documents & project filings
Available official filing and attachment links are listed below. A curated PDF library will appear here when the exact documents are added and their types are confirmed.
Request approval documents ↗Extension checks
no matching row found among the 434 results searched on 7 September 2026. This is a limited search result, not proof that no extension exists.
Source-declared registration information, not a current site inspection, title certificate or contractual possession promise.
Project/phase name, legal promoter and locality reviewed. An umbrella catalogue entry may cover several separate registrations; do not transfer dates, approvals or unit sizes between them.
GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.
No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- The exact property layout and unit / plot identification.
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Match the exact scheme, block, property and current holder in authority records
- Check the latest allotment or LOI, permitted use, dues and transfer conditions
- Establish possession, services and applicable completion or occupation documents
- Obtain independent legal review before paying or signing
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
