Acres To Yards — Built on trust, growing together.

GMADA · Mohali

Aerotropolis

Aerotropolis scheme, SAS Nagar / Mohali, Mohali

Mixed-use / townshipCurrent stage to confirm
Property formatMixed-use / township
Unit sizeCheck the Brochure or Call ATY
Project locationMohali

Project details will be expanded when verified configuration and size information is available.

About Aerotropolis

Aerotropolis appears in GMADA’s development, land-acquisition and land-pooling notices. The stage and rights depend on the particular pocket and instrument. An acquisition notice or LOI does not establish a ready-to-build plot.

Project images to follow

Project-specific exterior images will appear here when available. Recorded plans are shown under Sizes & layouts.

TAKE A CLOSER LOOK

Project brochure

Explore the project at your own pace. Our team can help with the details that matter to you.

Download Brochure

File not available

The brochure for Aerotropolis is not available at the moment. Please contact Acres To Yards for assistance.

Acres To Yards
55-SF, Central Plaza, Sector 105,
Emaar Mohali Hills, Mohali, Punjab

CHOOSE YOUR CONFIGURATION

Spaces, sizes & layouts

Configuration details are being completed

Ask for the current product sizes and layouts. Project-specific variants will appear here as the information is added.

Request sizes & layouts ↗

Project information

Developer brand
GMADA
Legal promoter
Greater Mohali Area Development Authority (GMADA)
Property format
Mixed-use / township
Configurations
Pocket-specific authority development and land-pooling entitlements
Registered location
Aerotropolis scheme, SAS Nagar / Mohali, Mohali
Project Status
Status to Verify
RERA Number
Exact registration match not established
Stage basis
Scheme-level public information only. Historical works or announcements do not confirm the present status, possession or availability of an individual property.
Further published project details
Scheme identity
Aerotropolis · Aerotropolis scheme, SAS Nagar / MohaliOfficial source ↗
Evidence scope
Public scheme reference, not a current unit-level verification.Official source ↗

Published source facts retain their original scope; they do not override the phase-specific records below.

Project-specific points to clarify
  • Read the LOI guide and verify the latest valid instrument, entitlement and authority transfer rules.
  • No universal plot-allotment date, transfer permission or investment return is promised.

DOCUMENTS & SOURCES

RERA information

7 September 2026

Registration documents to confirm

An exact official registration match has not been established in the checked sources. This does not establish that the project is unregistered.

Request the registration documents ↗
Extension checks and source qualifications

Approval documents & project filings

The project’s matched approval PDFs and filing links are awaited.

Request approval documents ↗

No exact registration identity established in this pass

GMADA auction origin has not been verified for this project. Ask for the matched auction/allotment and title documents.

No independently verified total is published. Portal declarations and name-only search matches are not a litigation clearance or a count of unique cases.

Registration, an application, an extension, completion and possession have different meanings. A Form B date is not a contractual possession promise.

BEFORE SELECTING A PROPERTY

Details to confirm for your selection

  • The exact property layout and unit / plot identification.
  • Current availability, itemised cost sheet and payment schedule.
  • Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
  • Match the exact scheme, block, property and current holder in authority records
  • Check the latest allotment or LOI, permitted use, dues and transfer conditions
  • Establish possession, services and applicable completion or occupation documents
  • Obtain independent legal review before paying or signing

Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.