AI-generated illustrative concept. This image does not depict this project or confirm its interiors, amenities, views or construction status.
Horizon Group · Mohali
Belmond Drive 88 (within Belmond)
Site 2, Sector 88–89 Dividing Road, Mohali

Project details will be expanded when verified configuration and size information is available.
About Belmond Drive 88 (within Belmond)
Official commercial built-up dss / retail project; only sourced details retained.
TAKE A CLOSER LOOK
Project brochure
Explore the project at your own pace. Our team can help with the details that matter to you.
Download Brochure
File not available
The brochure for Belmond Drive 88 (within Belmond) is not available at the moment. Please contact Acres To Yards for assistance.
Emaar Mohali Hills, Mohali, Punjab
CHOOSE YOUR CONFIGURATION
Spaces, sizes & layouts
Configuration details are being completed
Exact component plans and sizes require confirmation before using parent-project information.
Request sizes & layouts ↗SIZE DETAILS TO VERIFY
Download RERA Documents for Details
The filing does not establish a reliable size for an individual property here. Review the archived RERA record, then confirm the exact unit and layout with ATY.
PROJECT SPECIFICATIONS
Specifications
Compare the recorded materials, fittings and project provisions.
Specification schedule to confirm
Request the specification schedule applicable to your selected property and phase.
Ask ATY for specifications ↗Source & scope
A project-specific specification schedule is still awaited. No standard list of finishes or infrastructure has been assumed.
PROJECT FACILITIES
Amenities
Explore the project’s shared facilities and services.
Speciality retail
Services
Restaurants
Source & scope
Facilities retained from the project’s recorded source material. Confirm which belong to the selected phase and which are completed and operational.
View supporting project source ↗PLAN YOUR VISIT
Location & map
Site 2, Sector 88–89 Dividing Road · Mohali
Project information
- Developer brand
- Horizon Group
- Property format
- Commercial
- Configurations
- Commercial built-up DSS / retail
- Registered location
- Site 2, Sector 88–89 Dividing Road, Mohali
- Project Status
- Under Construction
- RERA Number
- PBRERA-SAS81-PR0813
- Stage basis
- Under Construction — owner-confirmed on 23 September 2026. Confirm the selected phase and unit documents.
- Completion / possession
- Exact component date needs confirmation; parent-project dates are not substituted
Further published project details
- Format
- Built-Up-DSS
Published source facts retain their original scope; they do not override the phase-specific records below.
Project-specific points to clarify
- Commercial component of Belmond; registration not separately verified.
RERA documents
BEFORE SELECTING A PROPERTY
Details to confirm for your selection
- The exact property layout and unit / plot identification.
- Current availability, itemised cost sheet and payment schedule.
- Current physical progress, applicable completion / occupancy documents and buyer-agreement dates.
- Confirm the exact phase, legal promoter, registration and current approvals
- Match the current sanctioned layout and area definitions
- Obtain an itemised current cost sheet and inspect the actual site
Base consideration, parking, location charges, duties, taxes, fit-outs and recurring charges should be included in the complete cost review.
