Promoter Details (Other Than Individual)
| PUMA REALTORS PRIVATE LIMITED | Private Limited Company | ||
| Main Objects of Organization | Real Estate Promoter & Developer | ||
| Registered Address of Organization |
8-D, Hansalaya-15
,
Barakhamba Road
New Delhi , Delhi - 110001 |
||
| Official Address |
8-D, Hansalaya-15
,
Barakhamba Road
New Delhi , Delhi - 110001 |
||
| 1 (in years) | 16 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | DIRECTOR | APOORV JAIN |
C-479,
,
Defence Colony
South Delhi , Delhi - 110024 Email: apoorv[at]onecity.in |
|
| 2 | DIRECTOR | SUNIL KUMAR JAIN |
C-479,
,
Defence Colony
South Delhi , Delhi - 110024 Email: sjain[at]onecity.in |
|
| 3 | Authorised Signatory | Udit Jain |
C-479,
,
Defence Colony
South Delhi , Delhi - 110024 Email: udit[at]onecity.in |
|
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | One City Hamlet | On-going | 5139.5 | 11-Apr-2008 | 30-Sep-2019 | 30-Sep-2019 |
| 2 | One City Hamlet 1 | Complete | 106392 | 11-Apr-2008 | 30-Jun-2017 | 30-Jun-2017 |
| 3 | One RISE P2 | Complete | 14123.53 | 18-Jan-2012 | 01-Mar-2018 | 01-Mar-2018 |
| 4 | One City Hamlet -2 | On-going | 29501.58 | 15-May-2013 | 31-Dec-2022 | 31-Dec-2022 |
| 5 | One Rise P-1 | Complete | 16915.86 | 24-Jun-2014 | 31-Dec-2023 | 31-Dec-2023 |
| 6 | One City Hamlet C-1 | On-going | 12231.14 | 27-Mar-2017 | 31-Dec-2021 | 31-Dec-2021 |
| 7 | One City Hub | On-going | 18271.42 | 30-Jun-2017 | 31-Dec-2020 | 31-Dec-2020 |
| 8 | One City Hamlet D-105 | On-going | 13233.22 | 27-Mar-2018 | 31-Dec-2021 | 31-Dec-2021 |
| 9 | One City Hamlet-4 | On-going | 60864.721 | 27-Mar-2018 | 31-Dec-2022 | 31-Dec-2022 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | One RISE P2 | AJAY GANDOTRA | CC/564/2017 | SCDRC-UT-CHD |
| 2 | One RISE P2 | HARDISH KUMAR SHARMA AND ANR. | CC/961/2016 | SCDRC-UT-CHD |
| 3 | One RISE P2 | VIKAS MALIK | CC/58/2017 | SCDRC-Punjab |
| 4 | One RISE P2 | BALDEV SINGH | CC/553/2017 | SCDRC-UT-CHD |
| 5 | One RISE P2 | SACHIN MAHAJAN | CC/565/2017 | SCDRC-UT-CHD |
| 6 | One RISE P2 | PARVESH KUMAR | CC/962/2016 | SCDRC-UT-CHD |
| 7 | One RISE P2 | CHETAN MAHAJAN | CC/59/2017 | SCDRC-Punjab |
| 8 | One RISE P2 | ANIL TARACHAND | CC/622/2017 | SCDRC-UT-CHD |
| 9 | One RISE P2 | VIKAS MALIK | CC/691/2017 | SCDRC-UT-CHD |
| 10 | One RISE P2 | RAKESH KUMAR GUPTA | CC/540/2017 | SCDRC-UT-CHD |
| 11 | One RISE P2 | ARUSHI PARMAR | CC/199/2017 | SCDRC-UT-CHD |
| 12 | One RISE P2 | GOLDY CHADHA | CC/711/2017 | SCDRC-UT-CHD |
| 13 | One RISE P2 | RAJIV GUPTA AND ANR | CC/397/2017 | SCDRC-UT-CHD |
| 14 | One RISE P2 | SUKHJEET SINGH | CC/202/2017 | SCDRC-UT-CHD |
| 15 | One RISE P2 | AJAY KUMAR SONI | CC/108/2018 | SCDRC-UT-CHD |
| 16 | One RISE P2 | Mrs. PRADEEP BRAR | CC/516/2017 | SCDRC-UT-CHD |
| 17 | One RISE P2 | JASMEET KAUR | CC/243/2017 | SCDRC-UT-CHD |
| 18 | One RISE P2 | RAMESH CHANDER SHARMA | CC/762/2017 | SCDRC-UT-CHD |
| 19 | One RISE P2 | SUMEET CHADHA | CC/57/2017 | SCDRC-Punjab |
| 20 | One RISE P2 | CHETAN MAHAJAN | CC/59/2017 | SCDRC-Punjab |
| 21 | One RISE P2 | GAUTAM CHAWLA | CC/810/2017 | SCDRC-UT-CHD |
| 22 | One RISE P2 | SATBIR SINGH | CC/833/2017 | SCDRC-UT-CHD |
| 23 | One RISE P2 | BRIJINDER SINGH | CC/843/2017 | SCDRC-UT-CHD |
| 24 | One RISE P2 | OM PRAKASH MALIK | CC/56/2017 | SCDRC-Punjab |
| 25 | One RISE P2 | NARINDER PRAKASH | CC/844/2017 | SCDRC-UT-CHD |
| 26 | One RISE P2 | SOURABH GHOSH | CC/313/2017 | SCDRC-UT-CHD |
| 27 | One RISE P2 | HARAVTAR SINGH | CC/311/2016 | SCDRC-Punjab |
| 28 | One RISE P2 | BALDEV SINGH | CC/860/2017 | SCDRC-UT-CHD |
| 29 | One RISE P2 | Lt. Col. INDERJIT KAUR | CC/364/2017 | SCDRC-UT-CHD |
| 30 | One RISE P2 | VISHAL KATARIYA | FA/1776/2016 | SCDRC-UT-CHD |
| 31 | One RISE P2 | MANINDER SINGH | CC/22/2018 | SCDRC-UT-CHD |
| 32 | One RISE P2 | RAJESH MADAN | CC/372/2017 | SCDRC-UT-CHD |
| 33 | One RISE P2 | PARVEEN MANGLA | FA/1008/2016 | NCDRC, New Delhi |
| 34 | One RISE P2 | OM PRAKASH | CC/56/2017 | SCDRC-Punjab |
| 35 | One RISE P2 | HARJOT SINGH GILL | CC/424/2017 | SCDRC-UT-CHD |
| 36 | One RISE P2 | VIKAS NIJHAVAN | FA/1011/2016 | NCDRC, New Delhi |
| 37 | One RISE P2 | DEEPAK PANDEY | CC/421/2017 | SCDRC-UT-CHD |
| 38 | One RISE P2 | MANPREET SINGH | FA/782/2017 | SCDRC-UT-CHD |
| 39 | One RISE P2 | P K SHARMA | CC/444/2017 | SCDRC-UT-CHD |
| 40 | One RISE P2 | VISHAL WADHAWA | CC/601/2017 | SCDRC-UT-CHD |
| 41 | One RISE P2 | RAMESH KUMAR AND ANR. | FA/1777/2016 | NCDRC, New Delhi |
| 42 | One RISE P2 | SUMIT CHADDA | CC/57/2017 | SCDRC-Punjab |
About the Project
| Project Name | ONE CITY HAMLET - F | ||
| Project Address |
Sector-105, Mohali, SAS Nagar
,
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 |
||
| Project Amenities | Access from Sector dividing road of sector 98 and 105. Underground water tank for water supply, sewage treatment plant, street lights etc shall be provided. | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Residential (Plotted Development) |
||
| Project Status | New Project | Project Cost (in rupees) | 85380000.00 (INR) |
| Project Start Date | 01-Oct-2022 | Proposed/ Expected Date of Project Completion as specified in Form B | 31-Oct-2029 |
| Litigation(s) related to Project | Nil | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
NA :- NA :- NA :- NA :- NA :- NA |
||
| Authorized Person for Communication with regards to Project |
Udit
Jain
8D, Hansalya, 15, Barakhambha Road , Central Delhi , Delhi - 110001 E-Mail: udit[at]onecity.in Mobile Phone: 9891500335 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | HDFC Bank Limited | Branch Name | Gole Market |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | HDFC0000584 |
| Account Holder Name | PRPL HAMLET F RERA AC | ||
| Bank Address |
6 BLOCK NO 90,104 BAIRD ROAD
,
GOLE MARKET
New Delhi , Delhi - 110001 |
||
Project Land Details
| 17629.2 (in sqr mtrs) | |||
| 17629.2 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 8601.56 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 9027.64 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 5//17/2 | 1492.283 (in sqr mtrs) | Dholl | Owned By Promoter |
| 2 | 5//18 | 227.64 (in sqr mtrs) | Dholl | Owned By Promoter |
| 3 | 5//22 | 303.52 (in sqr mtrs) | Dholl | Owned By Promoter |
| 4 | 5//23 | 3414.55 (in sqr mtrs) | Dholl | Owned By Promoter |
| 5 | 5//24/1 | 4223.92 (in sqr mtrs) | Dholl | Owned By Promoter |
| 6 | 5//25/2/1 | 227.64 (in sqr mtrs) | Dholl | Owned By Promoter |
| 7 | 6//5/1/2 | 2023.43 (in sqr mtrs) | Dholl | Owned By Promoter |
| 8 | 37//18 | 2529.3 (in sqr mtrs) | Bhagomajra | Owned By Promoter |
| 9 | 37//19 | 379.39 (in sqr mtrs) | Bhagomajra | Owned By Promoter |
| 10 | 37//23 | 657.62 (in sqr mtrs) | Bhagomajra | Owned By Promoter |
| 11 | 37//28 | 1214.06 (in sqr mtrs) | Bhagomajra | Owned By Promoter |
| 12 | 37//26 | 202.34 (in sqr mtrs) | Bhagomajra | Owned By Promoter |
| 13 | 5//25/1/1 | 733.49 (in sqr mtrs) | Dholl | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 2 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 3 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 3 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 2 | Electric Substation NOC | Approvals (Received) | 27-Feb-2023 |
Open official attachment ↗
|
| 3 | Environment Clearance certificate/ NOC | Approvals (Received) | 04-Nov-2024 |
Open official attachment ↗
|
| 4 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Applied) | 17-Mar-2026 |
Open official attachment ↗
|
| 5 | Pollution Clearance from Punjab Pollution Control Board | Permissions (Received) | 26-Feb-2024 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 2 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 3 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 4 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 5 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (ONE CITY HAMLET - F)
| 1 | Residential ( Plotted Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | POCKET F-RESIDENTIAL PLOTS |
Number of Floor/Plots Currently Sanctioned:
39
Number of Floor/Plots Proposed: 39 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Garages | 0 (in sqr Mtrs) | 0 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Drinking Water | Water Supply Network | 0.00 |
| 2 | Rain Water Harvesting | Rain Water Harvesting pits shall be made at the site | 0.00 |
| 3 | Street Lighting | Necessary street lighting shall be made at the project site | 0.00 |
| 4 | Park | Green Area as per layout shall be developed | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | Electricity Supply Transformer and Sub Station | External Development Work (PSPCL) | Electricity Supply up to the project by PSPCL and Internal LD system by promoter. | 0.00 |
| 2 | Sewerage and Drainage System | External Development Work (GMADA) | Main Truck Sewer up to the Project by GMADA and Internal Network by Promoter. | 0.00 |
| 3 | External Roads and Road System Landscaping | External Development Work (GMADA) | External Roads up to Project by GMADA and all internal roads within the project by promoter. | 0.00 |
| 4 | Water Supply System | External Development Work (GMADA) | Water Supply up to the project by GMADA , Internal Distribution Network by Promoter. | 0.00 |
| 5 | Solid Waste Management and Disposal | Self-Development | Necessary arrangements shall be made at the site by the promoter | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | SHARAD KUMAR |
Architect
|
Puma Realtors Pvt. Ltd. Year 2005 | One City Hamlet |
| Address for Official Communication |
GBK-02-001, ONE RISE
,
SECTOR 99
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140306 Email: architect[at]onecity.in Mobile/Landline Number: 8847333514 |
|||
| 2 | GURDEEP SINGH |
Contractor
|
2005 | NOT APPLICABLE |
| Address for Official Communication |
GBK-02-001, ONE RISE
,
SECTOR 99
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140306 Email: crm.mohali[at]onecity.in Mobile/Landline Number: 9891500335 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-III (July-September) | 2024 | QUP2024T20242721 | 15-Oct-2024 | Open official attachment ↗ |
| 2 | QTR-IV (October-December) | 2024 | QUP2024L20250407 | 15-Jan-2025 | Open official attachment ↗ |
| 3 | QTR-I (January-March) | 2025 | QUP2025F20251362 | 15-Apr-2025 | Open official attachment ↗ |
| 4 | QTR-II (April-June) | 2025 | QUP2025S20252237 | 14-Jul-2025 | Open official attachment ↗ |
| 5 | QTR-III (July-September) | 2025 | QUP2025T20253929 | 15-Oct-2025 | Open official attachment ↗ |
| 6 | QTR-I (January-March) | 2026 | QUP2026F20261540 | 14-Apr-2026 | Open official attachment ↗ |
| 7 | QTR-II (April-June) | 2026 | QUP2026S20263627 | 15-Jul-2026 | Open official attachment ↗ |
| 8 | QTR-IV (October-December) | 2025 | QUP2025L20263814 | 20-Jul-2026 | Open official attachment ↗ |
Open official attachment ↗