Promoter Details (Other Than Individual)
| COUNTRY COLONISERS PRIVATE LIMITED | Private Limited Company | ||
| Main Objects of Organization | REAL ESTATE DEVELOPERS | ||
| Registered Address of Organization |
WAVE ESTATE, SECTOR-85
,
DISTRICT SAS NAGAR (MOHALI)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 |
||
| Official Address |
WAVE ESTATE, SECTOR-85
,
DISTRICT SAS NAGAR (MOHALI)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 |
||
| 10 (in years) | 16 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | ADDITIONAL DIRECTOR | SANJEEV JAIN |
58,Krishan Kunj Extension, Gali No-2, Part-1 Laxmi Nagar, Shakar Pur Baramad
,
East Delhi
East Delhi , Delhi - 110092 Email: rerasanjivjain[at]gmail.com |
|
| 2 | ADDITIONAL DIRECTOR | RAJIV GUPTA |
G-68, Pocket G, Sarita Vihar, South Delhi,
,
Sec-1, Near Hanuman Mandir, Greater Noida West, Bishrakh Gautam Buddha Nagar,
New Delhi , Delhi - 110076 Email: rerarajivgupta[at]gmail.com |
|
| 3 | ADDITIONAL DIRECTOR | Manish Khanna |
B-116, Amrapali Leisure Valley
,
Sec-1, Near Hanuman Mandir, Greater Noida West, Bishrakh Gautam Buddha Nagar,
Gautam Buddha Nagar , Uttar Pradesh - 201306 Email: reramaishkhanna[at]gmail.com |
|
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | Wave Estate Block -E | Complete | 67703.3444 | 27-Nov-2011 | 30-Jun-2018 | 30-Jun-2018 |
| 2 | Wave Estate Block -A | Complete | 117398.3278 | 27-Apr-2014 | 31-Mar-2019 | 31-Mar-2019 |
| 3 | Wave Estate Block -B | On-going | 56979.2642 | 27-Nov-2014 | 30-Nov-2020 | 30-Nov-2020 |
| 4 | Wave Estate Block -C | Complete | 80167.5585 | 27-Nov-2014 | 31-Oct-2018 | 31-Oct-2018 |
| 5 | Wave Estate Block -D | Complete | 55239.1304 | 27-Nov-2014 | 30-Nov-2018 | 30-Nov-2018 |
| 6 | Wave Estate Block -F | Complete | 19869.8996 | 27-Nov-2014 | 31-May-2019 | 31-May-2019 |
| 7 | Wave Estate Block -G | Complete | 20517.3913 | 27-Nov-2014 | 31-Jan-2019 | 31-Jan-2019 |
| 8 | Wave Estate Commercial Pocket - B | On-going | 19465.2173 | 27-Nov-2014 | 31-Dec-2022 | 31-Dec-2022 |
| 9 | Wave Estate Commercial Pocket - D | On-going | 54025.0836 | 27-Nov-2014 | 31-Dec-2021 | 31-Dec-2021 |
| 10 | Wave Estate Commercial pocket- A | Complete | 13314.0468 | 27-Nov-2014 | 31-May-2019 | 31-May-2019 |
| 11 | Wave Estate Group Housing-2 Phase-1 | On-going | 48561.8729 | 27-Nov-2014 | 28-Feb-2021 | 28-Feb-2021 |
| 12 | Wave Estate Commercial pocket- C | Complete | 6272.5752 | 30-Nov-2014 | 31-Dec-2018 | 31-Dec-2018 |
| 13 | WAVE ESTATE BLOCK A2 | On-going | 25693.112 | 02-Sep-2021 | 01-Sep-2026 | 01-Sep-2026 |
| 14 | WAVE ESTATE BLOCK G2 | On-going | 2832.78 | 02-Sep-2021 | 01-Sep-2026 | 01-Sep-2026 |
| 15 | Wave Estate Block-H | On-going | 26218.36 | 31-Mar-2022 | 30-Mar-2027 | 30-Mar-2027 |
| 16 | Harmony Greens | On-going | 50342.89 | 23-Jan-2023 | 22-Jan-2028 | 22-Jan-2028 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | Wave Estate Block -G | WAVE FLOOR 99 | FA/161/2020 | National Consumer Disputes Redressal Commission (NCDRC) |
| 2 | Wave Estate Group Housing-2 Phase-1 | KULMEET KAUR VS CCPL | GCNO/0267/2022 | RERA |
| 3 | Wave Estate Group Housing-2 Phase-1 | SATINDER SINGH KATARIA | GCNO/0270/2022 | RERA |
| 4 | Wave Estate Group Housing-2 Phase-1 | ADARSH BHATIA | CC/137/2019 | National Consumer Disputes Redressal Commission (NCDRC) |
| 5 | Wave Estate Group Housing-2 Phase-1 | RUPINDER KAUR NARANG VS CCPL | APPEAL NO.3/2023 | RERA APPEAL |
| 6 | Wave Estate Group Housing-2 Phase-1 | Kulwinder Singh Pabla VS. CCPL | GC/1238/2019 EA/20/2024 MA/4/2024 | RERA |
About the Project
| Project Name | Wave Estate, Group Housing-2 (Phase-2) | ||
| Project Address |
WAVE ESTATE
,
sector-85
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 143308 |
||
| Project Amenities | Underground Storm drainage and Sewerage network system, Rain Water harvesting, Street Lighting, Centralized Sewage Treatment Plant,24x 7 supply of water through centralized Water tank along with Overhead tank, Electrical supply through underground cabling system, Dual water supply network main or treated | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Residential (Building/Tower Development) |
||
| Project Status | On-going | Project Cost (in rupees) | 4159600000.00 (INR) |
| Project Start Date | 01-Apr-2024 | Proposed/ Expected Date of Project Completion as specified in Form B | 31-Mar-2029 |
| Litigation(s) related to Project | Nil | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
RCC as per NBC :- As per specification :- As per specification :- As per specification :- As per specification :- As per specification |
||
| Authorized Person for Communication with regards to Project |
Manish
Khanna
B-116, Amrapali Leisure Valley , Sec-1, Near Hanuman Mandir, Greater Noida West, Bishrakh Gautam Buddha Nagar, Gautam Buddha Nagar , Uttar Pradesh - 201306 E-Mail: reramaishkhanna[at]gmail.com Mobile Phone: 9711000764 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | Punjab and Sind Bank | Branch Name | Connaught circus, New Delhi |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | PSIB0000717 |
| Account Holder Name | Country Colonisers Private Limited | ||
| Bank Address |
P18/90, Madras Hotel Building,
,
Connaught circus, New Delhi
New Delhi , Delhi - 110001 |
||
Project Land Details
| 48562.368 (in sqr mtrs) | |||
| 48309.439 (in sqr mtrs) | 252.929 (in sqr mtrs) | ||
| 10329.41 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 38232.958 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 6// 15 | 252.929 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 2 | 7// 11/1 | 1593.4527 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 3 | 7// 11/2 | 607.0296 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 4 | 7// 11/3 | 1011.716 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 5 | 7// 12/1 | 177.0503 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 6 | 7// 12/2 | 2251.0681 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 7 | 7// 12/3 | 1037.0089 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 8 | 7// 13 | 3035.148 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 9 | 7// 14/1 | 1163.4734 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 10 | 7// 14/2 | 809.3728 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 11 | 7// 15 | 278.2219 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 12 | 7// 16 | 1871.6746 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 13 | 7// 17 | 3718.0563 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 14 | 7// 18/1 | 1568.1598 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 15 | 7// 18/2 | 2124.6036 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 16 | 7// 19 | 3743.3492 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 17 | 7// 20 | 1972.8462 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 18 | 7// 21 | 50.5858 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 19 | 7// 22 | 3009.8551 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 20 | 7// 23 | 4046.864 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 21 | 7// 24 | 2529.29 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 22 | 7// 25 | 101.1716 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 23 | 10// 2 | 607.0296 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 24 | 10// 3/1 | 227.6361 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 25 | 10// 3/2 | 1568.1598 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 26 | 15// 14 | 429.9793 (in sqr mtrs) | Sambalki | Owned By Promoter |
| 27 | 15// 15 | 1947.5533 (in sqr mtrs) | Sambalki | Owned By Promoter |
| 28 | 15// 17 | 809.3728 (in sqr mtrs) | Sambalki | Owned By Promoter |
| 29 | 1// 16/1 | 2453.4113 (in sqr mtrs) | Sukhgarh | Owned By Promoter |
| 30 | 1// 16/2 | 252.929 (in sqr mtrs) | Sukhgarh | Not Owned By Promoter |
| 31 | 2// 20 | 2175.1894 (in sqr mtrs) | Sukhgarh | Owned By Promoter |
| 32 | // 15 | 1138.1805 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 3 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 4 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 5 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 6 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 7 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 8 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 9 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 10 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Architects Certificate (Form 1) | -- | -- |
Open official attachment ↗
|
| 2 | Architects Certificate (Form 1) | -- | -- |
Open official attachment ↗
|
| 3 | Architects Certificate (Form 1) | -- | -- |
Open official attachment ↗
|
| 4 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 5 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 6 | Engineers Certificate (Form 2) | -- | -- |
Open official attachment ↗
|
| 7 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Approvals (Revised) | 03-Dec-2018 |
Open official attachment ↗
|
| 2 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 3 | Completion/ Phase Completion certificate from Municipal/ Competent Authority | Approvals (Received) | 19-Mar-2020 |
Open official attachment ↗
|
| 4 | Completion/ Phase Completion certificate from Municipal/ Competent Authority | Approvals (Received) | 16-Oct-2019 |
Open official attachment ↗
|
| 5 | Electric Substation NOC | Approvals (Received) | 06-Mar-2023 |
Open official attachment ↗
|
| 6 | Environment Clearance certificate/ NOC | Approvals (Revised) | 09-Jul-2018 |
Open official attachment ↗
|
| 7 | NOC from Fire Department/ Chief Fire Officer | Permissions (Received) | 26-Dec-2023 |
Open official attachment ↗
|
| 8 | NOC from Fire Department/ Chief Fire Officer | Approvals (Received) | 14-Mar-2024 |
Open official attachment ↗
|
| 9 | NOC from Fire Department/ Chief Fire Officer | Permissions (Received) | 15-May-2015 |
Open official attachment ↗
|
| 10 | Occupancy Certificate from Municipal/ Competent Authority | Approvals (Received) | 16-Oct-2019 |
Open official attachment ↗
|
| 11 | Occupancy Certificate from Municipal/ Competent Authority | Approvals (Received) | 19-Mar-2020 |
Open official attachment ↗
|
| 12 | Other Document ( NOC forest) | Approvals (Received) | 23-Jul-2019 |
Open official attachment ↗
|
| 13 | Other Document (PSPCL NOC ) | Approvals (Received) | 20-Oct-2023 |
Open official attachment ↗
|
| 14 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 13-May-2024 |
Open official attachment ↗
|
| 15 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Revised) | 02-Jul-2022 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 2 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 3 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 4 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 5 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 6 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 7 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 8 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (Wave Estate, Group Housing-2 (Phase-2))
| 1 | Residential ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | |||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | TOWER-I |
Number of Floor/Plots Currently Sanctioned:
19
Number of Floor/Plots Proposed: 19 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
| 2 | TOWER-J |
Number of Floor/Plots Currently Sanctioned:
20
Number of Floor/Plots Proposed: 20 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
| 3 | TOWER-K |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
| 4 | TOWER-L |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Basement | 17856 (in sqr Mtrs) | 558 | 0 |
| 2 | Open | 2944 (in sqr Mtrs) | 128 | 0 |
| 3 | Covered | 8056 (in sqr Mtrs) | 212 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | Internal Infrastructure Facilities | 0.00 |
| 2 | Emergency Evacuation | Internal Infrastructure Facilities | 0.00 |
| 3 | Park | Internal Infrastructure Facilities | 0.00 |
| 4 | Fire Fighting | Internal Infrastructure Facilities | 0.00 |
| 5 | Street Lighting | Internal Infrastructure Facilities | 0.00 |
| 6 | Use for Renewable Energy | Internal Infrastructure Facilities | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | External Development Work | OUTER ROADS | 40.00 |
| 2 | Water Supply System | Self-Development | CONSTRUCTION NOT STARTED YET | 0.00 |
| 3 | Sewerage and Drainage System | Self-Development | CONSTRUCTION NOT STARTED YET | 0.00 |
| 4 | Electricity Supply Transformer and Sub Station | Self-Development | CONSTRUCTION NOT STARTED YET | 0.00 |
| 5 | Solid Waste Management and Disposal | Self-Development | CONSTRUCTION NOT STARTED YET | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | NIRAJ KUMAR NANDA |
Architect
CA 2009 46122 |
JUNE 2017 | WAVE ESTATE AND WAVE GHAZIABAD |
| Address for Official Communication |
(KM-06)305) Sector-134, NOIDA 201304
,
up
Agra , Uttar Pradesh - 201304 Email: nanda.niraj[at]gmail.com Mobile/Landline Number: 9899612225 |
|||
| 2 | ADITYA SHARMA |
Structural Engineer
GHAZIABAD |
SEPTEMBER 2015 | WAVE ESTATE |
| Address for Official Communication |
E-24, Basement, Lajpat Nagar-1, New Delhi-24 New Delhi
,
Central Delhi , Delhi - 110024 Email: aditya.ex.dir[at]gmail.com Mobile/Landline Number: 9717245166 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-III (July-September) | 2024 | QUP2024T20252051 | 11-Jul-2025 | Open official attachment ↗ |
| 2 | QTR-IV (October-December) | 2024 | QUP2024L20252052 | 11-Jul-2025 | Open official attachment ↗ |
| 3 | QTR-I (January-March) | 2025 | QUP2025F20252054 | 11-Jul-2025 | Open official attachment ↗ |
| 4 | QTR-II (April-June) | 2025 | QUP2025S20252057 | 11-Jul-2025 | Open official attachment ↗ |
| 5 | QTR-III (July-September) | 2025 | QUP2025T20261825 | 17-Apr-2026 | Open official attachment ↗ |
| 6 | QTR-IV (October-December) | 2025 | QUP2025L20261826 | 17-Apr-2026 | Open official attachment ↗ |
| 7 | QTR-I (January-March) | 2026 | QUP2026F20261827 | 17-Apr-2026 | Open official attachment ↗ |
| 8 | QTR-II (April-June) | 2026 | QUP2026S20264830 | 01-Sep-2026 | Open official attachment ↗ |
Open official attachment ↗