Promoter Details (Other Than Individual)
| PUMA REALTORS PRIVATE LIMITED | Private Limited Company | ||
| Main Objects of Organization | Real Estate Promoter & Developer | ||
| Registered Address of Organization |
8-D, Hansalaya-15
,
Barakhamba Road
New Delhi , Delhi - 110001 |
||
| Official Address |
8-D, Hansalaya-15
,
Barakhamba Road
New Delhi , Delhi - 110001 |
||
| 1 (in years) | 16 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | DIRECTOR | APOORV JAIN |
C-479,
,
Defence Colony
South Delhi , Delhi - 110024 Email: apoorv[at]onecity.in |
|
| 2 | DIRECTOR | SUNIL KUMAR JAIN |
C-479,
,
Defence Colony
South Delhi , Delhi - 110024 Email: sjain[at]onecity.in |
|
| 3 | Authorised Signatory | Udit Jain |
C-479,
,
Defence Colony
South Delhi , Delhi - 110024 Email: udit[at]onecity.in |
|
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | One City Hamlet | On-going | 5139.5 | 11-Apr-2008 | 30-Sep-2019 | 30-Sep-2019 |
| 2 | One City Hamlet 1 | Complete | 106392 | 11-Apr-2008 | 30-Jun-2017 | 30-Jun-2017 |
| 3 | One RISE P2 | Complete | 14123.53 | 18-Jan-2012 | 01-Mar-2018 | 01-Mar-2018 |
| 4 | One City Hamlet -2 | On-going | 29501.58 | 15-May-2013 | 31-Dec-2022 | 31-Dec-2022 |
| 5 | One Rise P-1 | Complete | 16915.86 | 24-Jun-2014 | 31-Dec-2023 | 31-Dec-2023 |
| 6 | One City Hamlet C-1 | On-going | 12231.14 | 27-Mar-2017 | 31-Dec-2021 | 31-Dec-2021 |
| 7 | One City Hub | On-going | 18271.42 | 30-Jun-2017 | 31-Dec-2020 | 31-Dec-2020 |
| 8 | One City Hamlet D-105 | On-going | 13233.22 | 27-Mar-2018 | 31-Dec-2021 | 31-Dec-2021 |
| 9 | One City Hamlet-4 | On-going | 60864.721 | 27-Mar-2018 | 31-Dec-2022 | 31-Dec-2022 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | One RISE P2 | AJAY GANDOTRA | CC/564/2017 | SCDRC-UT-CHD |
| 2 | One RISE P2 | HARDISH KUMAR SHARMA AND ANR. | CC/961/2016 | SCDRC-UT-CHD |
| 3 | One RISE P2 | VIKAS MALIK | CC/58/2017 | SCDRC-Punjab |
| 4 | One RISE P2 | BALDEV SINGH | CC/553/2017 | SCDRC-UT-CHD |
| 5 | One RISE P2 | SACHIN MAHAJAN | CC/565/2017 | SCDRC-UT-CHD |
| 6 | One RISE P2 | PARVESH KUMAR | CC/962/2016 | SCDRC-UT-CHD |
| 7 | One RISE P2 | CHETAN MAHAJAN | CC/59/2017 | SCDRC-Punjab |
| 8 | One RISE P2 | ANIL TARACHAND | CC/622/2017 | SCDRC-UT-CHD |
| 9 | One RISE P2 | VIKAS MALIK | CC/691/2017 | SCDRC-UT-CHD |
| 10 | One RISE P2 | RAKESH KUMAR GUPTA | CC/540/2017 | SCDRC-UT-CHD |
| 11 | One RISE P2 | ARUSHI PARMAR | CC/199/2017 | SCDRC-UT-CHD |
| 12 | One RISE P2 | GOLDY CHADHA | CC/711/2017 | SCDRC-UT-CHD |
| 13 | One RISE P2 | RAJIV GUPTA AND ANR | CC/397/2017 | SCDRC-UT-CHD |
| 14 | One RISE P2 | SUKHJEET SINGH | CC/202/2017 | SCDRC-UT-CHD |
| 15 | One RISE P2 | AJAY KUMAR SONI | CC/108/2018 | SCDRC-UT-CHD |
| 16 | One RISE P2 | Mrs. PRADEEP BRAR | CC/516/2017 | SCDRC-UT-CHD |
| 17 | One RISE P2 | JASMEET KAUR | CC/243/2017 | SCDRC-UT-CHD |
| 18 | One RISE P2 | RAMESH CHANDER SHARMA | CC/762/2017 | SCDRC-UT-CHD |
| 19 | One RISE P2 | SUMEET CHADHA | CC/57/2017 | SCDRC-Punjab |
| 20 | One RISE P2 | CHETAN MAHAJAN | CC/59/2017 | SCDRC-Punjab |
| 21 | One RISE P2 | GAUTAM CHAWLA | CC/810/2017 | SCDRC-UT-CHD |
| 22 | One RISE P2 | SATBIR SINGH | CC/833/2017 | SCDRC-UT-CHD |
| 23 | One RISE P2 | BRIJINDER SINGH | CC/843/2017 | SCDRC-UT-CHD |
| 24 | One RISE P2 | OM PRAKASH MALIK | CC/56/2017 | SCDRC-Punjab |
| 25 | One RISE P2 | NARINDER PRAKASH | CC/844/2017 | SCDRC-UT-CHD |
| 26 | One RISE P2 | SOURABH GHOSH | CC/313/2017 | SCDRC-UT-CHD |
| 27 | One RISE P2 | HARAVTAR SINGH | CC/311/2016 | SCDRC-Punjab |
| 28 | One RISE P2 | BALDEV SINGH | CC/860/2017 | SCDRC-UT-CHD |
| 29 | One RISE P2 | Lt. Col. INDERJIT KAUR | CC/364/2017 | SCDRC-UT-CHD |
| 30 | One RISE P2 | VISHAL KATARIYA | FA/1776/2016 | SCDRC-UT-CHD |
| 31 | One RISE P2 | MANINDER SINGH | CC/22/2018 | SCDRC-UT-CHD |
| 32 | One RISE P2 | RAJESH MADAN | CC/372/2017 | SCDRC-UT-CHD |
| 33 | One RISE P2 | PARVEEN MANGLA | FA/1008/2016 | NCDRC, New Delhi |
| 34 | One RISE P2 | OM PRAKASH | CC/56/2017 | SCDRC-Punjab |
| 35 | One RISE P2 | HARJOT SINGH GILL | CC/424/2017 | SCDRC-UT-CHD |
| 36 | One RISE P2 | VIKAS NIJHAVAN | FA/1011/2016 | NCDRC, New Delhi |
| 37 | One RISE P2 | DEEPAK PANDEY | CC/421/2017 | SCDRC-UT-CHD |
| 38 | One RISE P2 | MANPREET SINGH | FA/782/2017 | SCDRC-UT-CHD |
| 39 | One RISE P2 | P K SHARMA | CC/444/2017 | SCDRC-UT-CHD |
| 40 | One RISE P2 | VISHAL WADHAWA | CC/601/2017 | SCDRC-UT-CHD |
| 41 | One RISE P2 | RAMESH KUMAR AND ANR. | FA/1777/2016 | NCDRC, New Delhi |
| 42 | One RISE P2 | SUMIT CHADDA | CC/57/2017 | SCDRC-Punjab |
About the Project
| Project Name | One City Hamlet C-1 (Formerly known as Block C-1 part of Intergraded Township) | ||
| Project Address |
Village Dholl
,
Sector 98
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 |
||
| Project Amenities | A Residential Plotted Development . Amenities include Internal Roads , Water Supply Network ,Sewage Network ,Storm Water Drainage System , Street Lighting and Electrical Distribution System. | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Residential (Plotted Development) |
||
| Project Status | On-going | Project Cost (in rupees) | -- |
| Project Start Date | 27-Mar-2017 | Proposed/ Expected Date of Project Completion as specified in Form B | 31-Dec-2021 |
| Project Web Link | www.onecity.in | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
N/A :- N/A :- N/A :- N/A :- N/A :- N/A |
||
| Authorized Person for Communication with regards to Project |
Mudit
Jain
Ireo Project Office , Sector 99, Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 E-Mail: mudit.jain[at]ireo.in Mobile Phone: 9810237279 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | Kotak Mahindra Bank Limited | Branch Name | kotak Mahindra Bank |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | KKBK0000173 |
| Account Holder Name | |||
| Bank Address |
M43-A, Greater Kailash II,
,
New Delhi
Central Delhi , Delhi - 110048 |
||
Project Land Details
| 12231.14 (in sqr mtrs) | |||
| 12231.14 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 11763.14 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 468 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 8/2 | 1052.175 (in sqr mtrs) | Dholl | Owned By Promoter |
| 2 | 3//22 min | 4006.4 (in sqr mtrs) | Dholl | Owned By Promoter |
| 3 | 23/1 min | 1537.8 (in sqr mtrs) | Dholl | Owned By Promoter |
| 4 | 8//2/1 | 2468.6 (in sqr mtrs) | Dholl | Owned By Promoter |
| 5 | 3/1 | 2347.2 (in sqr mtrs) | Dholl | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 3 | Approved Sanctioned Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Architects Certificate (Form 1) | -- | -- |
Open official attachment ↗
|
| 2 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 3 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 4 | Engineers Certificate (Form 2) | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Clearances (Received) | 06-Apr-2011 |
Open official attachment ↗
|
| 2 | Amendments or revisions in sanctioned Layout/ Sanction / Building Plan | Revisions (Received) | 27-Mar-2018 |
Open official attachment ↗
|
| 3 | Application for renewal of any of the NOCs/ Licenses | Approvals (Received) | 25-Sep-2017 |
Open official attachment ↗
|
| 4 | Borewell Registration certificate from Central Ground Water Authority | Permissions (Received) | 19-Aug-2011 |
Open official attachment ↗
|
| 5 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 6 | Completion/ Phase Completion certificate from Municipal/ Competent Authority | Approvals (Received) | 01-Mar-2018 |
Open official attachment ↗
|
| 7 | Electric Substation NOC | Permissions (Received) | 08-Jul-2015 |
Open official attachment ↗
|
| 8 | Environment Clearance certificate/ NOC | Clearances (Received) | 30-Nov-2012 |
Open official attachment ↗
|
| 9 | Pollution Clearance from Punjab Pollution Control Board | Permissions (Received) | 20-Apr-2018 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 2 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 3 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 4 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 5 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 6 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 7 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (One City Hamlet C-1 (Formerly known as Block C-1 part of Intergraded Township))
| 1 | Residential ( Plotted Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | BLOCK C1 |
Number of Floor/Plots Currently Sanctioned:
28
Number of Floor/Plots Proposed: 28 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Garages | 0 (in sqr Mtrs) | 0 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | Fire Hydrants | 0.00 |
| 2 | Drinking Water | Water Supply Network | 0.00 |
| 3 | Emergency Evacuation | Not Applicable | 0.00 |
| 4 | Use for Renewable Energy | Not Applicable | 0.00 |
| 5 | Rain Water Harvesting | RWH pits to be provided | 0.00 |
| 6 | Street Lighting | Pole Light to be provided | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | External Development Work | External Roads up to Project by GMADA and all internal roads within the project by promoter. | 0.00 |
| 2 | Water Supply System | External Development Work | Water Supply up to the project by GMADA , Internal Distribution Network by Promoter. | 0.00 |
| 3 | Sewerage and Drainage System | External Development Work | Main Truck Sewer up to the Project by GMADA and Internal Network by Promoter. | 0.00 |
| 4 | Electricity Supply Transformer and Sub Station | External Development Work | Electricity Supply up to the project by PSPCL and Internal LD system by promoter. | 0.00 |
| 5 | Solid Waste Management and Disposal | Self-Development | By Promoter | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | IN HOUSE |
Architect
|
2007 | IREO Hamlet |
| Address for Official Communication |
IREO Project Office
,
Sector 99
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 Email: rera.mohali[at]ireo.in Mobile/Landline Number: 9810237279 |
|||
| 2 | YET TO BE AWARDED |
Contractor
|
Not available | Not available |
| Address for Official Communication |
IREO Project Office
,
Sector 99
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 Email: rera.mohali[at]ireo.in Mobile/Landline Number: 9810237279 |
|||
| 3 | IN HOUSE |
Structural Engineer
|
2007 | IREO Hamlet |
| Address for Official Communication |
IREO Project Office
,
Sector 99
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 Email: rera.mohali[at]ireo.in Mobile/Landline Number: 9810237279 |
|||
| 4 | GAURAV NEGI |
Real Estate Agent
|
Brickacres Intermediary Services Pvt Ltd. 2015 | IREO Hamlet |
| Address for Official Communication |
Sector 22
,
Chandigarh
Chandigarh , Chandigarh - 160022 Email: brickacres[at]brickacres.in Mobile/Landline Number: 8054369154 |
|||
| 5 | ANUJ DUA |
Real Estate Agent
|
DNA Realtors, 2011 | IREO Hamlet |
| Address for Official Communication |
SCO 21, MS Enclave
,
Dhakoli
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 Email: dnarealtors[at]hotmail.com Mobile/Landline Number: 9814334259 |
|||
| 6 | ONKAR SINGH |
Real Estate Agent
|
Imperial Properties, 2002 | IREO Hamlet |
| Address for Official Communication |
828, Industrial Area B, Near Campa Cola Crossing
,
Opp Water Tank
Ludhiana , Punjab - 141003 Email: imperialproperties18[at]gmail.com Mobile/Landline Number: 9876180881 |
|||
| 7 | OM THAKUR |
Real Estate Agent
|
OMG Realtors, 2012 | IREO Hamlet |
| Address for Official Communication |
Sector 35
,
Chandigarh
Chandigarh , Chandigarh - 160035 Email: omgrealtors[at]gmail.com Mobile/Landline Number: 7009792227 |
|||
| 8 | PARAMVEER SINGH TIWANA |
Real Estate Agent
|
Realty Matters, 2010 | IREO Hamlet |
| Address for Official Communication |
SCO 9, Level 1,
,
Madhya Marg, Sector 26
Chandigarh , Chandigarh - 160019 Email: pramveer[at]realtymatters.in Mobile/Landline Number: 9814113062 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-I (January-March) | 2019 | QUP2019F20201027 | 20-Aug-2020 | Open official attachment ↗ |
| 2 | QTR-II (April-June) | 2019 | QUP2019S20201030 | 20-Aug-2020 | Open official attachment ↗ |
| 3 | QTR-III (July-September) | 2019 | QUP2019T20201032 | 20-Aug-2020 | Open official attachment ↗ |
| 4 | QTR-IV (October-December) | 2019 | QUP2019L20201033 | 20-Aug-2020 | Open official attachment ↗ |
| 5 | QTR-I (January-March) | 2020 | QUP2020F20201034 | 20-Aug-2020 | Open official attachment ↗ |
| 6 | QTR-I (January-March) | 2018 | QUP2018F20212328 | 22-Nov-2021 | Open official attachment ↗ |
| 7 | QTR-II (April-June) | 2018 | QUP2018S20212330 | 23-Nov-2021 | Open official attachment ↗ |
| 8 | QTR-III (July-September) | 2018 | QUP2018T20212331 | 23-Nov-2021 | Open official attachment ↗ |
| 9 | QTR-IV (October-December) | 2018 | QUP2018L20212332 | 23-Nov-2021 | Open official attachment ↗ |
| 10 | QTR-II (April-June) | 2020 | QUP2020S20212333 | 23-Nov-2021 | Open official attachment ↗ |
| 11 | QTR-III (July-September) | 2020 | QUP2020T20212334 | 23-Nov-2021 | Open official attachment ↗ |
| 12 | QTR-IV (October-December) | 2020 | QUP2020L20212335 | 23-Nov-2021 | Open official attachment ↗ |
| 13 | QTR-I (January-March) | 2021 | QUP2021F20212336 | 23-Nov-2021 | Open official attachment ↗ |
| 14 | QTR-II (April-June) | 2021 | QUP2021S20212337 | 23-Nov-2021 | Open official attachment ↗ |
| 15 | QTR-III (July-September) | 2021 | QUP2021T20212338 | 23-Nov-2021 | Open official attachment ↗ |
| 16 | QTR-IV (October-December) | 2021 | QUP2021L20220204 | 25-Jan-2022 | Open official attachment ↗ |
| 17 | QTR-I (January-March) | 2022 | QUP2022F20220817 | 13-Apr-2022 | Open official attachment ↗ |
| 18 | QTR-II (April-June) | 2022 | QUP2022S20221520 | 15-Jul-2022 | Open official attachment ↗ |
| 19 | QTR-III (July-September) | 2022 | QUP2022T20222126 | 15-Oct-2022 | Open official attachment ↗ |
| 20 | QTR-IV (October-December) | 2022 | QUP2022L20230164 | 12-Jan-2023 | Open official attachment ↗ |
| 21 | QTR-I (January-March) | 2023 | QUP2023F20231463 | 15-Apr-2023 | Open official attachment ↗ |
| 22 | QTR-II (April-June) | 2023 | QUP2023S20232904 | 15-Jul-2023 | Open official attachment ↗ |
| 23 | QTR-III (July-September) | 2023 | QUP2023T20234121 | 14-Oct-2023 | Open official attachment ↗ |
| 24 | QTR-IV (October-December) | 2023 | QUP2023L20240169 | 15-Jan-2024 | Open official attachment ↗ |
| 25 | QTR-I (January-March) | 2024 | QUP2024F20240993 | 14-Apr-2024 | Open official attachment ↗ |
| 26 | QTR-II (April-June) | 2024 | QUP2024S20241925 | 15-Jul-2024 | Open official attachment ↗ |
| 27 | QTR-III (July-September) | 2024 | QUP2024T20242606 | 14-Oct-2024 | Open official attachment ↗ |
| 28 | QTR-IV (October-December) | 2024 | QUP2024L20250380 | 15-Jan-2025 | Open official attachment ↗ |
| 29 | QTR-I (January-March) | 2025 | QUP2025F20251363 | 15-Apr-2025 | Open official attachment ↗ |
| 30 | QTR-II (April-June) | 2025 | QUP2025S20252214 | 14-Jul-2025 | Open official attachment ↗ |
| 31 | QTR-III (July-September) | 2025 | QUP2025T20253906 | 15-Oct-2025 | Open official attachment ↗ |
| 32 | QTR-IV (October-December) | 2025 | QUP2025L20260243 | 11-Jan-2026 | Open official attachment ↗ |
| 33 | QTR-I (January-March) | 2026 | QUP2026F20261536 | 14-Apr-2026 | Open official attachment ↗ |
| 34 | QTR-II (April-June) | 2026 | QUP2026S20263628 | 15-Jul-2026 | Open official attachment ↗ |
Open official attachment ↗