Promoter Details (Other Than Individual)
| COUNTRY COLONISERS PRIVATE LIMITED | Private Limited Company | ||
| Main Objects of Organization | REAL ESTATE DEVELOPERS | ||
| Registered Address of Organization |
WAVE ESTATE, SECTOR-85
,
DISTRICT SAS NAGAR (MOHALI)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 |
||
| Official Address |
WAVE ESTATE, SECTOR-85
,
DISTRICT SAS NAGAR (MOHALI)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308 |
||
| 10 (in years) | 16 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | ADDITIONAL DIRECTOR | SANJEEV JAIN |
58,Krishan Kunj Extension, Gali No-2, Part-1 Laxmi Nagar, Shakar Pur Baramad
,
East Delhi
East Delhi , Delhi - 110092 Email: rerasanjivjain[at]gmail.com |
|
| 2 | ADDITIONAL DIRECTOR | RAJIV GUPTA |
G-68, Pocket G, Sarita Vihar, South Delhi,
,
Sec-1, Near Hanuman Mandir, Greater Noida West, Bishrakh Gautam Buddha Nagar,
New Delhi , Delhi - 110076 Email: rerarajivgupta[at]gmail.com |
|
| 3 | ADDITIONAL DIRECTOR | Manish Khanna |
B-116, Amrapali Leisure Valley
,
Sec-1, Near Hanuman Mandir, Greater Noida West, Bishrakh Gautam Buddha Nagar,
Gautam Buddha Nagar , Uttar Pradesh - 201306 Email: reramaishkhanna[at]gmail.com |
|
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | Wave Estate Block -E | Complete | 67703.3444 | 27-Nov-2011 | 30-Jun-2018 | 30-Jun-2018 |
| 2 | Wave Estate Block -A | Complete | 117398.3278 | 27-Apr-2014 | 31-Mar-2019 | 31-Mar-2019 |
| 3 | Wave Estate Block -B | On-going | 56979.2642 | 27-Nov-2014 | 30-Nov-2020 | 30-Nov-2020 |
| 4 | Wave Estate Block -C | Complete | 80167.5585 | 27-Nov-2014 | 31-Oct-2018 | 31-Oct-2018 |
| 5 | Wave Estate Block -D | Complete | 55239.1304 | 27-Nov-2014 | 30-Nov-2018 | 30-Nov-2018 |
| 6 | Wave Estate Block -F | Complete | 19869.8996 | 27-Nov-2014 | 31-May-2019 | 31-May-2019 |
| 7 | Wave Estate Block -G | Complete | 20517.3913 | 27-Nov-2014 | 31-Jan-2019 | 31-Jan-2019 |
| 8 | Wave Estate Commercial Pocket - B | On-going | 19465.2173 | 27-Nov-2014 | 31-Dec-2022 | 31-Dec-2022 |
| 9 | Wave Estate Commercial Pocket - D | On-going | 54025.0836 | 27-Nov-2014 | 31-Dec-2021 | 31-Dec-2021 |
| 10 | Wave Estate Commercial pocket- A | Complete | 13314.0468 | 27-Nov-2014 | 31-May-2019 | 31-May-2019 |
| 11 | Wave Estate Group Housing-2 Phase-1 | On-going | 48561.8729 | 27-Nov-2014 | 28-Feb-2021 | 28-Feb-2021 |
| 12 | Wave Estate Commercial pocket- C | Complete | 6272.5752 | 30-Nov-2014 | 31-Dec-2018 | 31-Dec-2018 |
| 13 | WAVE ESTATE BLOCK A2 | On-going | 25693.112 | 02-Sep-2021 | 01-Sep-2026 | 01-Sep-2026 |
| 14 | WAVE ESTATE BLOCK G2 | On-going | 2832.78 | 02-Sep-2021 | 01-Sep-2026 | 01-Sep-2026 |
| 15 | Wave Estate Block-H | On-going | 26218.36 | 31-Mar-2022 | 30-Mar-2027 | 30-Mar-2027 |
| 16 | Harmony Greens | On-going | 50342.89 | 23-Jan-2023 | 22-Jan-2028 | 22-Jan-2028 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | Wave Estate Block -G | WAVE FLOOR 99 | FA/161/2020 | National Consumer Disputes Redressal Commission (NCDRC) |
| 2 | Wave Estate Group Housing-2 Phase-1 | KULMEET KAUR VS CCPL | GCNO/0267/2022 | RERA |
| 3 | Wave Estate Group Housing-2 Phase-1 | SATINDER SINGH KATARIA | GCNO/0270/2022 | RERA |
| 4 | Wave Estate Group Housing-2 Phase-1 | ADARSH BHATIA | CC/137/2019 | National Consumer Disputes Redressal Commission (NCDRC) |
| 5 | Wave Estate Group Housing-2 Phase-1 | RUPINDER KAUR NARANG VS CCPL | APPEAL NO.3/2023 | RERA APPEAL |
| 6 | Wave Estate Group Housing-2 Phase-1 | Kulwinder Singh Pabla VS. CCPL | GC/1238/2019 EA/20/2024 MA/4/2024 | RERA |
About the Project
| Project Name | Wave Estate, Group Housing-2 (Phase-1) | ||
| Project Address |
WAVE ESTATE
,
SECTOR -85 & 99
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 143308 |
||
| Project Amenities | Underground Storm drainage and Sewerage network system, Rain Water harvesting, Street Lighting, Centralized Sewage Treatment Plant,24x 7 supply of water through centralized Water tank along with Overhead tank, Electrical supply through underground cabling system, Dual water supply network main or treated | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Residential (Building/Tower Development) |
||
| Project Status | On-going | Project Cost (in rupees) | 3309700000.00 (INR) |
| Project Start Date | 18-Mar-2018 | Proposed/ Expected Date of Project Completion as specified in Form B | 28-Feb-2021 |
| Litigation(s) related to Project | Yes | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
Plotted Development with Infrastructure :- Plotted Development with Infrastructure :- Plotted Development with Infrastructure :- Plotted Development with Infrastructure :- Plotted Development with Infrastructure :- Plotted Development with Infrastructure |
||
| Authorized Person for Communication with regards to Project |
Harmandeep
Singh
Kandhari
C-193 , Sector – 44 , Gautam Buddha Nagar , Uttar Pradesh - 201301 E-Mail: RERA[at]WAVEESTATE.IN Mobile Phone: 9711091567 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | Axis Bank Limited | Branch Name | ATTA NOIDA |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | UTIB0000361 |
| Account Holder Name | WAVE ESTATE GROUP HOUSING 2 PHASE 1 | ||
| Bank Address |
SEC ,18 NOIDA
,
Gautam Buddha Nagar , Uttar Pradesh - 201301 |
||
Litigation(s) Related to Project (If Any) Details
| Sr No | Case Title | Case Number | Name of Authority/Forum where Case Pending/Resolved |
|---|---|---|---|
| 1 | Sandeep Goyal | EA-49-2018 | Permanent Lok Adalat Mohali |
| 2 | Harmanpreet Singh | 10212018 | RERA |
| 3 | Sandeep Goyal | EA-49-2018 | Permanent Lok Adalat Mohali |
| 4 | SHIBIN NALAVADATH | 60/2018/LOK | Permanent Lok Adalat Mohali |
| 5 | Anil Kumar Gupta | CC/39/2017 | National Consumer Disputes Redressal Commission |
| 6 | BHAVNEET MAVI | CC/524/2018 | State Consumer Disputes Commission Punjab |
| 7 | HARVINDER SINGH MAVI | CC/523/2018 | State Consumer Disputes Commission Punjab |
| 8 | Harbans Kaur Singh | CC-580-2018 | State Consumer Disputes Commission Punjab |
| 9 | Surinder Singh | CC-563-2018 | State Consumer Disputes Commission Punjab |
Project Land Details
| 48562 (in sqr mtrs) | |||
| 47170.805 (in sqr mtrs) | 1391.095 (in sqr mtrs) | ||
| 3946.06 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 44615.84 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 6//15 | 252.926 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 2 | 7//11/1 | 1593.436 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 3 | 7//11/2 | 607.023 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 4 | 7//11/3 | 1011.706 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 5 | 7//12/1 | 177.048 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 6 | 7//12/2 | 2251.045 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 7 | 7//12/3 | 1036.998 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 8 | 7//13 | 3035.117 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 9 | 7//14/1 | 1163.462 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
| 10 | 7//14/2 | 809.365 (in sqr mtrs) | Patti Sohana | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 3 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 4 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 3 | Engineers Certificate (Form 2) | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Approvals (Received) | 04-Sep-2013 |
Open official attachment ↗
|
| 2 | Amendments or revisions in sanctioned Layout/ Sanction / Building Plan | Approvals (Received) | 12-Apr-2018 |
Open official attachment ↗
|
| 3 | Application for renewal of any of the NOCs/ Licenses | Approvals (Received) | 29-Sep-2017 |
Open official attachment ↗
|
| 4 | Borewell Registration certificate from Central Ground Water Authority | Approvals (Received) | 19-Apr-2016 |
Open official attachment ↗
|
| 5 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 6 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 7 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 8 | Completion/ Phase Completion certificate from Municipal/ Competent Authority | Approvals (Received) | 12-Sep-2018 |
Open official attachment ↗
|
| 9 | Electric Substation NOC | Approvals (Received) | 02-Jan-2018 |
Open official attachment ↗
|
| 10 | NOC from Fire Department/ Chief Fire Officer | Approvals (Received) | 16-May-2016 |
Open official attachment ↗
|
| 11 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 11-Apr-2018 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 2 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 3 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 4 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 5 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (Wave Estate, Group Housing-2 (Phase-1))
| 1 | Residential ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | TOWER-D |
Number of Floor/Plots Currently Sanctioned:
16
Number of Floor/Plots Proposed: 16 Number of Floors Constructed: 16 |
||||||||||||||
|
||||||||||||||||
| 2 | TOWER-C |
Number of Floor/Plots Currently Sanctioned:
17
Number of Floor/Plots Proposed: 17 Number of Floors Constructed: 17 |
||||||||||||||
|
||||||||||||||||
| 3 | TOWER-B |
Number of Floor/Plots Currently Sanctioned:
18
Number of Floor/Plots Proposed: 18 Number of Floors Constructed: 18 |
||||||||||||||
|
||||||||||||||||
| 4 | TOWER-E |
Number of Floor/Plots Currently Sanctioned:
16
Number of Floor/Plots Proposed: 16 Number of Floors Constructed: 16 |
||||||||||||||
|
||||||||||||||||
| 5 | TOWER-F |
Number of Floor/Plots Currently Sanctioned:
15
Number of Floor/Plots Proposed: 15 Number of Floors Constructed: 15 |
||||||||||||||
|
||||||||||||||||
| 6 | TOWER-G |
Number of Floor/Plots Currently Sanctioned:
14
Number of Floor/Plots Proposed: 14 Number of Floors Constructed: 14 |
||||||||||||||
|
||||||||||||||||
| 7 | TOWER-H |
Number of Floor/Plots Currently Sanctioned:
13
Number of Floor/Plots Proposed: 13 Number of Floors Constructed: 13 |
||||||||||||||
|
||||||||||||||||
| 8 | TOWER-T |
Number of Floor/Plots Currently Sanctioned:
9
Number of Floor/Plots Proposed: 9 Number of Floors Constructed: 9 |
||||||||||||||
|
||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Open | 7200 (in sqr Mtrs) | 311 | 250 |
| 2 | Basement | 15000 (in sqr Mtrs) | 437 | 350 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Drinking Water | Internal Infrastructure Facilities | 50.00 |
| 2 | Use for Renewable Energy | Internal Infrastructure Facilities | 80.00 |
| 3 | Street Lighting | Internal Infrastructure Facilities | 40.00 |
| 4 | sewerage | Internal Infrastructure Facilities | 70.00 |
| 5 | roads | Internal Infrastructure Facilities | 20.00 |
| 6 | storm | Internal Infrastructure Facilities | 45.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | Water Supply System | Self-Development | External Infrastructure Facilities | 70.00 |
| 2 | External Roads and Road System Landscaping | Self-Development | External Infrastructure Facilities | 20.00 |
| 3 | Sewerage and Drainage System | Self-Development | External Infrastructure Facilities | 40.00 |
| 4 | Electricity Supply Transformer and Sub Station | Self-Development | External Infrastructure Facilities | 35.00 |
| 5 | Water Supply System | Self-Development | External Infrastructure Facilities | 60.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | CASTLE LANDCON PRIVATE LTD |
Real Estate Agent
PBRERA - SAS81- REA0066 |
CASTLE LANDCON PRIVATE LTD | Wave Estate |
| Address for Official Communication |
S.C.O. 539,
,
S.A.S. Nagar, Level 1, Sector 70, Sahibzada Ajit Singh Nagar, Punjab 160071
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160071 Email: baljeet.castle[at]gmail.com Mobile/Landline Number: 9915377000 |
|||
| 2 | CHADHA REALTORS P LTD |
Real Estate Agent
PBRERA-SAS81-REA0534 |
CHADHA REALTORS P LTD | WAVE ESTATE |
| Address for Official Communication |
Sco 503,
,
Sec 70, MOHALI
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160071 Email: ipsingh[at]chadharealtors.com Mobile/Landline Number: 9592800021 |
|||
| 3 | M J REALTORS |
Real Estate Agent
PBRERA-LDH45-REA0345 |
M J REALTORS | Wave Estate |
| Address for Official Communication |
41/1, WALIA COMPLEX,
,
DUGRI ROAD, Ludhiana
Ludhiana , Punjab - 141002 Email: realtorsmj[at]gmail.com Mobile/Landline Number: 9781699999 |
|||
| 4 | MONGA REALTORS PVT LTD |
Real Estate Agent
PBRERA-SAS81-REA0082 |
MONGA REALTORS PVT LTD | wave Estate |
| Address for Official Communication |
SC0 672, SECOND FLOOR
,
SECTOR-70,MOHALI
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160071 Email: suchetmonga[at]yahoo.co.in Mobile/Landline Number: 9815233416 |
|||
| 5 | BHALLA REAL ESTATE |
Real Estate Agent
PBRERA-SAS81-REA0324 |
Bhalla Real Estate | Wave Estate |
| Address for Official Communication |
SCO 544 FF
,
Sector 70 Mohali
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160071 Email: bhallarealestate[at]gmail.com Mobile/Landline Number: 9216224200 |
|||
| 6 | STUDIO DRA INTERNATIONAL DESIGNERS PVT LTD |
Real Estate Agent
|
Studio DRA International designers Pvt Ltd | Wave Estate |
| Address for Official Communication |
A‐37, Sector 4, Third Floor,
,
Noida
Gautam Buddha Nagar , Uttar Pradesh - 201301 Email: kapil.handa[at]studiodra.com Mobile/Landline Number: 9818888626 |
|||
| 7 | MEHRO CONSULTANTS |
Structural Engineer
|
Mehro consultants | Wave Estate |
| Address for Official Communication |
A‐1/36, Safarjung Enclave,
,
New Delhi,
New Delhi , Delhi - 110029 Email: deepakthakur.mehro[at]gmail.com Mobile/Landline Number: 9810650678 |
|||
| 8 | ABHILASHA ENTERPRISES |
Contractor
|
ABHILASHA ENTERPRISES | Wave Estate |
| Address for Official Communication |
Near Shiv Mandir,
,
Zila Parishad Road
Rampur , Uttar Pradesh - 244901 Email: abhilashaentmohali[at]gmail.com Mobile/Landline Number: 7986180256 |
|||
| 9 | MEP LEC PROJECTS INDIA PVT LTD |
Contractor
|
MEP LEC PROJECTS INDIA PVT LTD | Wave Estate |
| Address for Official Communication |
MEP LEC PROJECTS INDIA PVT. LTD. C‐141,
,
Sector 65, Noida
Gautam Buddha Nagar , Uttar Pradesh - 201309 Email: meplecmohali[at]gmail.com Mobile/Landline Number: 7859866638 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| -- | -- | -- | -- | -- | -- |
Open official attachment ↗