Promoter Details (Other Than Individual)
| KLG Infra | Partnerships | ||
| Main Objects of Organization | Real Estate Developers | ||
| Registered Address of Organization |
DSS-64, Mohali Citi Centre
,
Block-F Aero City
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 |
||
| Official Address |
DSS-64, Mohali Citi Centre
,
Block-F, Aero City
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 |
||
| 5 (in years) | 0 (in years) | ||
| WebLink (Promoter/Parent-Entity) | |||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | Partner | Anil Goyal |
H.No. 48
,
Sector-7, Panchkula
Panchkula , Haryana - 134109 Email: anilgoyal134[at]gmail.com |
|
| 2 | Partner | Pawan Goyal |
H. No. 134
,
Shivalik Enclave, NAC Manimajra
Chandigarh , Chandigarh - 160011 Email: sarafjew[at]gmail.com |
|
| 3 | Partner | Ravi Goel |
H. No. 3180
,
Sector-28 D
Chandigarh , Chandigarh - 160047 Email: ravigoyal.pp[at]gmail.com |
|
| 4 | Partner | Amit Jindal |
H. No. 21
,
Shivalik Enclave, NAC Manimajra
Chandigarh , Chandigarh - 160011 Email: jindalamit21[at]yahoo.com |
|
| 5 | Partner | Munish Kumar |
H. No. 1056
,
Sector-43 B
Chandigarh , Chandigarh - 160022 Email: munisharora504[at]gmail.com |
|
| 6 | Partner | Anish Kumar |
H. No. 1056
,
Sector-43 B
Chandigarh , Chandigarh - 160022 Email: savnisharora[at]gmail.com |
|
| 7 | Partner | Savnish Kumar |
H. No. 1056
,
Sector-43 B
Chandigarh , Chandigarh - 160022 Email: savnisharora[at]gmail.com |
|
| 8 | Partner | Ashok Jindal |
H. No. 21
,
Shivalik Enclave, NAC Manimajra
Chandigarh , Chandigarh - 160011 Email: jindalashok22[at]yahoo.com |
|
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | Mohali Citi Centre 3 | On-going | 39578.26 | 10-Apr-2022 | 25-Mar-2027 | 25-Mar-2027 |
| 2 | Mohali Citi Centre Walk | On-going | 23041.5 | 05-Dec-2022 | 30-Nov-2027 | 30-Nov-2027 |
| 3 | Mohali Citi Centre 4 | On-going | 18244.11 | 15-Feb-2024 | 10-Feb-2029 | 10-Feb-2029 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | Mohali Citi Centre 3 | Rishab Kalia VS KLG Infra | GCNo 01612023 | Honble Chairman |
About the Project
| Project Name | Mohali Citi Centre 3 | ||
| Project Address |
Block-F, Aero City
,
SAS Nagar Mohali
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 |
||
| Project Amenities | Street Lights, Internal Roads, Parking, Security, CC Camera, Drinkable Water, etc | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Commercial (Building/Tower Development) |
||
| Project Status | New Project | Project Cost (in rupees) | 5279767228.00 (INR) |
| Project Start Date | 10-Apr-2022 | Proposed/ Expected Date of Project Completion as specified in Form B | 25-Mar-2027 |
| Litigation(s) related to Project | Nil | Mega Project (Yes/No) | No |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
RCC Framed with Coal Baked Bricks :- Vetrified Tiles etc :- Paint :- CP Fittings if required :- Wires, Cables and Switches :- NA |
||
| Authorized Person for Communication with regards to Project |
Anil
Goyal
H. No. 48 , Sector-7, Panchkula Panchkula , Haryana - 134109 E-Mail: anilgoyal34[at]gmail.com Mobile Phone: 9814301635 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | Kotak Mahindra Bank Limited | Branch Name | Kotak Mahindra Bank ltd. |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | KKBK0004117 |
| Account Holder Name | KLG Infra | ||
| Bank Address |
SCO 37, JLPL, Sector 82
,
SAS Nagar Mohali
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055 |
||
Project Land Details
| 39578.26 (in sqr mtrs) | |||
| 0 (in sqr mtrs) | 39578.26 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 17794.313 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 21783.947 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | NA--NA--NA | 39578.26 (in sqr mtrs) | MOHALI | Not Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 3 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 4 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 5 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 6 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 7 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 8 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 9 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 10 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 11 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 12 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 13 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 14 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 15 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 16 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 17 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 18 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 19 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 3 | Draft Agreement of Sale highlighting the changes | -- | -- |
Open official attachment ↗
|
| 4 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Amendments (Applied) | 14-Oct-2022 |
Open official attachment ↗
|
| 2 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Approvals (Received) | 28-May-2021 |
Open official attachment ↗
|
| 3 | CLU Certificate | -- | -- |
Open official attachment ↗
|
| 4 | Copy of Registration as Promoter | -- | -- |
Open official attachment ↗
|
| 5 | Electric Substation NOC | Legal Documents (To Be Applied) | 29-Nov-2022 |
Open official attachment ↗
|
| 6 | Environment Clearance certificate/ NOC | Approvals (Received) | 02-Mar-2022 |
Open official attachment ↗
|
| 7 | License as Promoter from competent Authority | Approvals (Received) | 16-Jul-2021 |
Open official attachment ↗
|
| 8 | License to develop colony or society from Competent Authority | -- | -- |
Open official attachment ↗
|
| 9 | NOC from Fire Department/ Chief Fire Officer | Permissions (Received) | 24-May-2022 |
Open official attachment ↗
|
| 10 | NOC from Mining Department | Approvals (Received) | 29-Mar-2022 |
Open official attachment ↗
|
| 11 | Other Document (Declaration for PSPCL NOC) | Legal Documents (To Be Applied) | 29-Nov-2022 |
Open official attachment ↗
|
| 12 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 22-Nov-2022 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Collaboration or Joint Development Agreement | -- | -- |
Open official attachment ↗
|
| 2 | Consent details of actual owner of Land | -- | -- |
Open official attachment ↗
|
| 3 | Land Title Deed(s) - In case land is not owned by Promoter | -- | -- |
Open official attachment ↗
|
| 4 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 5 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 6 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (Mohali Citi Centre 3)
| 1 | Commercial ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | BLOCK-A SECOND FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 2 | BLOCK-A GROUND FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 3 | BLOCK-A FIRST FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 4 | BLOCK-A THIRD FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 5 | BLOCK-A FOURTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 6 | BLOCK-A FIFTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 7 | BLOCK-A SIXTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 8 | BLOCK-A SEVENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 9 | BLOCK-B GF |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 10 | BLOCK-B 1ST FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 11 | BLOCK-B 2ND FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 12 | BLOCK-B 3RD FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 13 | BLOCK-B 4TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 14 | BLOCK-B 5TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 15 | BLOCK-B 6TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 16 | BLOCK-B 7TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 17 | BLOCK-B 8TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 18 | BLOCK-B 9TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
10
Number of Floor/Plots Proposed: 10 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
| 19 | BLOCK-A BASEMENT |
Number of Floor/Plots Currently Sanctioned:
8
Number of Floor/Plots Proposed: 8 Number of Floors Constructed: 0 |
|||||||||||||||||||||
|
|||||||||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Open | 5555.417 (in sqr Mtrs) | 241 | 0 |
| 2 | Basement | 86651.031 (in sqr Mtrs) | 1618 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | Construction is Going On. | 0.00 |
| 2 | Drinking Water | Construction is Going On. | 0.00 |
| 3 | Rain Water Harvesting | Construction is Going On. | 0.00 |
| 4 | Street Lighting | Construction is Going On. | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | Self-Development | Construction is Going On. | 0.00 |
| 2 | Water Supply System | Self-Development | Construction is Going On. | 0.00 |
| 3 | Sewerage and Drainage System | Self-Development | Construction is Going On. | 0.00 |
| 4 | Electricity Supply Transformer and Sub Station | Self-Development | Construction is Going On. | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | TRIPAT GIRDHAR |
Architect
|
2021 | Mohali Citi Centre, Mohali Citi Centre1, Mohali Citi Centre2 etc |
| Address for Official Communication |
SCO 230-231
,
3rd Floor Sector 34 Chandigarh
Chandigarh , Chandigarh - 160047 Email: tripatgirdhararch[at]gmail.com Mobile/Landline Number: 1725016372 |
|||
| 2 | HARPAL SINGH |
Contractor
|
Surya Constructions Pvt Ltd | Mohali Citi Centre, Mohali Citi Centre1, Mohali Citi Centre2 etc |
| Address for Official Communication |
H. No. 4070
,
Sector-68, Mohali
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 Email: info[at]suryacons.com Mobile/Landline Number: 8855258511 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-IV (October-December) | 2022 | QUP2022L20234493 | 13-Nov-2023 | Open official attachment ↗ |
| 2 | QTR-I (January-March) | 2023 | QUP2023F20234494 | 13-Nov-2023 | Open official attachment ↗ |
| 3 | QTR-II (April-June) | 2023 | QUP2023S20234495 | 13-Nov-2023 | Open official attachment ↗ |
| 4 | QTR-III (July-September) | 2023 | QUP2023T20234496 | 13-Nov-2023 | Open official attachment ↗ |
| 5 | QTR-IV (October-December) | 2023 | QUP2023L20241359 | 22-May-2024 | Open official attachment ↗ |
| 6 | QTR-I (January-March) | 2024 | QUP2024F20241360 | 23-May-2024 | Open official attachment ↗ |
| 7 | QTR-II (April-June) | 2024 | QUP2024S20242790 | 15-Oct-2024 | Open official attachment ↗ |
| 8 | QTR-III (July-September) | 2024 | QUP2024T20242791 | 15-Oct-2024 | Open official attachment ↗ |
| 9 | QTR-IV (October-December) | 2024 | QUP2024L20250350 | 15-Jan-2025 | Open official attachment ↗ |
| 10 | QTR-I (January-March) | 2025 | QUP2025F20251203 | 12-Apr-2025 | Open official attachment ↗ |
| 11 | QTR-II (April-June) | 2025 | QUP2025S20252136 | 13-Jul-2025 | Open official attachment ↗ |
| 12 | QTR-III (July-September) | 2025 | QUP2025T20253663 | 11-Oct-2025 | Open official attachment ↗ |
| 13 | QTR-IV (October-December) | 2025 | QUP2025L20260347 | 13-Jan-2026 | Open official attachment ↗ |
| 14 | QTR-I (January-March) | 2026 | QUP2026F20261601 | 14-Apr-2026 | Open official attachment ↗ |
| 15 | QTR-II (April-June) | 2026 | QUP2026S20263426 | 14-Jul-2026 | Open official attachment ↗ |
Open official attachment ↗