CP SQUARE

PBRERA-SAS81-PC0099

Authority record captured 16 September 2026 · Readable archive prepared 24 September 2026 by Acres To Yards.

This is the filed record for the project and registration shown here. Match the selected phase, tower, plot or unit to this record; it does not establish approval of other similarly named projects or components.

Presentation has been adapted for readable viewing. Portal scripts have been removed and bank account numbers omitted. Filed information has not been refreshed since capture; confirm subsequent amendments and extensions with the authority.

Open original authority record ↗

Registration and filed dates do not establish current availability, completion, title clearance or a contractual possession date.


Promoter Details (Other Than Individual)
TDI INFRATECH LIMITED Public Limited Company
Main Objects of Organization PROPERTY DEVELOPER AND BUILDER/CONTRACTOR
Registered Address of Organization MAHINDRA TOWER, 2A , BHIKAJI CAMA PLACE SECOND FLOOR
New Delhi , Delhi - 110066
Official Address SCO: 678-679 TDI HOUSE , SECTOR 119 200 FT INTERNATIONAL AIRPORT ROAD
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301
10 (in years) 15 (in years)
WebLink (Promoter/Parent-Entity) Not Available
Organization Member Details (If Applicable)
Sr.No Designation Name of Member Official Address View Photograph
1 DIRECTOR ROHIT GOGIA H NO 64 VIDYA APARTMENT , MIANWALI NAGAR PASCHIM VIHAR SUNDER VIHAR PUNJABI BAGH
West Delhi , Delhi - 110087
Email: ROHIT.GOGIA[at]TDIGROUP.NET
2 COMPANY SECRETARY GURPREET SINGH GANDHI 8627-B GAUSHALLA MARG NEW ROHTAK ROAD , KAROL BAGH
Central Delhi , Delhi - 110005
Email: gurpreet.singh.gandhi[at]gmail.com
3 VICE PRESIDENT-AUTHORISED SIGNATORY PRINCE CHHABRA H NO 1315 , SILVER TONE SOCIETY SECTOR 48 B
Chandigarh , Chandigarh - 160047
Email: tdiprince[at]gmail.com
4 CHAIRMAN RAVINDER TANEJA 9 KASTURBA GANDHI MARG , CONNAUGHT PLACE
New Delhi , Delhi - 110001
Email: ravinder.taneja[at]tdigroup.net
5 DIRECTOR RENU TANEJA 9 KASTURBA GANDHI MARG , OPPOSITE DIWAN CHAND RESEARCH INSTITUTE NEW DELHI GPO
Central Delhi , Delhi - 110001
Email: renu.taneja[at]tdigroup.net
6 DIRECTOR VED PRAKASH MULTANI A-91, WEST PATEL NAGAR , PATEL NAGAR, CENTRAL DELHI
Central Delhi , Delhi - 110008
Email: VED.PRAKASH[at]TDIGROUP.NET
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
Sr.No Project Name Project Status Area Constructed (in Sqr mtr) Project Start Date Original Proposed Date of Complete Actual Complete Date
1 Wellington Height-1 Complete 46451.5 20-May-2010 04-Sep-2013 04-Sep-2013
2 My Floors Complete 16536.734 23-Dec-2010 02-Nov-2011 02-Nov-2011
3 TDI Business Centre Complete 20067.048 19-May-2011 15-Sep-2015 15-Sep-2015
4 Connaught Place Complete 11438.22 10-Jan-2012 04-Oct-2013 04-Oct-2013
5 Wellington Height-2 Complete 18580.6 24-Jun-2013 26-Oct-2016 26-Oct-2016
6 Affordable Homes Complete 16738.15 05-Feb-2014 21-Dec-2015 21-Dec-2015
7 SAPPHIRE HOMES On-going 3533 14-Mar-2014 31-Jul-2019 31-Jul-2019
8 Connaught Plaza On-going 801.278 08-Apr-2016 10-Apr-2019 10-Apr-2019
9 Connaught Residency On-going 32415.32 21-Apr-2017 31-Jul-2020 31-Jul-2020
10 CONNAUGHT RESIDENCY EXTENSION On-going 1138.179 21-Apr-2017 05-Feb-2021 05-Feb-2021
11 Wellington Height Ext Block M and N On-going 2982.53 10-Jul-2017 10-Jul-2019 10-Jul-2019
12 Taj Plaza On-going 9562.72 05-Jun-2018 05-Feb-2021 05-Feb-2021
13 BOOTHS MOHALI-1 On-going 927 15-Jun-2018 31-May-2021 31-May-2021
14 Mohali-I On-going 33791.25 09-Jul-2018 20-Mar-2021 20-Mar-2021
15 CP SQUARE On-going 6458 10-Dec-2018 30-Dec-2021 30-Dec-2021
16 TDI PARK STREET On-going 9936.13 18-Nov-2019 25-Feb-2025 25-Feb-2025
17 CP SQUARE EXTENSION On-going 4855.66 20-Oct-2020 30-Jul-2023 30-Jul-2023
18 SAPHHIRE RESIDENTIAL PLOTS On-going 4293.514 05-Nov-2020 30-Jul-2023 30-Jul-2023
19 GOLF LINK On-going 63748.33 11-Jun-2021 31-Mar-2023 31-Mar-2023
20 SOUTH EXTENSION II On-going 19964.0624 15-Jun-2021 31-Mar-2025 31-Mar-2025
Litigation(s) related to Past Projects
Sr.No Project Name Case Title Case Number Authority/Forum Name where case is Pending/Resolved
1 Connaught Residency Ashok Kumar Sharma Vs TDI Infratech AdCNo00432025 ADJUDICATING OFFICER
2 Connaught Residency Anupam Sharma Vs TDI Infratech GCNo00922025 Sh Binod Kumar Singh Member
3 Connaught Residency Amandeep Singh Virdi Vs TDI Infratech AdCNo01092022 ADJUDICATING OFFICER
4 Connaught Residency Manpreet Kaur Vs TDI Infratech AdCNo01182024 ADJUDICATING OFFICER
5 Connaught Residency Navjot Singh Vs TDI Infratech GCNo00262025 Sh Binod Kumar Singh Member
6 Connaught Residency Mukesh Kumar Vs TDI Infratech AdCNo01202024 ADJUDICATING OFFICER
7 Connaught Residency VARUN SUYRAVANSHI Vs TDI Infratech GCNo03942024 Sh Binod Kumar Singh Member
8 Connaught Residency VARUN SURYAVANSHI Vs TDI Infratech AdCNo01352024 ADJUDICATING OFFICER
9 Connaught Residency Amit Trivedi Vs TDI Infratech GCNo04292023 Sh Binod Kumar Singh Member
10 Connaught Residency Yogeshwar Kumar Gautam Vs TDI Infratech AdCNo01082022 ADJUDICATING OFFICER
11 Connaught Residency Jasbir Singh Rehal Vs TDI Infratech GCNo00222023 Sh Binod Kumar Singh Member
12 Connaught Residency Kulbir Singh Rehal Vs TDI Infratech GCNo00802023 Sh Binod Kumar Singh Member
13 Connaught Residency Khushboo Garg Vs TDI Infratech AdCNo00192023 ADJUDICATING OFFICER
14 Connaught Residency Mukesh Kumar Vs TDI Infratech GCNo03852024 Sh Rakesh Kumar Goyal Chairperson
15 Connaught Residency Manpreet Kaur Vs TDI Infratech GCNo03762024 Sh Rakesh Kumar Goyal Chairperson
16 Connaught Residency Ashok Kumar Sharma Vs TDI Infratech GCNo01492025 Sh Arunvir Vashista Member
17 Connaught Residency YK gautam GCNo05722022 Sh Rakesh Kumar Goyal Chairperson
18 Connaught Residency Gurpreet Kaur Vs TDI Infratech GCNo00082025 Sh Arunvir Vashista Member
19 Connaught Residency NAVDEEP LOVELY Vs TDI Infratech AdCNo00132025 ADJUDICATING OFFICER
20 Connaught Residency NAVDEEP LOVELY Vs TDI Infratech GCNo00042025 Sh Arunvir Vashista Member
21 Connaught Residency Gurdarshan Singh Brar Vs TDI Infratech AdCNo00142025 ADJUDICATING OFFICER
22 Connaught Residency Gurdarshan Singh Brar Vs TDI Infratech GCNo00062025 Sh Binod Kumar Singh Member
23 Connaught Residency Gurpreet Kaur Vs TDI Infratech AdCNo00152025 ADJUDICATING OFFICER
24 Connaught Residency Amarjeet Kaur Vs TDI Infratech GCNo00102025 Sh Binod Kumar Singh Member
25 Connaught Residency Anupam Sharma Vs TDI Infratech AdCNo00162025 ADJUDICATING OFFICER
26 Connaught Residency Yogeshwar Kumar Gautam Vs TDI Infratech AdCNo00272025 ADJUDICATING OFFICER
27 Connaught Residency Ranjit Singh Vs TDI Infratech GCNo00112025 Sh Binod Kumar Singh Member
28 SOUTH EXTENSION II Bhushan Kumar Vs Taneja Developers and Infrastructure Ltd. GCNo00502024 Sh Arunvir Vashista Member
29 Wellington Height-1 Wellington Heights Resident Welfare Association Vs TDI Infratech GCNo03002023UR Sh Arunvir Vashista Member
30 Wellington Height-1 Wellington Heights Resident Welfare Association Vs TDI Infratech AdCNo00622023UR ADJUDICATING OFFICER
31 Wellington Height-2 MANMOHAN SINGH BEDI Vs TDI Infratech GCNo02732023 Sh Arunvir Vashista Member

About the Project
Project Name CP SQUARE
Project Address CP SQUARE , TDI CITY-I SECTOR 117 INTERNATIONAL AIRPORT ROAD
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301
Project Amenities IDEALLY CONNECTED WITH 200 FT INTERNATIONAL AIRPORT ROAD WHICH IS AN INTEGRATED PART OF TDI MEGA TOWNSHIP PROJECT . ELECTRICITY SUPPLY, SEWERAGE, STORM AND WATER SUPPLY CONNECTED TO THE MAIN SERVICES OF TDI PROJECT
Project Zone Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur.
Type of Project (1) Commercial (Plotted Development)
Project Status New Project Project Cost (in rupees) 13200000.00 (INR)
Project Start Date 10-Dec-2018 Proposed/ Expected Date of Project Completion as specified in Form B 30-Dec-2021
Litigation(s) related to Project Nil Mega Project (Yes/No) Yes
Specification Details of Proposed Project as per the Brochure/ Prospectus :- NA
:- NA
:- NA
:- NA
:- NA
:- NA
Authorized Person for Communication with regards to Project MANDEEP SHARMA
TDI INFRATECH LIMITED, SCO 144-145 , SECTOR 117 200 FEET INTERNATIONAL AIRPORT ROAD TDI CITY
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301
E-Mail: mandeep.sharma[at]tdigroup.net Mobile Phone: 9501101502
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
Bank Name Bank of Maharashtra Branch Name NEW DELHI KALKAJI
Bank Account Number Account number omitted from this archived copy; consult the authority source. Bank IFSC Code MAHB0000974
Account Holder Name TDI INFRATECH LTD
Bank Address BANK OF MAHARASHTRA , G-1 ALAKNANDA KALKAJI NEW DELHI
New Delhi , Delhi - 110001
Project Land Details
6457.989 (in sqr mtrs)
6457.989 (in sqr mtrs) 0 (in sqr mtrs)
0 (in sqr mtrs) 0 (in sqr mtrs)
2898.64 (in sqr mtrs) 0 (in sqr mtrs)
3559.349 (in sqr mtrs)
Project Land Khasra(s) and Area Details
SrNo Khasra Number of Land proposed to be developed Area of Land proposed under Khasra Name of Villages under Khasra Project Land Status
1 29//3/1,3/2,6,7 6454.965 (in sqr mtrs) BALLOMAJRA Owned By Promoter

Project Plan(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 Approved Layout Plan -- -- Open official attachment ↗
2 Approved Project Site OR Location Map -- -- Open official attachment ↗
3 Sanctioned Building Plan -- -- Open official attachment ↗
Proforma of documents to be signed with Allottees
Sr.No Document Name Reference Number Issue Date View PDF
1 Pro forma Agreement of Sale to be signed with allottees -- -- Open official attachment ↗
2 Pro forma of Allotment Letter to be provided to allottees -- -- Open official attachment ↗
3 Pro forma of Conveyance Deed to be signed with allottees -- -- Open official attachment ↗
Project Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Authenticated Copy of Form B -- -- Open official attachment ↗
2 CA Certificate (Form 3) -- -- Open official attachment ↗
Project Approvals Document(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 AAI Height NOC from Civil Aviation Department/ Airport Authority Clearances (Received) 29-Sep-2016 Open official attachment ↗
2 Amendments or revisions in sanctioned Layout/ Sanction / Building Plan Approvals (Received) 06-Dec-2018 Open official attachment ↗
3 Commencement Certificate (Mega Project Category) -- -- Open official attachment ↗
4 Other Document (Change of Land Use) Approvals (Received) 24-Aug-2018 Open official attachment ↗
Project Land Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Land Title Search Report -- -- Open official attachment ↗
2 Latest Jamabandi Document -- -- Open official attachment ↗
3 Legal Title Deed(s) - In case Land is owned by Promoter -- -- Open official attachment ↗
4 Non Encumbrance Certificate -- -- Open official attachment ↗
5 Project Land Khasra Report or Plan -- -- Open official attachment ↗
Project Brochure/ Prospectus Documents
Sr.No Document Name View Details
1 Advertisement and Brochure/ Prospectus Open official attachment ↗

Type of Project (CP SQUARE)
1 Commercial ( Plotted Development )
Project Building/ Tower/ Block Construction & Inventory Details
Sr.No Building/Tower/Block Name Number of Floor/Plots related to Building/ Tower/ Block
1 CP SQUARE Number of Floor/Plots Currently Sanctioned: 35
Number of Floor/Plots Proposed: 35
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 COMMERCIAL PLOT 35 0 2898.643 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
Parking Details
Sr.No Type of Parking Total Area of Parking Space Total Number of Parking Space No of Parking Space Booked or Sold
1 Open 2103.51 (in sqr Mtrs) 91 0
2 Open 1455.835 (in sqr Mtrs) 60 0
Internal Infrastructure and Facilities Details
Sr.No Internal Infrastructure Facilities Name Internal Infrastructure Facilities Details Work Progress % Percentage
1 Drinking Water Necessary facilities has been provided 100.00
2 Street Lighting FACILITIES REGARDING STREET LIGHTING HAS BEEN PROVIDED 100.00
External Infrastructure and Facilities Details
Sr.No External Infrastructure Facilities Name Facilities Type External Infrastructure Facilities Details Work Progress %age
1 External Roads and Road System Landscaping Self-Development THE WORKS OF EXTERNAL ROADS AND LANDSCAPING IS IN PROGRESS 89.00
2 Water Supply System Self-Development Infrastructure regarding the Water Supply has been provided 100.00
3 Sewerage and Drainage System Self-Development infrastructure and facilities regarding Sewerage and Drainage System has been provided and laid 100.00
4 External Roads and Road System Landscaping Self-Development Facilities regarding the Electricity Supply Transformers has been completed 100.00
5 Solid Waste Management and Disposal Self-Development Facilities has been completed 100.00

Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
Sr.No Name of Professional Associated Consultant Type Name & Year of Establishment of Promoter Name & Profile of Key Projects Completed
1 SHIPRA BHATIA Architect
CA 2004 34608
NEEV ARCHITECTS AND ENGINEERS AND 2016 DSOI TERRACE RESTAURANT, KANHA PHARMA IN BADDI, LOREAL FACTORY IN BADDI
Address for Official Communication NEEV ARCHITECTS AND ENGINEERS , 12-A UPPER GROUND FLOOR TRICITY PLAZA PEERMUCHALLA ZIRAKPUR (PB)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160104
Email: SHIPRA.BHATIA[at]YAHOO.COM Mobile/Landline Number: 9915200101

Quarterly Updates of Registered Project
Sr.No. Quarter Name Quarter Year Reference Number Reference Date View Details
1 QTR-IV (October-December) 2019 QUP2019L20211240 01-Aug-2021 Open official attachment ↗
2 QTR-I (January-March) 2020 QUP2020F20220558 01-Mar-2022 Open official attachment ↗
3 QTR-II (April-June) 2020 QUP2020S20220559 01-Mar-2022 Open official attachment ↗
4 QTR-III (July-September) 2020 QUP2020T20220560 01-Mar-2022 Open official attachment ↗
5 QTR-IV (October-December) 2020 QUP2020L20220595 13-Mar-2022 Open official attachment ↗
6 QTR-I (January-March) 2021 QUP2021F20220596 13-Mar-2022 Open official attachment ↗
7 QTR-II (April-June) 2021 QUP2021S20220597 13-Mar-2022 Open official attachment ↗
8 QTR-III (July-September) 2021 QUP2021T20220598 13-Mar-2022 Open official attachment ↗
9 QTR-IV (October-December) 2021 QUP2021L20220599 14-Mar-2022 Open official attachment ↗
10 QTR-I (January-March) 2022 QUP2022F20264549 18-Aug-2026 Open official attachment ↗
11 QTR-II (April-June) 2022 QUP2022S20264550 18-Aug-2026 Open official attachment ↗
12 QTR-III (July-September) 2022 QUP2022T20264551 18-Aug-2026 Open official attachment ↗
13 QTR-IV (October-December) 2022 QUP2022L20264552 18-Aug-2026 Open official attachment ↗
14 QTR-I (January-March) 2023 QUP2023F20264553 18-Aug-2026 Open official attachment ↗
15 QTR-II (April-June) 2023 QUP2023S20264554 18-Aug-2026 Open official attachment ↗
16 QTR-III (July-September) 2023 QUP2023T20264555 18-Aug-2026 Open official attachment ↗
17 QTR-IV (October-December) 2023 QUP2023L20264556 18-Aug-2026 Open official attachment ↗
18 QTR-I (January-March) 2024 QUP2024F20264557 18-Aug-2026 Open official attachment ↗
19 QTR-II (April-June) 2024 QUP2024S20264558 18-Aug-2026 Open official attachment ↗
20 QTR-III (July-September) 2024 QUP2024T20264559 18-Aug-2026 Open official attachment ↗
21 QTR-IV (October-December) 2024 QUP2024L20264560 18-Aug-2026 Open official attachment ↗
22 QTR-I (January-March) 2025 QUP2025F20264561 18-Aug-2026 Open official attachment ↗
23 QTR-II (April-June) 2025 QUP2025S20264562 18-Aug-2026 Open official attachment ↗
24 QTR-III (July-September) 2025 QUP2025T20264563 18-Aug-2026 Open official attachment ↗
25 QTR-IV (October-December) 2025 QUP2025L20264564 18-Aug-2026 Open official attachment ↗
26 QTR-I (January-March) 2026 QUP2026F20264565 18-Aug-2026 Open official attachment ↗
27 QTR-II (April-June) 2026 QUP2026S20264566 18-Aug-2026 Open official attachment ↗