Promoter Details (Other Than Individual)
| TDI INFRATECH LIMITED | Public Limited Company | ||
| Main Objects of Organization | PROPERTY DEVELOPER AND BUILDER/CONTRACTOR | ||
| Registered Address of Organization |
MAHINDRA TOWER, 2A
,
BHIKAJI CAMA PLACE SECOND FLOOR
New Delhi , Delhi - 110066 |
||
| Official Address |
SCO: 678-679 TDI HOUSE
,
SECTOR 119 200 FT INTERNATIONAL AIRPORT ROAD
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301 |
||
| 10 (in years) | 15 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | DIRECTOR | ROHIT GOGIA |
H NO 64 VIDYA APARTMENT
,
MIANWALI NAGAR PASCHIM VIHAR SUNDER VIHAR PUNJABI BAGH
West Delhi , Delhi - 110087 Email: ROHIT.GOGIA[at]TDIGROUP.NET |
|
| 2 | COMPANY SECRETARY | GURPREET SINGH GANDHI |
8627-B GAUSHALLA MARG NEW ROHTAK ROAD
,
KAROL BAGH
Central Delhi , Delhi - 110005 Email: gurpreet.singh.gandhi[at]gmail.com |
|
| 3 | VICE PRESIDENT-AUTHORISED SIGNATORY | PRINCE CHHABRA |
H NO 1315
,
SILVER TONE SOCIETY SECTOR 48 B
Chandigarh , Chandigarh - 160047 Email: tdiprince[at]gmail.com |
|
| 4 | CHAIRMAN | RAVINDER TANEJA |
9 KASTURBA GANDHI MARG
,
CONNAUGHT PLACE
New Delhi , Delhi - 110001 Email: ravinder.taneja[at]tdigroup.net |
|
| 5 | DIRECTOR | RENU TANEJA |
9 KASTURBA GANDHI MARG
,
OPPOSITE DIWAN CHAND RESEARCH INSTITUTE NEW DELHI GPO
Central Delhi , Delhi - 110001 Email: renu.taneja[at]tdigroup.net |
|
| 6 | DIRECTOR | VED PRAKASH MULTANI |
A-91, WEST PATEL NAGAR
,
PATEL NAGAR, CENTRAL DELHI
Central Delhi , Delhi - 110008 Email: VED.PRAKASH[at]TDIGROUP.NET |
|
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | Wellington Height-1 | Complete | 46451.5 | 20-May-2010 | 04-Sep-2013 | 04-Sep-2013 |
| 2 | My Floors | Complete | 16536.734 | 23-Dec-2010 | 02-Nov-2011 | 02-Nov-2011 |
| 3 | TDI Business Centre | Complete | 20067.048 | 19-May-2011 | 15-Sep-2015 | 15-Sep-2015 |
| 4 | Connaught Place | Complete | 11438.22 | 10-Jan-2012 | 04-Oct-2013 | 04-Oct-2013 |
| 5 | Wellington Height-2 | Complete | 18580.6 | 24-Jun-2013 | 26-Oct-2016 | 26-Oct-2016 |
| 6 | Affordable Homes | Complete | 16738.15 | 05-Feb-2014 | 21-Dec-2015 | 21-Dec-2015 |
| 7 | SAPPHIRE HOMES | On-going | 3533 | 14-Mar-2014 | 31-Jul-2019 | 31-Jul-2019 |
| 8 | Connaught Plaza | On-going | 801.278 | 08-Apr-2016 | 10-Apr-2019 | 10-Apr-2019 |
| 9 | Connaught Residency | On-going | 32415.32 | 21-Apr-2017 | 31-Jul-2020 | 31-Jul-2020 |
| 10 | CONNAUGHT RESIDENCY EXTENSION | On-going | 1138.179 | 21-Apr-2017 | 05-Feb-2021 | 05-Feb-2021 |
| 11 | Wellington Height Ext Block M and N | On-going | 2982.53 | 10-Jul-2017 | 10-Jul-2019 | 10-Jul-2019 |
| 12 | Taj Plaza | On-going | 9562.72 | 05-Jun-2018 | 05-Feb-2021 | 05-Feb-2021 |
| 13 | BOOTHS MOHALI-1 | On-going | 927 | 15-Jun-2018 | 31-May-2021 | 31-May-2021 |
| 14 | Mohali-I | On-going | 33791.25 | 09-Jul-2018 | 20-Mar-2021 | 20-Mar-2021 |
| 15 | CP SQUARE | On-going | 6458 | 10-Dec-2018 | 30-Dec-2021 | 30-Dec-2021 |
| 16 | TDI PARK STREET | On-going | 9936.13 | 18-Nov-2019 | 25-Feb-2025 | 25-Feb-2025 |
| 17 | CP SQUARE EXTENSION | On-going | 4855.66 | 20-Oct-2020 | 30-Jul-2023 | 30-Jul-2023 |
| 18 | SAPHHIRE RESIDENTIAL PLOTS | On-going | 4293.514 | 05-Nov-2020 | 30-Jul-2023 | 30-Jul-2023 |
| 19 | GOLF LINK | On-going | 63748.33 | 11-Jun-2021 | 31-Mar-2023 | 31-Mar-2023 |
| 20 | SOUTH EXTENSION II | On-going | 19964.0624 | 15-Jun-2021 | 31-Mar-2025 | 31-Mar-2025 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | Connaught Residency | Ashok Kumar Sharma Vs TDI Infratech | AdCNo00432025 | ADJUDICATING OFFICER |
| 2 | Connaught Residency | Anupam Sharma Vs TDI Infratech | GCNo00922025 | Sh Binod Kumar Singh Member |
| 3 | Connaught Residency | Amandeep Singh Virdi Vs TDI Infratech | AdCNo01092022 | ADJUDICATING OFFICER |
| 4 | Connaught Residency | Manpreet Kaur Vs TDI Infratech | AdCNo01182024 | ADJUDICATING OFFICER |
| 5 | Connaught Residency | Navjot Singh Vs TDI Infratech | GCNo00262025 | Sh Binod Kumar Singh Member |
| 6 | Connaught Residency | Mukesh Kumar Vs TDI Infratech | AdCNo01202024 | ADJUDICATING OFFICER |
| 7 | Connaught Residency | VARUN SUYRAVANSHI Vs TDI Infratech | GCNo03942024 | Sh Binod Kumar Singh Member |
| 8 | Connaught Residency | VARUN SURYAVANSHI Vs TDI Infratech | AdCNo01352024 | ADJUDICATING OFFICER |
| 9 | Connaught Residency | Amit Trivedi Vs TDI Infratech | GCNo04292023 | Sh Binod Kumar Singh Member |
| 10 | Connaught Residency | Yogeshwar Kumar Gautam Vs TDI Infratech | AdCNo01082022 | ADJUDICATING OFFICER |
| 11 | Connaught Residency | Jasbir Singh Rehal Vs TDI Infratech | GCNo00222023 | Sh Binod Kumar Singh Member |
| 12 | Connaught Residency | Kulbir Singh Rehal Vs TDI Infratech | GCNo00802023 | Sh Binod Kumar Singh Member |
| 13 | Connaught Residency | Khushboo Garg Vs TDI Infratech | AdCNo00192023 | ADJUDICATING OFFICER |
| 14 | Connaught Residency | Mukesh Kumar Vs TDI Infratech | GCNo03852024 | Sh Rakesh Kumar Goyal Chairperson |
| 15 | Connaught Residency | Manpreet Kaur Vs TDI Infratech | GCNo03762024 | Sh Rakesh Kumar Goyal Chairperson |
| 16 | Connaught Residency | Ashok Kumar Sharma Vs TDI Infratech | GCNo01492025 | Sh Arunvir Vashista Member |
| 17 | Connaught Residency | YK gautam | GCNo05722022 | Sh Rakesh Kumar Goyal Chairperson |
| 18 | Connaught Residency | Gurpreet Kaur Vs TDI Infratech | GCNo00082025 | Sh Arunvir Vashista Member |
| 19 | Connaught Residency | NAVDEEP LOVELY Vs TDI Infratech | AdCNo00132025 | ADJUDICATING OFFICER |
| 20 | Connaught Residency | NAVDEEP LOVELY Vs TDI Infratech | GCNo00042025 | Sh Arunvir Vashista Member |
| 21 | Connaught Residency | Gurdarshan Singh Brar Vs TDI Infratech | AdCNo00142025 | ADJUDICATING OFFICER |
| 22 | Connaught Residency | Gurdarshan Singh Brar Vs TDI Infratech | GCNo00062025 | Sh Binod Kumar Singh Member |
| 23 | Connaught Residency | Gurpreet Kaur Vs TDI Infratech | AdCNo00152025 | ADJUDICATING OFFICER |
| 24 | Connaught Residency | Amarjeet Kaur Vs TDI Infratech | GCNo00102025 | Sh Binod Kumar Singh Member |
| 25 | Connaught Residency | Anupam Sharma Vs TDI Infratech | AdCNo00162025 | ADJUDICATING OFFICER |
| 26 | Connaught Residency | Yogeshwar Kumar Gautam Vs TDI Infratech | AdCNo00272025 | ADJUDICATING OFFICER |
| 27 | Connaught Residency | Ranjit Singh Vs TDI Infratech | GCNo00112025 | Sh Binod Kumar Singh Member |
| 28 | SOUTH EXTENSION II | Bhushan Kumar Vs Taneja Developers and Infrastructure Ltd. | GCNo00502024 | Sh Arunvir Vashista Member |
| 29 | Wellington Height-1 | Wellington Heights Resident Welfare Association Vs TDI Infratech | GCNo03002023UR | Sh Arunvir Vashista Member |
| 30 | Wellington Height-1 | Wellington Heights Resident Welfare Association Vs TDI Infratech | AdCNo00622023UR | ADJUDICATING OFFICER |
| 31 | Wellington Height-2 | MANMOHAN SINGH BEDI Vs TDI Infratech | GCNo02732023 | Sh Arunvir Vashista Member |
About the Project
| Project Name | Taj Plaza | ||
| Project Address |
SCO No 501 to 528 TAJ PLAZA
,
SECTOR 118 TDI CITY
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301 |
||
| Project Amenities | Site Located on International Airport Road and is a part of Mega Township TDI City enjoy Public Health Services laid for the Mega Township with proper street Lights which are planned for the project and Electrical Scheme would be approved by PSPCL | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Commercial (Building/Tower Development) |
||
| Project Status | On-going | Project Cost (in rupees) | 43534654.00 (INR) |
| Project Start Date | 05-Jun-2018 | Proposed/ Expected Date of Project Completion as specified in Form B | 31-Mar-2021 |
| Litigation(s) related to Project | Nil | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
FRAME STRUCTURE :- NA :- CEMENT PLASTER WITH PAINT :- NA :- ANCHOR FITTINGS :- NA |
||
| Authorized Person for Communication with regards to Project |
MANDEEP
SHARMA
TDI INFRATECH LIMITED, SCO 144-145 , SECTOR 117 200 FEET INTERNATIONAL AIRPORT ROAD TDI CITY Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140301 E-Mail: mandeep.sharma[at]tdigroup.net Mobile Phone: 9501101502 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | YES Bank Limited | Branch Name | 102 BANGLA SAHIB ROAD GOL MARKET NEW DELHI |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | YESB0000613 |
| Account Holder Name | TDI INFRATECH LTD | ||
| Bank Address |
YES BANK LTD
,
102 BANGLA SAHIB ROAD GOL MARKET
New Delhi , Delhi - 110001 |
||
Project Land Details
| 9562.72 (in sqr mtrs) | |||
| 9563.06 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 2775 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 6788.06 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 32//7/1/1,7/2,8/1,8/2,8/3,9,12,13/1,13/2,14/1 | 9563.06 (in sqr mtrs) | BALLOMAJRA | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 3 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 4 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Architects Certificate (Form 1) | -- | -- |
Open official attachment ↗
|
| 2 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Clearances (Received) | 29-Sep-2016 |
Open official attachment ↗
|
| 2 | Amendments or revisions in sanctioned Layout/ Sanction / Building Plan | Approvals (Received) | 16-Mar-2018 |
Open official attachment ↗
|
| 3 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 4 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 5 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 6 | Electric Substation NOC | Approvals (Received) | 28-Jul-2016 |
Open official attachment ↗
|
| 7 | Environment Clearance certificate/ NOC | Approvals (Received) | 01-Oct-2015 |
Open official attachment ↗
|
| 8 | Other Document (SEWERAGE NOC) | Approvals (Received) | 01-Jul-2016 |
Open official attachment ↗
|
| 9 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 14-Dec-2016 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 2 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 3 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 4 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 5 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (Taj Plaza)
| 1 | Commercial ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | TAJ PLAZA |
Number of Floor/Plots Currently Sanctioned:
28
Number of Floor/Plots Proposed: 28 Number of Floors Constructed: 2 |
||||||||||||||
|
||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Open | 4442 (in sqr Mtrs) | 193 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Street Lighting | ADEQUATE STREET LIGHTS FOR THE SAID PROJECT HAVE BEEN PROPOSED | 50.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | Sewerage and Drainage System | Self-Development | SEWERAGE AND DRAINAGE SYSTEM IS AS PER THE SERVICES LAID FOR THE MEGA TOWNSHIP TDI CITY | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | SHIPRA BHATIA |
Architect
|
NEEV ARCHITECTS AND ENGINEERS , 2016 | DSOI TERRACE RESTAURANT, KANHA PHARMA IN BADDI , LOREAL FACTORY BADDI |
| Address for Official Communication |
NEEV ARCHITECTS AND ENGINEERS
,
12-A UPPER GROUND FLOOR TRICITY PLAZA PEERMUCHALLA ZIRAKPUR (PB)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160104 Email: SHIPRA.BHATIA[at]YAHOO.COM Mobile/Landline Number: 9915200101 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-I (January-March) | 2018 | QUP2018F20211239 | 01-Aug-2021 | Open official attachment ↗ |
| 2 | QTR-II (April-June) | 2018 | QUP2018S20264567 | 18-Aug-2026 | Open official attachment ↗ |
| 3 | QTR-III (July-September) | 2018 | QUP2018T20264568 | 18-Aug-2026 | Open official attachment ↗ |
| 4 | QTR-IV (October-December) | 2018 | QUP2018L20264569 | 18-Aug-2026 | Open official attachment ↗ |
| 5 | QTR-I (January-March) | 2019 | QUP2019F20264570 | 18-Aug-2026 | Open official attachment ↗ |
| 6 | QTR-II (April-June) | 2019 | QUP2019S20264571 | 18-Aug-2026 | Open official attachment ↗ |
| 7 | QTR-III (July-September) | 2019 | QUP2019T20264572 | 18-Aug-2026 | Open official attachment ↗ |
| 8 | QTR-IV (October-December) | 2019 | QUP2019L20264573 | 18-Aug-2026 | Open official attachment ↗ |
| 9 | QTR-I (January-March) | 2020 | QUP2020F20264574 | 18-Aug-2026 | Open official attachment ↗ |
| 10 | QTR-II (April-June) | 2020 | QUP2020S20264575 | 18-Aug-2026 | Open official attachment ↗ |
| 11 | QTR-III (July-September) | 2020 | QUP2020T20264576 | 18-Aug-2026 | Open official attachment ↗ |
| 12 | QTR-IV (October-December) | 2020 | QUP2020L20264577 | 18-Aug-2026 | Open official attachment ↗ |
| 13 | QTR-I (January-March) | 2021 | QUP2021F20264578 | 18-Aug-2026 | Open official attachment ↗ |
| 14 | QTR-II (April-June) | 2021 | QUP2021S20264579 | 18-Aug-2026 | Open official attachment ↗ |
| 15 | QTR-III (July-September) | 2021 | QUP2021T20264580 | 18-Aug-2026 | Open official attachment ↗ |
| 16 | QTR-IV (October-December) | 2021 | QUP2021L20264581 | 18-Aug-2026 | Open official attachment ↗ |
| 17 | QTR-I (January-March) | 2022 | QUP2022F20264582 | 18-Aug-2026 | Open official attachment ↗ |
| 18 | QTR-II (April-June) | 2022 | QUP2022S20264583 | 18-Aug-2026 | Open official attachment ↗ |
| 19 | QTR-III (July-September) | 2022 | QUP2022T20264584 | 18-Aug-2026 | Open official attachment ↗ |
| 20 | QTR-IV (October-December) | 2022 | QUP2022L20264585 | 18-Aug-2026 | Open official attachment ↗ |
| 21 | QTR-I (January-March) | 2023 | QUP2023F20264586 | 18-Aug-2026 | Open official attachment ↗ |
| 22 | QTR-II (April-June) | 2023 | QUP2023S20264587 | 18-Aug-2026 | Open official attachment ↗ |
| 23 | QTR-III (July-September) | 2023 | QUP2023T20264588 | 18-Aug-2026 | Open official attachment ↗ |
| 24 | QTR-IV (October-December) | 2023 | QUP2023L20264589 | 18-Aug-2026 | Open official attachment ↗ |
| 25 | QTR-I (January-March) | 2024 | QUP2024F20264590 | 18-Aug-2026 | Open official attachment ↗ |
| 26 | QTR-II (April-June) | 2024 | QUP2024S20264591 | 18-Aug-2026 | Open official attachment ↗ |
| 27 | QTR-III (July-September) | 2024 | QUP2024T20264592 | 18-Aug-2026 | Open official attachment ↗ |
| 28 | QTR-IV (October-December) | 2024 | QUP2024L20264593 | 18-Aug-2026 | Open official attachment ↗ |
| 29 | QTR-I (January-March) | 2025 | QUP2025F20264594 | 18-Aug-2026 | Open official attachment ↗ |
| 30 | QTR-II (April-June) | 2025 | QUP2025S20264595 | 18-Aug-2026 | Open official attachment ↗ |
| 31 | QTR-III (July-September) | 2025 | QUP2025T20264596 | 18-Aug-2026 | Open official attachment ↗ |
| 32 | QTR-IV (October-December) | 2025 | QUP2025L20264597 | 18-Aug-2026 | Open official attachment ↗ |
| 33 | QTR-I (January-March) | 2026 | QUP2026F20264598 | 18-Aug-2026 | Open official attachment ↗ |
| 34 | QTR-II (April-June) | 2026 | QUP2026S20264599 | 18-Aug-2026 | Open official attachment ↗ |
Open official attachment ↗