One City Hub (Formerly known as IREO-HUB)

PBRERA-SAS81-PC0046

Authority record captured 16 September 2026 · Readable archive prepared 24 September 2026 by Acres To Yards.

This is the filed record for the project and registration shown here. Match the selected phase, tower, plot or unit to this record; it does not establish approval of other similarly named projects or components.

Presentation has been adapted for readable viewing. Portal scripts have been removed and bank account numbers omitted. Filed information has not been refreshed since capture; confirm subsequent amendments and extensions with the authority.

Open original authority record ↗

Registration and filed dates do not establish current availability, completion, title clearance or a contractual possession date.


Promoter Details (Other Than Individual)
PUMA REALTORS PRIVATE LIMITED Private Limited Company
Main Objects of Organization Real Estate Promoter & Developer
Registered Address of Organization 8-D, Hansalaya-15 , Barakhamba Road
New Delhi , Delhi - 110001
Official Address 8-D, Hansalaya-15 , Barakhamba Road
New Delhi , Delhi - 110001
1 (in years) 16 (in years)
WebLink (Promoter/Parent-Entity) Not Available
Organization Member Details (If Applicable)
Sr.No Designation Name of Member Official Address View Photograph
1 DIRECTOR APOORV JAIN C-479, , Defence Colony
South Delhi , Delhi - 110024
Email: apoorv[at]onecity.in
2 DIRECTOR SUNIL KUMAR JAIN C-479, , Defence Colony
South Delhi , Delhi - 110024
Email: sjain[at]onecity.in
3 Authorised Signatory Udit Jain C-479, , Defence Colony
South Delhi , Delhi - 110024
Email: udit[at]onecity.in
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
Sr.No Project Name Project Status Area Constructed (in Sqr mtr) Project Start Date Original Proposed Date of Complete Actual Complete Date
1 One City Hamlet On-going 5139.5 11-Apr-2008 30-Sep-2019 30-Sep-2019
2 One City Hamlet 1 Complete 106392 11-Apr-2008 30-Jun-2017 30-Jun-2017
3 One RISE P2 Complete 14123.53 18-Jan-2012 01-Mar-2018 01-Mar-2018
4 One City Hamlet -2 On-going 29501.58 15-May-2013 31-Dec-2022 31-Dec-2022
5 One Rise P-1 Complete 16915.86 24-Jun-2014 31-Dec-2023 31-Dec-2023
6 One City Hamlet C-1 On-going 12231.14 27-Mar-2017 31-Dec-2021 31-Dec-2021
7 One City Hub On-going 18271.42 30-Jun-2017 31-Dec-2020 31-Dec-2020
8 One City Hamlet D-105 On-going 13233.22 27-Mar-2018 31-Dec-2021 31-Dec-2021
9 One City Hamlet-4 On-going 60864.721 27-Mar-2018 31-Dec-2022 31-Dec-2022
Litigation(s) related to Past Projects
Sr.No Project Name Case Title Case Number Authority/Forum Name where case is Pending/Resolved
1 One RISE P2 AJAY GANDOTRA CC/564/2017 SCDRC-UT-CHD
2 One RISE P2 HARDISH KUMAR SHARMA AND ANR. CC/961/2016 SCDRC-UT-CHD
3 One RISE P2 VIKAS MALIK CC/58/2017 SCDRC-Punjab
4 One RISE P2 BALDEV SINGH CC/553/2017 SCDRC-UT-CHD
5 One RISE P2 SACHIN MAHAJAN CC/565/2017 SCDRC-UT-CHD
6 One RISE P2 PARVESH KUMAR CC/962/2016 SCDRC-UT-CHD
7 One RISE P2 CHETAN MAHAJAN CC/59/2017 SCDRC-Punjab
8 One RISE P2 ANIL TARACHAND CC/622/2017 SCDRC-UT-CHD
9 One RISE P2 VIKAS MALIK CC/691/2017 SCDRC-UT-CHD
10 One RISE P2 RAKESH KUMAR GUPTA CC/540/2017 SCDRC-UT-CHD
11 One RISE P2 ARUSHI PARMAR CC/199/2017 SCDRC-UT-CHD
12 One RISE P2 GOLDY CHADHA CC/711/2017 SCDRC-UT-CHD
13 One RISE P2 RAJIV GUPTA AND ANR CC/397/2017 SCDRC-UT-CHD
14 One RISE P2 SUKHJEET SINGH CC/202/2017 SCDRC-UT-CHD
15 One RISE P2 AJAY KUMAR SONI CC/108/2018 SCDRC-UT-CHD
16 One RISE P2 Mrs. PRADEEP BRAR CC/516/2017 SCDRC-UT-CHD
17 One RISE P2 JASMEET KAUR CC/243/2017 SCDRC-UT-CHD
18 One RISE P2 RAMESH CHANDER SHARMA CC/762/2017 SCDRC-UT-CHD
19 One RISE P2 SUMEET CHADHA CC/57/2017 SCDRC-Punjab
20 One RISE P2 CHETAN MAHAJAN CC/59/2017 SCDRC-Punjab
21 One RISE P2 GAUTAM CHAWLA CC/810/2017 SCDRC-UT-CHD
22 One RISE P2 SATBIR SINGH CC/833/2017 SCDRC-UT-CHD
23 One RISE P2 BRIJINDER SINGH CC/843/2017 SCDRC-UT-CHD
24 One RISE P2 OM PRAKASH MALIK CC/56/2017 SCDRC-Punjab
25 One RISE P2 NARINDER PRAKASH CC/844/2017 SCDRC-UT-CHD
26 One RISE P2 SOURABH GHOSH CC/313/2017 SCDRC-UT-CHD
27 One RISE P2 HARAVTAR SINGH CC/311/2016 SCDRC-Punjab
28 One RISE P2 BALDEV SINGH CC/860/2017 SCDRC-UT-CHD
29 One RISE P2 Lt. Col. INDERJIT KAUR CC/364/2017 SCDRC-UT-CHD
30 One RISE P2 VISHAL KATARIYA FA/1776/2016 SCDRC-UT-CHD
31 One RISE P2 MANINDER SINGH CC/22/2018 SCDRC-UT-CHD
32 One RISE P2 RAJESH MADAN CC/372/2017 SCDRC-UT-CHD
33 One RISE P2 PARVEEN MANGLA FA/1008/2016 NCDRC, New Delhi
34 One RISE P2 OM PRAKASH CC/56/2017 SCDRC-Punjab
35 One RISE P2 HARJOT SINGH GILL CC/424/2017 SCDRC-UT-CHD
36 One RISE P2 VIKAS NIJHAVAN FA/1011/2016 NCDRC, New Delhi
37 One RISE P2 DEEPAK PANDEY CC/421/2017 SCDRC-UT-CHD
38 One RISE P2 MANPREET SINGH FA/782/2017 SCDRC-UT-CHD
39 One RISE P2 P K SHARMA CC/444/2017 SCDRC-UT-CHD
40 One RISE P2 VISHAL WADHAWA CC/601/2017 SCDRC-UT-CHD
41 One RISE P2 RAMESH KUMAR AND ANR. FA/1777/2016 NCDRC, New Delhi
42 One RISE P2 SUMIT CHADDA CC/57/2017 SCDRC-Punjab

About the Project
Project Name One City Hub (Formerly known as IREO-HUB)
Project Address Village Sukhparh and Sambalkhi , Sector 98
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140307
Project Amenities A Commercial Plotted Development . Amenities include Internal Roads , Water Supply Network ,Sewage Network ,Storm Water Drainage System , Street Lighting and Electrical Distribution System
Project Zone Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur.
Type of Project (1) Commercial (Plotted Development)
Project Status On-going Project Cost (in rupees) 382200000.00 (INR)
Project Start Date 30-Jun-2007 Proposed/ Expected Date of Project Completion as specified in Form B 31-Dec-2022
Litigation(s) related to Project Nil Mega Project (Yes/No) Yes
Specification Details of Proposed Project as per the Brochure/ Prospectus :- N/A
:- N/A
:- N/A
:- N/A
:- N/A
:- N/A
Authorized Person for Communication with regards to Project Mudit Jain
IREO Project Office , Sector 99,
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140308
E-Mail: mudit.jain[at]ireo.in Mobile Phone: 9810237279
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
Bank Name Kotak Mahindra Bank Limited Branch Name Kotak Mahindra Bank
Bank Account Number Account number omitted from this archived copy; consult the authority source. Bank IFSC Code KKBK0000173
Account Holder Name
Bank Address M 43A, Greater Kailash II , New Delhi
Central Delhi , Delhi - 110048
Project Land Details
18271.42 (in sqr mtrs)
18271.42 (in sqr mtrs) 0 (in sqr mtrs)
0 (in sqr mtrs) 0 (in sqr mtrs)
18271.42 (in sqr mtrs) 0 (in sqr mtrs)
0 (in sqr mtrs)
Project Land Khasra(s) and Area Details
SrNo Khasra Number of Land proposed to be developed Area of Land proposed under Khasra Name of Villages under Khasra Project Land Status
1 10/2 min 530.9 (in sqr mtrs) Sambhalki Owned By Promoter
2 11min 3035.1 (in sqr mtrs) Sambhalki Owned By Promoter
3 12 min 25.1 (in sqr mtrs) Sambhalki Owned By Promoter
4 19 min 1770.5 (in sqr mtrs) Sambhalki Owned By Promoter
5 020 4046.8 (in sqr mtrs) Sambhalki Owned By Promoter
6 21/1 910.5 (in sqr mtrs) Sambhalki Owned By Promoter
7 22/1 min 758.8 (in sqr mtrs) Sambhalki Owned By Promoter
8 6/2/1 1517.6 (in sqr mtrs) Sambhalki Owned By Promoter
9 6/2/2 505.9 (in sqr mtrs) Sambhalki Owned By Promoter
10 15/1 3035.1 (in sqr mtrs) Sambhalki Owned By Promoter
11 15/2 1011.7 (in sqr mtrs) Sambhalki Owned By Promoter
12 16/1 1719.9 (in sqr mtrs) Sambhalki Owned By Promoter
13 25/2 379.2 (in sqr mtrs) Sambhalki Owned By Promoter

Project Plan(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 Approved Layout Plan -- -- Open official attachment ↗
2 Approved Project Site OR Location Map -- -- Open official attachment ↗
3 Sanctioned Building Plan -- -- Open official attachment ↗
Proforma of documents to be signed with Allottees
Sr.No Document Name Reference Number Issue Date View PDF
1 Pro forma Agreement of Sale to be signed with allottees -- -- Open official attachment ↗
2 Pro forma Agreement of Sale to be signed with allottees -- -- Open official attachment ↗
3 Pro forma of Allotment Letter to be provided to allottees -- -- Open official attachment ↗
4 Pro forma of Conveyance Deed to be signed with allottees -- -- Open official attachment ↗
5 Pro forma of Conveyance Deed to be signed with allottees -- -- Open official attachment ↗
6 Pro forma of Conveyance Deed to be signed with allottees -- -- Open official attachment ↗
Project Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Architects Certificate (Form 1) -- -- Open official attachment ↗
2 Authenticated Copy of Form B -- -- Open official attachment ↗
3 CA Certificate (Form 3) -- -- Open official attachment ↗
4 Engineers Certificate (Form 2) -- -- Open official attachment ↗
Project Approvals Document(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 Amendments or revisions in sanctioned Layout/ Sanction / Building Plan Revisions (Received) 27-Mar-2018 Open official attachment ↗
2 Application for renewal of any of the NOCs/ Licenses Approvals (Received) 25-Sep-2017 Open official attachment ↗
3 Borewell Registration certificate from Central Ground Water Authority Permissions (Received) 18-Aug-2011 Open official attachment ↗
4 Commencement Certificate (Mega Project Category) -- -- Open official attachment ↗
5 Commencement Certificate (Mega Project Category) -- -- Open official attachment ↗
6 Commencement Certificate (Mega Project Category) -- -- Open official attachment ↗
7 Electric Substation NOC Approvals (Received) 08-Jul-2015 Open official attachment ↗
8 Environment Clearance certificate/ NOC Clearances (Received) 30-Nov-2012 Open official attachment ↗
9 Environment Clearance certificate/ NOC Clearances (Received) 30-Nov-2012 Open official attachment ↗
10 Pollution Clearance from Punjab Pollution Control Board Approvals (Received) 23-Apr-2018 Open official attachment ↗
11 Pollution Clearance from Punjab Pollution Control Board Approvals (Received) 23-Apr-2018 Open official attachment ↗
12 Pollution Clearance from Punjab Pollution Control Board Approvals (Received) 23-Apr-2018 Open official attachment ↗
13 Pollution Clearance from Punjab Pollution Control Board Approvals (Received) 23-Apr-2018 Open official attachment ↗
Project Land Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Details of Land Encumbrances -- -- Open official attachment ↗
2 Land Title Search Report -- -- Open official attachment ↗
3 Latest Jamabandi Document -- -- Open official attachment ↗
4 Latest Jamabandi Document -- -- Open official attachment ↗
5 Latest Jamabandi Document -- -- Open official attachment ↗
6 Legal Title Deed(s) - In case Land is owned by Promoter -- -- Open official attachment ↗
7 Non Encumbrance Certificate -- -- Open official attachment ↗
8 Project Land Khasra Report or Plan -- -- Open official attachment ↗
Project Brochure/ Prospectus Documents
Sr.No Document Name View Details
1 Advertisement and Brochure/ Prospectus Open official attachment ↗

Type of Project (One City Hub (Formerly known as IREO-HUB))
1 Commercial ( Plotted Development )
Project Building/ Tower/ Block Construction & Inventory Details
Sr.No Building/Tower/Block Name Number of Floor/Plots related to Building/ Tower/ Block
1 IREO HUB-SCO Number of Floor/Plots Currently Sanctioned: 69
Number of Floor/Plots Proposed: 69
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 SCO 69 44 100.65 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 IREO HUB-BOOTHS Number of Floor/Plots Currently Sanctioned: 10
Number of Floor/Plots Proposed: 10
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 Booths 10 0 27.45 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
Parking Details
Sr.No Type of Parking Total Area of Parking Space Total Number of Parking Space No of Parking Space Booked or Sold
1 Garages 0 (in sqr Mtrs) 0 0
2 Covered 0 (in sqr Mtrs) 0 0
3 Stilt 0 (in sqr Mtrs) 0 0
4 Basement 0 (in sqr Mtrs) 0 0
5 Open 13765 (in sqr Mtrs) 598 187
Internal Infrastructure and Facilities Details
Sr.No Internal Infrastructure Facilities Name Internal Infrastructure Facilities Details Work Progress % Percentage
1 Fire Fighting Fire Hydrants 0.00
2 Emergency Evacuation Not Applicable 0.00
3 Use for Renewable Energy Not Applicable 0.00
4 Rain Water Harvesting RWH pits to be provided 0.00
5 Street Lighting Pole Light to be provided 0.00
6 Drinking Water Water Supply Network 0.00
External Infrastructure and Facilities Details
Sr.No External Infrastructure Facilities Name Facilities Type External Infrastructure Facilities Details Work Progress %age
1 Water Supply System External Development Work (GMADA) Water Supply line, storage system and related facilities. 0.00
2 External Roads and Road System Landscaping External Development Work (PSPCL GMADA) ESS, HT Lines and related facilities. 0.00
3 External Roads and Road System Landscaping External Development Work (GMADA) SWMP at Master Plan level and related facilities. 0.00
4 Sewerage and Drainage System Self-Development Sewerage and Master Plan level STP and related facilities 45.00
5 External Roads and Road System Landscaping Self-Development External Roads and Road System Landscaping 38.00

Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
Sr.No Name of Professional Associated Consultant Type Name & Year of Establishment of Promoter Name & Profile of Key Projects Completed
1 ANMOL SOOD Contractor
A K Sood Engineers and Contractors, 1997 IREO Hamlet
Address for Official Communication H.NO 221, Sector 7 , Panchkula
Ambala , Haryana - 134109
Email: ak_0037[at]rediffmail.com Mobile/Landline Number: 9872000037
2 NILOY ROY Architect
1999 IREO Projects
Address for Official Communication Ireo Campus , Sector 59
Gurgaon , Haryana - 122005
Email: niloy.roy[at]ireo.in Mobile/Landline Number: 9717194805
3 GAURAV NEGI Real Estate Agent
PBRERA-CHD04-REA0100
Brickacres Intermediary Services Pvt Ltd., 2015 IREO Hamlet
Address for Official Communication Sector 22, Chandigarh , Chandigarh
Chandigarh , Chandigarh - 160022
Email: brickacres[at]brickacres.in Mobile/Landline Number: 8054369154
4 ONKAR SINGH Real Estate Agent
PBRERA-PTL63-REA0466
Imperial Properties, 2002 IREO Hamlet
Address for Official Communication 828, Industrial Area-B, Near Campa Cola Crossing, Link Road, , Opp. Water Tank
Ludhiana , Punjab - 141003
Email: imperialproperties18[at]gmail.com Mobile/Landline Number: 9876180881
5 ANUJ DUA Real Estate Agent
PBRERA-SAS79-REA0314
DNA Realtors, 2011 IREO Hamlet
Address for Official Communication SCO 21, MS Enclave, , Dhakoli, Zirakpur
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160104
Email: dnarealtors[at]hotmail.com Mobile/Landline Number: 9814334259
6 PARAMVEER SINGH TIWANA Real Estate Agent
PBRERA-SAS81-REA0554
Realty Matters, 2010 IREO Hamlet
Address for Official Communication SCO 9, Level-1, Madhya Marg, , Sector 26, Chandigarh
Chandigarh , Chandigarh - 160019
Email: pramveer[at]realtymatters.in Mobile/Landline Number: 9814113062

Quarterly Updates of Registered Project
Sr.No. Quarter Name Quarter Year Reference Number Reference Date View Details
1 QTR-I (January-March) 2019 QUP2019F20201040 20-Aug-2020 Open official attachment ↗
2 QTR-II (April-June) 2019 QUP2019S20201041 20-Aug-2020 Open official attachment ↗
3 QTR-III (July-September) 2019 QUP2019T20201042 20-Aug-2020 Open official attachment ↗
4 QTR-IV (October-December) 2019 QUP2019L20201043 20-Aug-2020 Open official attachment ↗
5 QTR-I (January-March) 2020 QUP2020F20201044 20-Aug-2020 Open official attachment ↗
6 QTR-I (January-March) 2018 QUP2018F20212339 23-Nov-2021 Open official attachment ↗
7 QTR-II (April-June) 2018 QUP2018S20212340 23-Nov-2021 Open official attachment ↗
8 QTR-IV (October-December) 2018 QUP2018L20212341 23-Nov-2021 Open official attachment ↗
9 QTR-III (July-September) 2020 QUP2020T20212342 23-Nov-2021 Open official attachment ↗
10 QTR-IV (October-December) 2020 QUP2020L20212343 23-Nov-2021 Open official attachment ↗
11 QTR-I (January-March) 2021 QUP2021F20212344 23-Nov-2021 Open official attachment ↗
12 QTR-III (July-September) 2021 QUP2021T20212345 23-Nov-2021 Open official attachment ↗
13 QTR-IV (October-December) 2021 QUP2021L20220815 13-Apr-2022 Open official attachment ↗
14 QTR-I (January-March) 2022 QUP2022F20220816 13-Apr-2022 Open official attachment ↗
15 QTR-II (April-June) 2022 QUP2022S20221515 15-Jul-2022 Open official attachment ↗
16 QTR-III (July-September) 2022 QUP2022T20222128 15-Oct-2022 Open official attachment ↗
17 QTR-IV (October-December) 2022 QUP2022L20230142 12-Jan-2023 Open official attachment ↗
18 QTR-I (January-March) 2023 QUP2023F20231468 15-Apr-2023 Open official attachment ↗
19 QTR-II (April-June) 2023 QUP2023S20232908 15-Jul-2023 Open official attachment ↗
20 QTR-III (July-September) 2023 QUP2023T20234123 14-Oct-2023 Open official attachment ↗
21 QTR-IV (October-December) 2023 QUP2023L20240179 15-Jan-2024 Open official attachment ↗
22 QTR-I (January-March) 2024 QUP2024F20240994 14-Apr-2024 Open official attachment ↗
23 QTR-II (April-June) 2024 QUP2024S20241935 15-Jul-2024 Open official attachment ↗
24 QTR-III (July-September) 2024 QUP2024T20242611 14-Oct-2024 Open official attachment ↗
25 QTR-IV (October-December) 2024 QUP2024L20250390 15-Jan-2025 Open official attachment ↗
26 QTR-I (January-March) 2025 QUP2025F20251348 15-Apr-2025 Open official attachment ↗
27 QTR-II (April-June) 2025 QUP2025S20252232 14-Jul-2025 Open official attachment ↗
28 QTR-III (July-September) 2025 QUP2025T20253924 15-Oct-2025 Open official attachment ↗
29 QTR-IV (October-December) 2025 QUP2025L20260247 11-Jan-2026 Open official attachment ↗
30 QTR-I (January-March) 2026 QUP2026F20261539 14-Apr-2026 Open official attachment ↗
31 QTR-II (April-June) 2026 QUP2026S20263421 14-Jul-2026 Open official attachment ↗
32 QTR-II (April-June) 2021 QUP2021S20263815 20-Jul-2026 Open official attachment ↗
33 QTR-III (July-September) 2018 QUP2018T20263816 20-Jul-2026 Open official attachment ↗
34 QTR-II (April-June) 2020 QUP2020S20263817 20-Jul-2026 Open official attachment ↗