Promoter Details (Other Than Individual)
| Omaxe New Chandigarh Developers Private Ltd. | Private Limited Company | ||
| Main Objects of Organization | Real Estate Actvities i.e. Constrcution, Development, Sale Purchase etc Civil Contractor, Colonizer, Builder | ||
| Registered Address of Organization |
10, Local Shopping Center,
,
Kalkaji
South Delhi , Delhi - 110019 |
||
| Official Address |
10 Local Shopping Center, Kalkaji
,
Kalkaji
South Delhi , Delhi - 110019 |
||
| 12 (in years) | 12 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | Chief Executive Officer | Bhupendra Singh |
B-16 Ist Floor
,
East of Kailsh
South Delhi , Delhi - 110065 Email: bhupendrasingh[at]omaxe.com |
|
| 2 | DIRECTOR | BHUPENDRA SINGH |
B-16, 1ST FLOOR EAST OF KAILASH
,
NEW DELHI
South Delhi , Delhi - 110065 Email: bhupendrasingh[at]omaxe.com |
|
| 3 | Chief Financial Officer | Serve Mitter Kamboj |
H.No. 1482
,
Ground Floor, Secto-42B
Chandigarh , Chandigarh - 160036 Email: servekamboj[at]omaxe.com |
|
| 4 | Director | Dheeraj Agrawal |
H.no 1628,gali no. 6, sanjay enclave nangla road , Faridabad , haryana ,121005
,
Faridabad , Haryana - 121005 Email: dheerajagarwal[at]omaxe.com |
|
| 5 | NON EXECUTIVE INDEPENDENT DIRECTOR | Nishal Jain |
B-22, friends colony,west , nehru nagar south delhi 110065
,
South Delhi , Delhi - 110065 Email: nishaljain[at]hotmail.com |
|
| 6 | Director | Shalini Barathi |
C-628, GF Back Portion, Near Gurudwara, New Friends Colony
,
New Delhi
New Delhi , Delhi - 110025 Email: shalinibarathi[at]omaxe.com |
|
Details of Parent Entity/ Entities (If Applicable)
| Sr.No | Name of Parent Entity | Type of Enterprise | Main Objects of Parent Entity | Registered Address |
|---|---|---|---|---|
| 1 | Omaxe Limited | Public Limited Company | Real Estate Activities i.e. Construction, Development, Sale Purchase etc. Civil Contractors, Broker, Real Estate agents, architect, designer etc. Manufacturer, Dealer of Construction Material etc. |
SHOP NO-19-B, FIRST FLOOR OMAXE CELEBRATION MALL, SOHNA ROAD
,
Gurgaon , Haryana - 122001 |
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | New Chandigarh Plots | Complete | 428970.74 | 08-Mar-2010 | 26-Feb-2012 | 10-Jun-2014 |
| 2 | OMAXE SILVER BIRCH CHANDIGARH EXTENSION | Complete | 119781.22 | 25-Apr-2010 | 11-Oct-2012 | 23-Jun-2014 |
| 3 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 34323.58 | 01-Dec-2010 | 01-Jan-2019 | 01-Jan-2019 |
| 4 | CHANDIGARH COMMERCIAL SCO | Complete | 9352.18 | 18-May-2011 | 03-Nov-2013 | 10-Jun-2014 |
| 5 | Omaxe Cassia | Complete | 48702.62 | 25-Jan-2012 | 13-Jul-2014 | 30-May-2017 |
| 6 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 55486.99 | 01-Feb-2012 | 01-Jan-2019 | 01-Jan-2019 |
| 7 | MULBERRY VILLAS CHANDIGARH | Complete | 18595.69 | 23-Jul-2012 | 14-Jan-2014 | 21-Oct-2015 |
| 8 | New Chandigarh Plots II | Complete | 61266.61 | 20-Feb-2013 | 10-Jun-2014 | 10-Jun-2014 |
| 9 | COMMERCIAL-1 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 5819.49 | 01-Mar-2014 | 31-Jul-2019 | 31-Jul-2019 |
| 10 | AMBROSIA INDEPENDENT FLOOR | Complete | 21772.85 | 26-Jul-2014 | 11-Jan-2017 | 13-Feb-2017 |
| 11 | Clockton High Street SCO Chandigarh | Complete | 6042.27 | 01-Aug-2014 | 01-Aug-2015 | 20-Feb-2017 |
| 12 | Clockton High Street Booth ChANDIGARH | Complete | 1175.77 | 01-Sep-2014 | 01-Jan-2015 | 01-Jan-2015 |
| 13 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 39418.71 | 01-Jan-2015 | 01-Jul-2020 | 01-Jul-2020 |
| 14 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 61390.3 | 01-Jan-2015 | 01-Jul-2019 | 01-Jul-2019 |
| 15 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | On-going | 11353.31 | 01-Jan-2015 | 01-Jul-2021 | 01-Jul-2021 |
| 16 | CELESTIA GRAND | Complete | 3154.96 | 10-Feb-2015 | 13-Feb-2017 | 13-Feb-2017 |
| 17 | COMMERCIAL-6 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 3358.86 | 01-Apr-2016 | 31-Jul-2019 | 31-Jul-2019 |
| 18 | COMMERCIAL-2 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 13475.92 | 01-Dec-2016 | 31-Jan-2020 | 31-Jan-2020 |
| 19 | The Resort Part A | On-going | 43215.16 | 01-Jan-2018 | 31-Jan-2023 | 31-Jan-2023 |
| 20 | The Resort Part B | On-going | 48293.39 | 01-Jan-2018 | 31-Jan-2023 | 31-Jan-2023 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | HIMANSHU SHARMA VS OMAXE LTD. | CC/785/2017 | SCDRC,PUNJAB |
| 2 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | PRIYANKA AHUJA VS OMAXE CHD. | CC/732/2017 | SCDRC,CHANDIGARH |
| 3 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | VEENA RANI and ORS. VS OMAXE CHANDIGARH EXTENSION DEVELOPERS PVT. LTD. and ANOR. | First Appeal No.1208 of 2016 | NCDRC,DELHI |
| 4 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | OMAXE CHANDIGARH EXTENSION DEVELOPERS PVT. LTD. and ORS. VS. SHEESHPAL SHARMA | FA/2374/2017 | NCDRC,NEW DELHI |
| 5 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | MS. PUNEET KOONER VS OMAXE CHD. and ORS | CC/738/2017 | SCDRC,CHANDIGARH |
| 6 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | ROHAN GOEL and ANR. VS OMAXE CHD. and ANR. | CC/771/2017 | SCDRC,CHANDIGARH |
| 7 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Col Virender Singh Vs Omaxe Chd. | CC/768/2017 | SCDRC,CHANDIGARH |
| 8 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | DEEPAK GOYAL AND ANOTHER VS ICICI BANK LTD and OTHERS OMAXE PROFORMA | CC No.826 of 2015 | DCDRF,CHANDIGARH |
| 9 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | M/S OMAXE CHANDIGARH EXTN., and ANR. VS. MR. BIRJ MOHAN AND ANR. | First Appeeal No.614/2017 | NCDRC,NEW DELHI |
| 10 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SANDEEP ALIPURIA and ANR. VS OMAXE CHD. and ANR. | CC/608/2017 | SCDRC,CHANDIGARH |
| 11 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | ANNKUR SONI VS OMAXE CHD. | CC/654/2017 | SCDRC,CHANDIGARH |
| 12 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Y.D Negi vs omaxe CHD | 76/2018 | PLA,CHANDIGARH |
| 13 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | DURGA DASS VS CREDAI and ORS. | CC/588/2017 | DCDRF,CHANDIGARH |
| 14 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Rajinder Garg Vs Omaxe Ltd. | CC/753/2017 | SCDRC,CHANDIGARH |
| 15 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Anita Goel Vs Omaxe CHD | Anita Goel Vs Omaxe CHD | PLA,Mohali |
| 16 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | M/S OMAXE CHANDIGARH EXTN., DEV. PVT. LTD. VS PANKAJ GOYAL | FA/2256/2017 | NCDRC,NEW DELHI |
| 17 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | PANKAJ GOYAL VS. M/S OMAXE CHANDIGARH EXTN. DEVELOPERS PVT. LTD. | F.A.NO.2523/2017 | NCDRC,NEW DELHI |
| 18 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SONIA SHARMA and anr. VS OMAXE CHD. | CC/634/2017 | SCDRC,CHANDIGARH |
| 19 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | OMAXE CHANDIGARH EXTN., DEV. PVT. LTD. VS. HARISH BHARDWAJ | FA/1218/2017 | NCDRC,DELHI |
| 20 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SHASHI KALA GUPTA VS. OMAXE CHANDIGARH EXTN., DEVELOPERS PVT. LTD. | FA/1281/2017 | NCDRC,NEW DELHI |
| 21 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SHASHI KALA GUPTA VS. OMAXE CHANDIGARH EXTN., DEVELOPERS PVT. LTD. | FA/1284/2017 | NCDRC,NEW DELHI |
| 22 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | SANJEEV DEWAN VS. M/S OMAXE CHANDIGARH EXTENSION DEVELOPERS LTD. | Complaint NO.76/2016 | DCDRF,Chandigarh |
| 23 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | Kanwal Preet singh Vs Omaxe Chd | 68/2018 | DCDRF,Chandigarh |
About the Project
| Project Name | CELESTIA ROYAL 2B | ||
| Project Address |
Integrated Residential Township
,
New Chandigarh
Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901 |
||
| Project Amenities | PUDA approved Project. Pollution free atmosphere with developing infrastructure. Well developed green with beautiful landscape and play area around the site. Functional club facility with big size of swimming pool, equipped gym , indoor games , banquet hall etc. Convenient shopping centre in walking distance. Sustainable design with infrastructure facilities | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Residential (Building/Tower Development) |
||
| Project Status | New Project | Project Cost (in rupees) | 340795000.00 (INR) |
| Project Start Date | 20-Jun-2023 | Proposed/ Expected Date of Project Completion as specified in Form B | 30-Apr-2028 |
| Project Web Link | www.omaxe.com | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
earthquake resistance RCC structure :- Vitrified tiles /wooden flooring :- Plastic Emulsion :- European WC, Wash Basin , Mirror, Shower :- Modular Switches ,Sockets ,Copper Wiring :- Modular Kitchen |
||
| Authorized Person for Communication with regards to Project |
Mukesh
Bhati
10, Local Shopping Center, , Kalkaji South Delhi , Delhi - 110019 E-Mail: puneetbhandari[at]omaxe.com Mobile Phone: 9815903092 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | Kotak Mahindra Bank Limited | Branch Name | Kotak Mahindraa Bank Limited Deenar Bhavan |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | KKBK0000201 |
| Account Holder Name | OmaxeNewChdDevPvtLtd CelestiaRoyal2BRERAAccount | ||
| Bank Address |
Ground Floor Shop No 1,2,3,6,6a,Basement Floor,Shop No B-1
,
Deenar Bhavan,44, Nehru Place, New Delhi
South Delhi , Delhi - 110019 |
||
Project Land Details
| 4688.238 (in sqr mtrs) | |||
| 4688.238 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 3261.927 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 1426.311 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 6//22 | 711.46 (in sqr mtrs) | Salamtpur | Owned By Promoter |
| 2 | 11//2/1 | 222.623 (in sqr mtrs) | Salamtpur | Owned By Promoter |
| 3 | 6//23 | 384.244 (in sqr mtrs) | Salamtpur | Owned By Promoter |
| 4 | 11//2/2 | 705.21 (in sqr mtrs) | Salamtpur | Owned By Promoter |
| 5 | 11//3/1 | 910.941 (in sqr mtrs) | Salamtpur | Owned By Promoter |
| 6 | 652/36 | 725.033 (in sqr mtrs) | Bharaujian | Owned By Promoter |
| 7 | 37/ | 476.107 (in sqr mtrs) | Bharanjian | Owned By Promoter |
| 8 | 11//3/2 | 553.387 (in sqr mtrs) | Salamtpur | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 3 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 4 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 5 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 6 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 7 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 8 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 9 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 10 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 11 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 12 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 13 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 14 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 15 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 16 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 17 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 18 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 19 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 20 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 21 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 22 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 23 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 24 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 3 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Legal Documents (Revised) | 05-Sep-2023 |
Open official attachment ↗
|
| 2 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 3 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 4 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 5 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 6 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 7 | Electric Substation NOC | Revisions (Applied) | 04-Sep-2023 |
Open official attachment ↗
|
| 8 | Environment Clearance certificate/ NOC | Clearances (Received) | 19-Jan-2022 |
Open official attachment ↗
|
| 9 | License as Promoter from competent Authority | Approvals (Received) | 24-Sep-2018 |
Open official attachment ↗
|
| 10 | Other Document (CLU marked ) | Legal Documents (Received) | 29-Aug-2023 |
Open official attachment ↗
|
| 11 | Other Document (Forest Clearance) | Clearances (Received) | 01-Nov-2022 |
Open official attachment ↗
|
| 12 | Other Document (list of Director ) | Revisions (Received) | 15-Dec-2023 |
Open official attachment ↗
|
| 13 | Other Document (noc WILD LIFE) | Approvals (Received) | 13-Sep-2022 |
Open official attachment ↗
|
| 14 | Other Document (PSPCL NOC) | Legal Documents (Received) | 09-Oct-2023 |
Open official attachment ↗
|
| 15 | Other Document (PSPCL) | Approvals (Received) | 05-May-2023 |
Open official attachment ↗
|
| 16 | Other Document (PSPCL) | Legal Documents (Applied) | 13-Apr-2023 |
Open official attachment ↗
|
| 17 | Pollution Clearance from Punjab Pollution Control Board | Revisions (Received) | 27-Mar-2023 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Collaboration or Joint Development Agreement | -- | -- |
Open official attachment ↗
|
| 2 | Collaboration or Joint Development Agreement | -- | -- |
Open official attachment ↗
|
| 3 | Consent details of actual owner of Land | -- | -- |
Open official attachment ↗
|
| 4 | Consent details of actual owner of Land | -- | -- |
Open official attachment ↗
|
| 5 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 6 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 7 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 8 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 9 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 10 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 11 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 12 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 13 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 14 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 15 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 16 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
| 2 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (CELESTIA ROYAL 2B)
| 1 | Residential ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 449J2 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 2 | 449J3 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 3 | 449J4 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 4 | 449J5 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 5 | 449J6 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 6 | 449J7 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 7 | 449J8 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 8 | 449J9 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 9 | 449J10 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 10 | 449J11 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 11 | 449J12 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 12 | 449J13 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 13 | 449J14 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 14 | 449J15 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 15 | 449J16 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Open | 690 (in sqr Mtrs) | 30 | 0 |
| 2 | Stilt | 2128 (in sqr Mtrs) | 76 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | Fire Fighting | 0.00 |
| 2 | Drinking Water | treated water supply from OHT | 0.00 |
| 3 | Emergency Evacuation | Road network is planned accordingly | 0.00 |
| 4 | Use for Renewable Energy | solar lighting is provided in landscape area | 0.00 |
| 5 | Rain Water Harvesting | RWH pits as per design calculation | 0.00 |
| 6 | Street Lighting | High Pole and landscape poles are planned | 0.00 |
| 7 | Hospitals | in township | 0.00 |
| 8 | Gym (Gymnasium) | in club at township | 100.00 |
| 9 | Club House | in township | 100.00 |
| 10 | Swimming pool | in club at township | 100.00 |
| 11 | Park | in township | 100.00 |
| 12 | Religious Places | in township | 0.00 |
| 13 | Schools | in township | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | Self-Development | main approach road is 200 ft, internal road 40ft matel road | 50.00 |
| 2 | Water Supply System | Self-Development | supply from existing OHT | 50.00 |
| 3 | Sewerage and Drainage System | Self-Development | sewer to running at STP at site | 50.00 |
| 4 | External Roads and Road System Landscaping | Self-Development | supply from existing ESS running at site | 50.00 |
| 5 | External Roads and Road System Landscaping | Self-Development | is proposed at site | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | APURBA BOHRA |
Architect
|
Not Applicable | omaxe limited |
| Address for Official Communication |
10, Local Shopping Center,
,
Kalkaji
South Delhi , Delhi - 110019 Email: apurbabohra[at]omaxe.com Mobile/Landline Number: 9711800064 |
|||
| 2 | TD ANEJA |
Structural Engineer
|
Not applicable | omaxe |
| Address for Official Communication |
10, Local Shopping Center,
,
Kalkaji
South Delhi , Delhi - 110019 Email: tdaneja[at]omaxe.com Mobile/Landline Number: 9711800814 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-I (January-March) | 2024 | QUP2024F20241050 | 15-Apr-2024 | Open official attachment ↗ |
| 2 | QTR-II (April-June) | 2024 | QUP2024S20241802 | 12-Jul-2024 | Open official attachment ↗ |
| 3 | QTR-III (July-September) | 2024 | QUP2024T20242659 | 14-Oct-2024 | Open official attachment ↗ |
| 4 | QTR-IV (October-December) | 2024 | QUP2024L20250146 | 08-Jan-2025 | Open official attachment ↗ |
| 5 | QTR-I (January-March) | 2025 | QUP2025F20251141 | 10-Apr-2025 | Open official attachment ↗ |
| 6 | QTR-II (April-June) | 2025 | QUP2025S20252012 | 09-Jul-2025 | Open official attachment ↗ |
| 7 | QTR-III (July-September) | 2025 | QUP2025T20253494 | 07-Oct-2025 | Open official attachment ↗ |
| 8 | QTR-IV (October-December) | 2025 | QUP2025L20260107 | 07-Jan-2026 | Open official attachment ↗ |
| 9 | QTR-I (January-March) | 2026 | QUP2026F20261472 | 13-Apr-2026 | Open official attachment ↗ |
| 10 | QTR-II (April-June) | 2026 | QUP2026S20263192 | 12-Jul-2026 | Open official attachment ↗ |
Open official attachment ↗