Promoter Details (Other Than Individual)
| Omaxe New Chandigarh Developers Private Ltd. | Private Limited Company | ||
| Main Objects of Organization | Real Estate Actvities i.e. Constrcution, Development, Sale Purchase etc Civil Contractor, Colonizer, Builder | ||
| Registered Address of Organization |
10, Local Shopping Center,
,
Kalkaji
South Delhi , Delhi - 110019 |
||
| Official Address |
10 Local Shopping Center, Kalkaji
,
Kalkaji
South Delhi , Delhi - 110019 |
||
| 12 (in years) | 12 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | Chief Executive Officer | Bhupendra Singh |
B-16 Ist Floor
,
East of Kailsh
South Delhi , Delhi - 110065 Email: bhupendrasingh[at]omaxe.com |
|
| 2 | DIRECTOR | BHUPENDRA SINGH |
B-16, 1ST FLOOR EAST OF KAILASH
,
NEW DELHI
South Delhi , Delhi - 110065 Email: bhupendrasingh[at]omaxe.com |
|
| 3 | Chief Financial Officer | Serve Mitter Kamboj |
H.No. 1482
,
Ground Floor, Secto-42B
Chandigarh , Chandigarh - 160036 Email: servekamboj[at]omaxe.com |
|
| 4 | Director | Dheeraj Agrawal |
H.no 1628,gali no. 6, sanjay enclave nangla road , Faridabad , haryana ,121005
,
Faridabad , Haryana - 121005 Email: dheerajagarwal[at]omaxe.com |
|
| 5 | NON EXECUTIVE INDEPENDENT DIRECTOR | Nishal Jain |
B-22, friends colony,west , nehru nagar south delhi 110065
,
South Delhi , Delhi - 110065 Email: nishaljain[at]hotmail.com |
|
| 6 | Director | Shalini Barathi |
C-628, GF Back Portion, Near Gurudwara, New Friends Colony
,
New Delhi
New Delhi , Delhi - 110025 Email: shalinibarathi[at]omaxe.com |
|
Details of Parent Entity/ Entities (If Applicable)
| Sr.No | Name of Parent Entity | Type of Enterprise | Main Objects of Parent Entity | Registered Address |
|---|---|---|---|---|
| 1 | Omaxe Limited | Public Limited Company | Real Estate Activities i.e. Construction, Development, Sale Purchase etc. Civil Contractors, Broker, Real Estate agents, architect, designer etc. Manufacturer, Dealer of Construction Material etc. |
SHOP NO-19-B, FIRST FLOOR OMAXE CELEBRATION MALL, SOHNA ROAD
,
Gurgaon , Haryana - 122001 |
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | New Chandigarh Plots | Complete | 428970.74 | 08-Mar-2010 | 26-Feb-2012 | 10-Jun-2014 |
| 2 | OMAXE SILVER BIRCH CHANDIGARH EXTENSION | Complete | 119781.22 | 25-Apr-2010 | 11-Oct-2012 | 23-Jun-2014 |
| 3 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 34323.58 | 01-Dec-2010 | 01-Jan-2019 | 01-Jan-2019 |
| 4 | CHANDIGARH COMMERCIAL SCO | Complete | 9352.18 | 18-May-2011 | 03-Nov-2013 | 10-Jun-2014 |
| 5 | Omaxe Cassia | Complete | 48702.62 | 25-Jan-2012 | 13-Jul-2014 | 30-May-2017 |
| 6 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 55486.99 | 01-Feb-2012 | 01-Jan-2019 | 01-Jan-2019 |
| 7 | MULBERRY VILLAS CHANDIGARH | Complete | 18595.69 | 23-Jul-2012 | 14-Jan-2014 | 21-Oct-2015 |
| 8 | New Chandigarh Plots II | Complete | 61266.61 | 20-Feb-2013 | 10-Jun-2014 | 10-Jun-2014 |
| 9 | COMMERCIAL-1 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 5819.49 | 01-Mar-2014 | 31-Jul-2019 | 31-Jul-2019 |
| 10 | AMBROSIA INDEPENDENT FLOOR | Complete | 21772.85 | 26-Jul-2014 | 11-Jan-2017 | 13-Feb-2017 |
| 11 | Clockton High Street SCO Chandigarh | Complete | 6042.27 | 01-Aug-2014 | 01-Aug-2015 | 20-Feb-2017 |
| 12 | Clockton High Street Booth ChANDIGARH | Complete | 1175.77 | 01-Sep-2014 | 01-Jan-2015 | 01-Jan-2015 |
| 13 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 39418.71 | 01-Jan-2015 | 01-Jul-2020 | 01-Jul-2020 |
| 14 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 61390.3 | 01-Jan-2015 | 01-Jul-2019 | 01-Jul-2019 |
| 15 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | On-going | 11353.31 | 01-Jan-2015 | 01-Jul-2021 | 01-Jul-2021 |
| 16 | CELESTIA GRAND | Complete | 3154.96 | 10-Feb-2015 | 13-Feb-2017 | 13-Feb-2017 |
| 17 | COMMERCIAL-6 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 3358.86 | 01-Apr-2016 | 31-Jul-2019 | 31-Jul-2019 |
| 18 | COMMERCIAL-2 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 13475.92 | 01-Dec-2016 | 31-Jan-2020 | 31-Jan-2020 |
| 19 | The Resort Part A | On-going | 43215.16 | 01-Jan-2018 | 31-Jan-2023 | 31-Jan-2023 |
| 20 | The Resort Part B | On-going | 48293.39 | 01-Jan-2018 | 31-Jan-2023 | 31-Jan-2023 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | HIMANSHU SHARMA VS OMAXE LTD. | CC/785/2017 | SCDRC,PUNJAB |
| 2 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | PRIYANKA AHUJA VS OMAXE CHD. | CC/732/2017 | SCDRC,CHANDIGARH |
| 3 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | VEENA RANI and ORS. VS OMAXE CHANDIGARH EXTENSION DEVELOPERS PVT. LTD. and ANOR. | First Appeal No.1208 of 2016 | NCDRC,DELHI |
| 4 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | OMAXE CHANDIGARH EXTENSION DEVELOPERS PVT. LTD. and ORS. VS. SHEESHPAL SHARMA | FA/2374/2017 | NCDRC,NEW DELHI |
| 5 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | MS. PUNEET KOONER VS OMAXE CHD. and ORS | CC/738/2017 | SCDRC,CHANDIGARH |
| 6 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | ROHAN GOEL and ANR. VS OMAXE CHD. and ANR. | CC/771/2017 | SCDRC,CHANDIGARH |
| 7 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Col Virender Singh Vs Omaxe Chd. | CC/768/2017 | SCDRC,CHANDIGARH |
| 8 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | DEEPAK GOYAL AND ANOTHER VS ICICI BANK LTD and OTHERS OMAXE PROFORMA | CC No.826 of 2015 | DCDRF,CHANDIGARH |
| 9 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | M/S OMAXE CHANDIGARH EXTN., and ANR. VS. MR. BIRJ MOHAN AND ANR. | First Appeeal No.614/2017 | NCDRC,NEW DELHI |
| 10 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SANDEEP ALIPURIA and ANR. VS OMAXE CHD. and ANR. | CC/608/2017 | SCDRC,CHANDIGARH |
| 11 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | ANNKUR SONI VS OMAXE CHD. | CC/654/2017 | SCDRC,CHANDIGARH |
| 12 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Y.D Negi vs omaxe CHD | 76/2018 | PLA,CHANDIGARH |
| 13 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | DURGA DASS VS CREDAI and ORS. | CC/588/2017 | DCDRF,CHANDIGARH |
| 14 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Rajinder Garg Vs Omaxe Ltd. | CC/753/2017 | SCDRC,CHANDIGARH |
| 15 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Anita Goel Vs Omaxe CHD | Anita Goel Vs Omaxe CHD | PLA,Mohali |
| 16 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | M/S OMAXE CHANDIGARH EXTN., DEV. PVT. LTD. VS PANKAJ GOYAL | FA/2256/2017 | NCDRC,NEW DELHI |
| 17 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | PANKAJ GOYAL VS. M/S OMAXE CHANDIGARH EXTN. DEVELOPERS PVT. LTD. | F.A.NO.2523/2017 | NCDRC,NEW DELHI |
| 18 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SONIA SHARMA and anr. VS OMAXE CHD. | CC/634/2017 | SCDRC,CHANDIGARH |
| 19 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | OMAXE CHANDIGARH EXTN., DEV. PVT. LTD. VS. HARISH BHARDWAJ | FA/1218/2017 | NCDRC,DELHI |
| 20 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SHASHI KALA GUPTA VS. OMAXE CHANDIGARH EXTN., DEVELOPERS PVT. LTD. | FA/1281/2017 | NCDRC,NEW DELHI |
| 21 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SHASHI KALA GUPTA VS. OMAXE CHANDIGARH EXTN., DEVELOPERS PVT. LTD. | FA/1284/2017 | NCDRC,NEW DELHI |
| 22 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | SANJEEV DEWAN VS. M/S OMAXE CHANDIGARH EXTENSION DEVELOPERS LTD. | Complaint NO.76/2016 | DCDRF,Chandigarh |
| 23 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | Kanwal Preet singh Vs Omaxe Chd | 68/2018 | DCDRF,Chandigarh |
About the Project
| Project Name | Gardenia Floors | ||
| Project Address |
Integrated Residential Township, New Chandigarh
,
District SAS Nagar (Mohali),
Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901 |
||
| Project Amenities | PUDA approved Project. Pollution free atmosphere with developing infrastructure. The project connected with 200' wide sector road and comfortable traffic circulation with internal 40' wide roads. Well developed green with beautiful landscape and play area around the site. Functional club facility with big size of swimming pool, equipped gym , indoor games , banquet hall etc. Convenient shopping centre in walking distance. Sustainable design with infrastructure facilities | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Residential (Building/Tower Development) |
||
| Project Status | New Project | Project Cost (in rupees) | 2412833700.00 (INR) |
| Project Start Date | 01-Aug-2022 | Proposed/ Expected Date of Project Completion as specified in Form B | 31-Jul-2027 |
| Project Web Link | www.omaxe.com | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
RCC Framed :- Italian Marble, Laminated Wooden Flooring ,Vitrified Tiles Flooring, Anti- Skid Tiles / Ceramic Tiles :- Plastic Emulsion :- European WC, Wash Basin , Mirror, Shower , Exhausht Fan, Geyser (20 Lt.) of Racold or equivalent :- Modular Switches ,Sockets ,Copper Wiring • Fans (Bajaj / Khaitan / Havells or equivalent :- Modular Kitchen,- Chimney and Hob,Faber or Equivalent • Water Purifier (RO),Kent or Equivalent, Geyser, Instant 3 Lt. Geyser of Racold or equivalent, Flooring, Anti – Skid Tiles / Ceramic Tiles, Dado, Tiles upto 2ft above the counter ,Wall Finishes, Plastic Emulsion ,Ceiling, OBD, Counter, Granite |
||
| Authorized Person for Communication with regards to Project |
Mukesh
Bhati
10, Local Shopping Centre , Kalkaji New Delhi , Delhi - 110019 E-Mail: punjab_rera[at]omaxe.com Mobile Phone: 9815903092 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | Kotak Mahindra Bank Limited | Branch Name | Nehru Place |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | KKBK0000201 |
| Account Holder Name | Omaxe New Chandigarh Developers Pvt Ltd | ||
| Bank Address |
GF Shop No 1-6A
,
Deenar Bhavan 44, Nehru Place
South Delhi , Delhi - 110019 |
||
Project Land Details
| 34994.12 (in sqr mtrs) | |||
| 33404.8232 (in sqr mtrs) | 1589.2968 (in sqr mtrs) | ||
| 21001.1 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 13993.02 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 34//3/1 | 1414.625 (in sqr mtrs) | Kansala | Owned By Promoter |
| 2 | 34//3 | 1414.625 (in sqr mtrs) | Kansala | Owned By Promoter |
| 3 | 34//3/1 | 1414.625 (in sqr mtrs) | Kansala | Owned By Promoter |
| 4 | 30//23 | 3009.964 (in sqr mtrs) | Kansala | Owned By Promoter |
| 5 | 30//18 | 172.133 (in sqr mtrs) | Kansala | Owned By Promoter |
| 6 | 34//4/1 | 1497.151 (in sqr mtrs) | Kansala | Owned By Promoter |
| 7 | 30//24 | 2089.946 (in sqr mtrs) | Kansala | Owned By Promoter |
| 8 | 34//5/1 | 1019.19 (in sqr mtrs) | Kansala | Owned By Promoter |
| 9 | 30//25/2 | 714.188 (in sqr mtrs) | Kansala | Owned By Promoter |
| 10 | 33//1 | 1809.566 (in sqr mtrs) | Kansala | Owned By Promoter |
| 11 | 33//10/2 | 804.164 (in sqr mtrs) | Kansala | Owned By Promoter |
| 12 | 33//2 | 642.917 (in sqr mtrs) | Kansala | Owned By Promoter |
| 13 | 33//8 | 1442.85 (in sqr mtrs) | Kansala | Owned By Promoter |
| 14 | 33//14 | 1490.596 (in sqr mtrs) | Kansala | Owned By Promoter |
| 15 | 33//7 | 27.98 (in sqr mtrs) | Kansala | Owned By Promoter |
| 16 | 33//9 | 2104.665 (in sqr mtrs) | Kansala | Owned By Promoter |
| 17 | 33//13/2 | 1352.275 (in sqr mtrs) | kansala | Owned By Promoter |
| 18 | 40//3/1 | 545.347 (in sqr mtrs) | Kansala | Owned By Promoter |
| 19 | 203/1 | 90.874 (in sqr mtrs) | Kansala | Owned By Promoter |
| 20 | 35//23/1 | 646.117 (in sqr mtrs) | Kansala | Owned By Promoter |
| 21 | 024/1 | 126.587 (in sqr mtrs) | Kansala | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 3 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 4 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 5 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 6 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 7 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 8 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 9 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 10 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 11 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 12 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 13 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 14 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 15 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 16 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 17 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 18 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 19 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 20 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 21 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 22 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 4 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 5 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 6 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
| 3 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 2 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 3 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 4 | Electric Substation NOC | Approvals (Received) | 17-Sep-2018 |
Open official attachment ↗
|
| 5 | Environment Clearance certificate/ NOC | Approvals (Received) | 19-Jan-2022 |
Open official attachment ↗
|
| 6 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 03-Aug-2022 |
Open official attachment ↗
|
| 7 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 03-Aug-2022 |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 2 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 3 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 4 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 5 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 6 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 7 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 8 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 9 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 10 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (Gardenia Floors)
| 1 | Residential ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 249E |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 2 | 249F |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 3 | 249G |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 4 | 255C |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 5 | 255D |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 6 | 357Z |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 7 | 357ZA |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 8 | 357ZB |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 9 | 357ZC |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 10 | 0411 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 11 | 0412 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 12 | 0413 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 13 | 0414 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 14 | 0415 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 15 | 0416 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 16 | 0417 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 17 | 0418 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 18 | 0419 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 19 | 0420 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 20 | 0421 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 21 | 0422 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 22 | 0423 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 23 | 0424 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 24 | 0425 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 25 | 0426 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 26 | 0427 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 27 | 0428 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 28 | 0429 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 29 | 0430 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 30 | 0431 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 31 | 0432 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 32 | 0433 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 33 | 0434 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 34 | 0435 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 35 | 0436 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 36 | 0437 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 37 | 0438 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 38 | 0440 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 39 | 0439 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 40 | 0441 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 41 | 0442 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 42 | 0443 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 43 | 0444 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 44 | 0445 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 45 | 0446 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 46 | 0447 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 47 | 0448 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 48 | 0449 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 49 | 0450 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 50 | 0451 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 51 | 0452 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 52 | 0453 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 53 | 0454 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 54 | 0455 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 55 | 0456 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 56 | 0457 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 57 | 0458 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 58 | 0459 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 59 | 0460 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 60 | 0461 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 61 | 0462 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 62 | 0463 |
Number of Floor/Plots Currently Sanctioned:
3
Number of Floor/Plots Proposed: 3 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 63 | 0464 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 64 | 0465 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 65 | 0466 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 66 | 0467 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 67 | 0468 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 68 | 0469 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 69 | 0470 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 70 | 0472 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 71 | 0471 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 72 | 0473 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 73 | 0474 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 74 | 0475 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 75 | 0476 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 76 | 0477 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 77 | 0478 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 78 | 0479 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 79 | 0480 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 80 | 0481 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 81 | 0482 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 82 | 0483 |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
| 83 | 255B |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||
|
||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Open | 3984.74 (in sqr Mtrs) | 177 | 0 |
| 2 | Covered | 13914.85 (in sqr Mtrs) | 487 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Drinking Water | Supply from WTP | 0.00 |
| 2 | Emergency Evacuation | Proper Network of road is planned | 0.00 |
| 3 | Use for Renewable Energy | Yes provided | 0.00 |
| 4 | Rain Water Harvesting | Rain water harvesting provided as per calculation | 0.00 |
| 5 | Street Lighting | yes provided | 0.00 |
| 6 | Hospitals | yes provided in master plan | 0.00 |
| 7 | Gym (Gymnasium) | yes provided in community hall | 0.00 |
| 8 | Club House | yes provided in township | 0.00 |
| 9 | Swimming pool | yes provided in community hall | 0.00 |
| 10 | Religious Places | yes provided in township | 0.00 |
| 11 | Schools | yes provided in township | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | Electricity Supply Transformer and Sub Station | External Development Work | Electricity Supply Transformer and Sub Station at different location is planned as per calculation and norms | 0.00 |
| 2 | External Roads and Road System Landscaping | External Development Work | yes planned | 0.00 |
| 3 | Sewerage and Drainage System | External Development Work | STP is provided as per calculation | 0.00 |
| 4 | Solid Waste Management and Disposal | External Development Work | provided as per calculation | 0.00 |
| 5 | Water Supply System | External Development Work | Tubewell and provision of connection from central water supply system . WTP as per calculation of population is planned | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | APURBA BORA |
Architect
CA 2013 61618 |
OMAXE NEW CHANDIGARH DEVELOPERS PRIVATE LIMITED 15 years | Silver Birch Cassia Ambrosia Mulberry Villa Plots Residential Plots Booth Plots High Street |
| Address for Official Communication |
Omaxe Ltd., 12, Local Shopping Centre,
,
Kalkaji
South Delhi , Delhi - 110019 Email: apoorbabohra[at]omaxe.com Mobile/Landline Number: 9711800064 |
|||
| 2 | TD ANEJA |
Structural Engineer
F109427 7 |
omaxe ltd. 15 years | Silver Birch Cassia Ambrosia Mulberry Villa Clockton High Street |
| Address for Official Communication |
Omaxe Ltd., 12, Local Shopping Centre,
,
Kalkaji
South Delhi , Delhi - 110019 Email: tdaneja[at]omaxe.com Mobile/Landline Number: 9711800814 |
|||
| 3 | BANSAL DEVELOPERS |
Real Estate Agent
PBRERA HRY06 REA0031 |
Not Applicable | Silver Birch Cassia Ambrosia Mulberry Villa Clockton High Street |
| Address for Official Communication |
133-P, SECTOR-1,
,
HUNA AMBALA CITY-
Ambala , Haryana - 134003 Email: bansaldevelopers[at]gmail.com Mobile/Landline Number: 9335925155 |
|||
| 4 | MANNAT EASTATE |
Real Estate Agent
PBRERA CHD04 REA0123 |
Not applicable | Silver Birch Cassia Ambrosia Mulberry Villa Clockton High Street |
| Address for Official Communication |
VILL FEROJPUR
,
TEHSIL KHARAR DISTT-MOHALI
Chandigarh , Chandigarh - 140000 Email: mannatestates[at]gmail.com Mobile/Landline Number: 9914311110 |
|||
| 5 | RE CONSULT ADVISORY SERVICES |
Real Estate Agent
PBRERA SAS79 REA0339 |
Not applicable | Silver Birch Cassia Ambrosia Mulberry Villa |
| Address for Official Communication |
SILVER OAK, 49, TOWER-B,
,
6TH FLOOR, VIP ROAD, ZIRAKPUR-(PUNJAB)
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 Email: palav[at]re-consultant.in Mobile/Landline Number: 9988091143 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-I (January-March) | 2023 | QUP2023F20231828 | 08-May-2023 | Open official attachment ↗ |
| 2 | QTR-II (April-June) | 2023 | QUP2023S20233064 | 24-Jul-2023 | Open official attachment ↗ |
| 3 | QTR-III (July-September) | 2023 | QUP2023T20234293 | 19-Oct-2023 | Open official attachment ↗ |
| 4 | QTR-IV (October-December) | 2023 | QUP2023L20240201 | 16-Jan-2024 | Open official attachment ↗ |
| 5 | QTR-I (January-March) | 2024 | QUP2024F20241235 | 02-May-2024 | Open official attachment ↗ |
| 6 | QTR-II (April-June) | 2024 | QUP2024S20241862 | 14-Jul-2024 | Open official attachment ↗ |
| 7 | QTR-III (July-September) | 2024 | QUP2024T20242661 | 14-Oct-2024 | Open official attachment ↗ |
| 8 | QTR-IV (October-December) | 2024 | QUP2024L20250170 | 09-Jan-2025 | Open official attachment ↗ |
| 9 | QTR-I (January-March) | 2025 | QUP2025F20251217 | 13-Apr-2025 | Open official attachment ↗ |
| 10 | QTR-II (April-June) | 2025 | QUP2025S20252045 | 11-Jul-2025 | Open official attachment ↗ |
| 11 | QTR-III (July-September) | 2025 | QUP2025T20253522 | 08-Oct-2025 | Open official attachment ↗ |
| 12 | QTR-IV (October-December) | 2025 | QUP2025L20260325 | 12-Jan-2026 | Open official attachment ↗ |
| 13 | QTR-I (January-March) | 2026 | QUP2026F20261272 | 09-Apr-2026 | Open official attachment ↗ |
| 14 | QTR-II (April-June) | 2026 | QUP2026S20263360 | 13-Jul-2026 | Open official attachment ↗ |
Open official attachment ↗