FLORENCE PARK PHASE 3 (T1,T2A,T2B AND 3)

PBRERA-SAS80-PR0421

Authority record captured 6 October 2026 · Readable archive prepared 6 October 2026 by Acres To Yards.

Phase 3: Towers 1, 2A, 2B and 3. Search PBRERA-SAS80-PR0421.

This is an adapted copy of the filed record, not a new certificate or confirmation of current validity. Match the phase, tower, plot or unit with the authority. Filed units and figures are reproduced as recorded.

Portal scripts and images have been removed for readable viewing. Bank account numbers, residential-address fields and personal identity attachments are omitted where identified. Original plans and project-document links remain available below; authority links may require a fresh portal session.

Open original authority record ↗

Registration does not establish current availability, completion, title clearance or a contractual possession date. Confirm later amendments and extensions with the authority.

Details of FLORENCE PARK PHASE 3(T1,T2A,T2B AND 3) (PBRERA-SAS80-PR0421)

Promoter Details (Other Than Individual)
Name of OrganizationAMBIKA REALCON PRIVATE LIMITEDType of OrganizationPrivate Limited Company
Main Objects of Organization(1) REAL ESTATE DEVELOPERS, (2) PROPERTY DEVELOPER AND PROPERTY DEVELOPERS
Registered Address of OrganizationBuilding No. 251, Glatt Building, 2nd Floor , Behind Modi Flour Mill, Okhla, Phase-III
New Delhi , Delhi - 110020
Official AddressSCO 18-19, FIRST FLOOR , SECTOR 9-D, MADHYA MARG
Chandigarh , Chandigarh - 160009
Years of Experience of Promoter in Real Estate Development in Punjab10 (in years)Years of Experience of Promoter in Real Estate Development in Other states or UTs0 (in years)
WebLink (Promoter/Parent-Entity)Not Available
Organization Member Details (If Applicable)
Sr.NoDesignationName of MemberOfficial AddressView Photograph
1DIRECTORRITESH SEHGALS/o KK SEHGAL HOUSE No 136 3rd FLOOR POCKET-1 , JASOLA NEW FRIENDS COLONY
South Delhi , Delhi - 110025
Email: riteshs[at]teamambika.com
2DIRECTORDIWAKER BANSALS/o SHYAM SUNDER BANSAL HOUSE No 128 , SECTOR 31 ADJOINING COMMUNITY CENTRE AMARNAGAR
Faridabad , Haryana - 121003
Email: diwaker[at]teamambika.com
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
Sr.NoProject NameProject StatusArea Constructed (in Sqr mtr)Project Start DateOriginal Proposed Date of CompleteActual Complete Date
1FLORENCE PARK PHASE 1Complete1878401-Oct-201630-Sep-202130-Sep-2021
2FLORENCE PARK PHASE 2Complete600001-Jun-201730-Sep-202230-Sep-2022
3FLORENCE PARK PHASE 3On-going1105025-Jan-201931-Dec-202531-Dec-2025
Litigation(s) related to Past Projects
Sr.NoProject NameCase TitleCase NumberAuthority/Forum Name where case is Pending/Resolved
1FLORENCE PARK PHASE 3MRS BHUPINDER KAUR BAWA AND SUKHWINDER BAWA vs AMBIKA REALCON PVT LTD THRU DIRGCNo04312024RERA, PUNJAB
2FLORENCE PARK PHASE 3BHUPESH RANA AND AMBHIKA RANA vs AMBIKA REALCON PVT LTDGCNo00182024RERA, PUNJAB
3FLORENCE PARK PHASE 3SH PAVEL GARG vs M/S AMBIKA REALCON PVT LTDGCNo02822024RERA, PUNJAB
4FLORENCE PARK PHASE 3M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTDGCNo02862024RERA, PUNJAB
5FLORENCE PARK PHASE 3M/s COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTDGCNo02842024RERA, PUNJAB
6FLORENCE PARK PHASE 3M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTDGCNo02832024RERA, PUNJAB
7FLORENCE PARK PHASE 3M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTDGCNo02852024RERA, PUNJAB
8FLORENCE PARK PHASE 3PAVEL GARG vs AMBIKA REALCON PVT LTDGCNo02742024RERA, PUNJAB
9FLORENCE PARK PHASE 3SH PAVEL GARG vs AMBIKA REALCON PVT LTDGCNo02732024RERA, PUNJAB
10FLORENCE PARK PHASE 3M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTDGCNo02872024RERA, PUNJAB
11FLORENCE PARK PHASE 3MRS SOFIA MASIH vs M/S AMBIKA REALCON PVT LTDGCNo04062024RERA, PUNJAB
12FLORENCE PARK PHASE 3M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTDGCNo02902024RERA, PUNJAB

About the Project
Project NameFLORENCE PARK PHASE 3(T1,T2A,T2B AND 3)
Project AddressFLORENCE PARK PHASE 3 , SECTOR 14 NEW CHANDIGARH
Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 121001
Project AmenitiesProject is located in New Chandigarh Punjab a third satellite town of UT Chandigarh apart from Mohali and Panchkula administration under Greater Mohali Area Development Authority GMADA Project Land is under Mixed Land Use Development with a front of 440 feet on VR 6 Road 200 FEET wide sector road Project Land is in the surroundings of townships already developed by DLF Omaxe and GMADA
Project ZoneZone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur.
Type of Project(1) Residential (Building/Tower Development)
Project StatusOn-goingProject Cost (in rupees)1500000000.00 (INR)
Project Start Date01-Jan-2019Proposed/ Expected Date of Project Completion as specified in Form B31-Dec-2023
Project Web Linkwww.ambikarealcon.comMega Project (Yes/No)No
Specification Details of Proposed Project as per the Brochure/ Prospectus1. Structure :- RCC EARTH QUAKE RESISTENT
2. Flooring :- MARBLE TILES AND WOODEN
3. Wall Finishing :- PLASTER AND WALL PAPERS
4. Sanitary Fittings :- THE BEST IN THE CLASS ISI MARKED
5. Electrical Fittings :- THE BEST IN THE CLASS ISI MARKED
6. Kitchen :- MODULAR
Authorized Person for Communication with regards to ProjectHARSH BHARGAV
SCO 64-65, SECOND FLOOR, , SECTOR 17 A
Chandigarh , Chandigarh - 160017
E-Mail: frontdesk[at]teamambika.com Mobile Phone: 9855128694
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
Bank NameOriental Bank of CommerceBranch NameSECTOR 17 B CHANDIGARH
Bank Account Number[Omitted from public archive; consult authority source]Bank IFSC CodeORBC0100038
Account Holder NameAMBIKA REALCON PRIVATE LIMITED PHASE III
Bank AddressSECTOR 17 B, BANK SQUARE , MAIN BRANCH
Chandigarh , Chandigarh - 160017
Project Land Details
Total Area of Land Proposed to be developed (in sqr mtrs)11050 (in sqr mtrs)
Area of Land Owned by Promoter11050 (in sqr mtrs)Area of Land Not Owned by Promoter0 (in sqr mtrs)
Area under group housing development excluding common areas and ameneties2741.736 (in sqr mtrs)Area under residential plotted development excluding common areas and ameneties0 (in sqr mtrs)
Area under commercial development excluding common areas and ameneties0 (in sqr mtrs)Area under industrial development excluding common areas and ameneties0 (in sqr mtrs)
Area under common amenties servicing the entire project8308.264 (in sqr mtrs)
Project Land Khasra(s) and Area Details
SrNoKhasra Number of Land proposed to be developedArea of Land proposed under KhasraName of Villages under KhasraProject Land Status
17//6/2(6-8), 7//5/2(2-9)1351.65 (in sqr mtrs)DHODHE MAJRAOwned By Promoter
27//5/2(2-9),7//6/1(1-12),15/2(1-10),6/2(6-8)2848.99 (in sqr mtrs)DHODHE MAJRAOwned By Promoter
310(8-0),8//1(5-12),8//9(2-6),7//5/1(5-10)4320.07 (in sqr mtrs)DHODHE MAJRAOwned By Promoter
48//1(5-12)2529.29 (in sqr mtrs)DHODHE MAJRAOwned By Promoter

Project Plan(s)
Sr.NoDocument NameReference NumberIssue DateView PDF
1Approved Layout Plan----Open official attachment ↗
2Approved Layout Plan----Open official attachment ↗
3Approved Layout Plan----Open official attachment ↗
4Approved Layout Plan----Open official attachment ↗
5Approved Layout Plan----Open official attachment ↗
6Approved Layout Plan----Open official attachment ↗
7Approved Project Site OR Location Map----Open official attachment ↗
8Sanctioned Building Plan----Open official attachment ↗
9Sanctioned Building Plan----Open official attachment ↗
10Sanctioned Building Plan----Open official attachment ↗
11Sanctioned Building Plan----Open official attachment ↗
12Sanctioned Building Plan----Open official attachment ↗
13Sanctioned Building Plan----Open official attachment ↗
14Sanctioned Building Plan----Open official attachment ↗
15Sanctioned Building Plan----Open official attachment ↗
16Sanctioned Building Plan----Open official attachment ↗
17Sanctioned Building Plan----Open official attachment ↗
Proforma of documents to be signed with Allottees
Sr.NoDocument NameReference NumberIssue DateView PDF
1Pro forma Agreement of Sale to be signed with allottees----Open official attachment ↗
2Pro forma of Allotment Letter to be provided to allottees----Open official attachment ↗
3Pro forma of Conveyance Deed to be signed with allottees----Open official attachment ↗
Project Documents
Sr.NoDocument NameReference NumberIssue DateView PDF
1Architects Certificate (Form 1)----Open official attachment ↗
2Authenticated Copy of Form B----Open official attachment ↗
3CA Certificate (Form 3)----Open official attachment ↗
4Engineers Certificate (Form 2)----Open official attachment ↗
Project Approvals Document(s)
Sr.NoDocument NameReference NumberIssue DateView PDF
1CLU Certificate----Open official attachment ↗
2Copy of Registration as Promoter----Open official attachment ↗
3Copy of Registration as Promoter----Open official attachment ↗
4Environment Clearance certificate/ NOCApprovals (Received)10-Jun-2016Open official attachment ↗
5License to develop colony or society from Competent Authority----Open official attachment ↗
6NOC from Fire Department/ Chief Fire OfficerPermissions (Received)06-Sep-2016Open official attachment ↗
Project Land Documents
Sr.NoDocument NameReference NumberIssue DateView PDF
1Collaboration or Joint Development Agreement----Open official attachment ↗
2Consent details of actual owner of Land----Open official attachment ↗
3Land Title Deed(s) - In case land is not owned by Promoter----Open official attachment ↗
4Land Title Search Report----Open official attachment ↗
5Land Title Search Report----Open official attachment ↗
6Latest Jamabandi Document----Open official attachment ↗
7Legal Title Deed(s) - In case Land is owned by Promoter----Open official attachment ↗
8Non Encumbrance Certificate----Open official attachment ↗
9Non Encumbrance Certificate----Open official attachment ↗
10Project Land Khasra Report or Plan----Open official attachment ↗
Project Brochure/ Prospectus Documents
Sr.NoDocument NameView Details
1Advertisement and Brochure/ ProspectusOpen official attachment ↗
2Advertisement and Brochure/ ProspectusOpen official attachment ↗

Type of Project (FLORENCE PARK PHASE 3(T1,T2A,T2B AND 3))
1Residential ( Building/Tower Development )
Project Building/ Tower/ Block Construction & Inventory Details
Sr.NoBuilding/Tower/Block NameNumber of Floor/Plots related to Building/ Tower/ Block
1TOWER 1Number of Floor/Plots Currently Sanctioned: 26
Number of Floor/Plots Proposed: 26
Number of Floors Constructed: 0
Sr.NoType of Apartment/ Shop/ PlotTotal Number of Apartment/ Shop/ PlotNumber of Apartment/ Shop/ Plot already soldCarpet Area of Apartment/ Shop/ PlotExclusive OpenTerrace AreaArea of the Exclusive Balcony/Verandah
14 BHK AND SERVANT260209.96 (in sqr mtrs)0 (in sqr mtrs)38.09 (in sqr mtrs)
2TOWER 2ANumber of Floor/Plots Currently Sanctioned: 64
Number of Floor/Plots Proposed: 64
Number of Floors Constructed: 0
Sr.NoType of Apartment/ Shop/ PlotTotal Number of Apartment/ Shop/ PlotNumber of Apartment/ Shop/ Plot already soldCarpet Area of Apartment/ Shop/ PlotExclusive OpenTerrace AreaArea of the Exclusive Balcony/Verandah
13 BHK AND UTILITY320111.11 (in sqr mtrs)0 (in sqr mtrs)19.51 (in sqr mtrs)
23BHK AND SERVANT320127.27 (in sqr mtrs)0 (in sqr mtrs)19.51 (in sqr mtrs)
3TOWER 2BNumber of Floor/Plots Currently Sanctioned: 64
Number of Floor/Plots Proposed: 64
Number of Floors Constructed: 0
Sr.NoType of Apartment/ Shop/ PlotTotal Number of Apartment/ Shop/ PlotNumber of Apartment/ Shop/ Plot already soldCarpet Area of Apartment/ Shop/ PlotExclusive OpenTerrace AreaArea of the Exclusive Balcony/Verandah
13BHK AND UTILITY00111.11 (in sqr mtrs)0 (in sqr mtrs)19.51 (in sqr mtrs)
23 BHK AND SERVANT640127.27 (in sqr mtrs)0 (in sqr mtrs)19.51 (in sqr mtrs)
4TOWER 3Number of Floor/Plots Currently Sanctioned: 64
Number of Floor/Plots Proposed: 64
Number of Floors Constructed: 0
Sr.NoType of Apartment/ Shop/ PlotTotal Number of Apartment/ Shop/ PlotNumber of Apartment/ Shop/ Plot already soldCarpet Area of Apartment/ Shop/ PlotExclusive OpenTerrace AreaArea of the Exclusive Balcony/Verandah
13BHK AND UTILITY320111.11 (in sqr mtrs)0 (in sqr mtrs)19.51 (in sqr mtrs)
23BHK AND SERVANT320127.27 (in sqr mtrs)0 (in sqr mtrs)19.51 (in sqr mtrs)
Parking Details
Sr.NoType of ParkingTotal Area of Parking SpaceTotal Number of Parking SpaceNo of Parking Space Booked or Sold
1Covered763 (in sqr Mtrs)2180
2Open981 (in sqr Mtrs)2180
Internal Infrastructure and Facilities Details
Sr.NoInternal Infrastructure Facilities NameInternal Infrastructure Facilities DetailsWork Progress % Percentage
1Fire FightingFIRE ALARMS, FIRE FIGHTING INSTRUMENTS, ESCAPE ROUTES IN CASE OF EMERGENCY0.00
2Drinking WaterWATER TANK AND SANITARY FITTINGS FOR UNINTERRUPTED TAP WATER IN THE UNITS0.00
3Emergency EvacuationSTAIR CASES ON BOTH SIDES OF EACH TOWER FOR EMERGENCY EVACUATION0.00
4Use for Renewable EnergySOLAR PENALS ON THE ROOF OF THE TOWERS FOR GENERATION OF COMMON ELECTRICITY0.00
5Street LightingENTIRE INTERNAL STREET AND PARK LIGHTS0.00
6HospitalsNO EXCLUSIVE FACILITY IN THE PROJECT0.00
7Gym (Gymnasium)EXCLUSIVE GYM FOR RESIDENTS OF THE PROJECT IS PROPOSED WITH ALL MODEN FACILITIES0.00
8Club HouseEXCLUSIVE CLUB WITH ALL THE MODERN FACILITIES FOR THE RESIDENTS OF THE PROJECT0.00
9Swimming poolTWO MODERN SWIMMING POOLS ARE PROPOSED FOR KIDS AND ELDERS WHO WILL BE RESIDING IN THE PROJECT0.00
10ParkA NUMBER OF PARKS INCLUDING EXCLUSIVE PARKS FOR SENIOR CITIZENS, SMALL KIDS, CRICKET PLAYING GROUND AND GENERAL PARKS0.00
11Religious PlacesNO EXCLUSIVE FACILITY IN THE PROJECT0.00
12SchoolsNO EXCLUSIVE FACILITY IN THE PROJECT0.00
13OTHER FACILITIESA BADMINTON COURT, TABLETANNIS COURT AND CLOSED CRICKET COURT ARE ALSO PROPOSED0.00
External Infrastructure and Facilities Details
Sr.NoExternal Infrastructure Facilities NameFacilities TypeExternal Infrastructure Facilities DetailsWork Progress %age
1Electricity Supply Transformer and Sub StationSelf-DevelopmentALL TRANSFORERS AND STREET LIGHTS BESIDES LIGHT PROVISION OF THE PROJECT0.00
2External Roads and Road System LandscapingSelf-Developmentexternal roads and road system0.00
3Sewerage and Drainage SystemSelf-Developmentsewrage and drainage0.00
4Solid Waste Management and DisposalSelf-Developmentsolid waste management0.00
5Water Supply SystemSelf-Developmentwater system0.00
6External Roads and Road System LandscapingSelf-DevelopmentEXTERNAL ROADS AND ROAD SYSTEMS0.00

Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
Sr.NoName of ProfessionalAssociated Consultant TypeName & Year of Establishment of PromoterName & Profile of Key Projects Completed
1TANGIBLE INCReal Estate Agent
PBRERA-SAS81-REA0010
2018FLORENCE PARK
Address for Official CommunicationR - 107 , PHASE 8 B, SECTOR 74
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160074
Email: tangible.inc[at]gmail.com Mobile/Landline Number: 8288870786
2K DESIGN SH RAKESH SHARMAArchitect
1995FLORENCE PARK
Address for Official Communication206-208, 2ND FLOOR, , 99 EMPIRE PLAZA, SULTANPUR
Central Delhi , Delhi - 110030
Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9711800082
3AKB PROJECTS PRIVATE LIMITEDStructural Engineer
1998FLORENCE PARK
Address for Official CommunicationHOUSE NO 394-395, , SECTOR 40, URBAN ESTATE
Gurgaon , Haryana - 122003
Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9910070550
4A R ENTERPRISESContractor
1990FLORENCE PARK
Address for Official CommunicationHOUSE NO 460 - B, , N K FIRST INDRAPURAM
Ghaziabad , Uttar Pradesh - 201001
Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9582796924

Quarterly Updates of Registered Project
Sr.No.Quarter NameQuarter YearReference NumberReference DateView Details
1QTR-I (January-March)2019QUP2019F2022185902-Sep-2022Open official attachment ↗
2QTR-II (April-June)2019QUP2019S2022186002-Sep-2022Open official attachment ↗
3QTR-III (July-September)2019QUP2019T2022186102-Sep-2022Open official attachment ↗
4QTR-IV (October-December)2019QUP2019L2022186202-Sep-2022Open official attachment ↗
5QTR-I (January-March)2020QUP2020F2022186302-Sep-2022Open official attachment ↗
6QTR-II (April-June)2020QUP2020S2022186402-Sep-2022Open official attachment ↗
7QTR-III (July-September)2020QUP2020T2022186502-Sep-2022Open official attachment ↗
8QTR-IV (October-December)2020QUP2020L2022186602-Sep-2022Open official attachment ↗
9QTR-I (January-March)2021QUP2021F2022186802-Sep-2022Open official attachment ↗
10QTR-II (April-June)2021QUP2021S2022186902-Sep-2022Open official attachment ↗
11QTR-III (July-September)2021QUP2021T2022187002-Sep-2022Open official attachment ↗
12QTR-IV (October-December)2021QUP2021L2022187102-Sep-2022Open official attachment ↗
13QTR-I (January-March)2022QUP2022F2022187202-Sep-2022Open official attachment ↗
14QTR-II (April-June)2022QUP2022S2022187302-Sep-2022Open official attachment ↗
15QTR-III (July-September)2022QUP2022T2022254019-Dec-2022Open official attachment ↗
16QTR-IV (October-December)2022QUP2022L2023060227-Jan-2023Open official attachment ↗
17QTR-I (January-March)2023QUP2023F2023172201-May-2023Open official attachment ↗
18QTR-II (April-June)2023QUP2023S2023301321-Jul-2023Open official attachment ↗
19QTR-III (July-September)2023QUP2023T2023407812-Oct-2023Open official attachment ↗
20QTR-IV (October-December)2023QUP2023L2024008910-Jan-2024Open official attachment ↗
21QTR-I (January-March)2024QUP2024F2024089609-Apr-2024Open official attachment ↗
22QTR-II (April-June)2024QUP2024S2024188715-Jul-2024Open official attachment ↗
23QTR-III (July-September)2024QUP2024T2024241104-Oct-2024Open official attachment ↗
24QTR-IV (October-December)2024QUP2024L2025043115-Jan-2025Open official attachment ↗
25QTR-I (January-March)2025QUP2025F2025104307-Apr-2025Open official attachment ↗
26QTR-II (April-June)2025QUP2025S2025231815-Jul-2025Open official attachment ↗
27QTR-III (July-September)2025QUP2025T2025383114-Oct-2025Open official attachment ↗
28QTR-IV (October-December)2025QUP2025L2026057816-Jan-2026Open official attachment ↗
29QTR-I (January-March)2026QUP2026F2026130310-Apr-2026Open official attachment ↗
30QTR-II (April-June)2026QUP2026S2026325713-Jul-2026Open official attachment ↗