Promoter Details (Other Than Individual)
| Omaxe New Chandigarh Developers Private Ltd. | Private Limited Company | ||
| Main Objects of Organization | Real Estate Actvities i.e. Constrcution, Development, Sale Purchase etc Civil Contractor, Colonizer, Builder | ||
| Registered Address of Organization |
10, Local Shopping Center,
,
Kalkaji
South Delhi , Delhi - 110019 |
||
| Official Address |
10 Local Shopping Center, Kalkaji
,
Kalkaji
South Delhi , Delhi - 110019 |
||
| 12 (in years) | 12 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | Chief Executive Officer | Bhupendra Singh |
B-16 Ist Floor
,
East of Kailsh
South Delhi , Delhi - 110065 Email: bhupendrasingh[at]omaxe.com |
|
| 2 | DIRECTOR | BHUPENDRA SINGH |
B-16, 1ST FLOOR EAST OF KAILASH
,
NEW DELHI
South Delhi , Delhi - 110065 Email: bhupendrasingh[at]omaxe.com |
|
| 3 | Chief Financial Officer | Serve Mitter Kamboj |
H.No. 1482
,
Ground Floor, Secto-42B
Chandigarh , Chandigarh - 160036 Email: servekamboj[at]omaxe.com |
|
| 4 | Director | Dheeraj Agrawal |
H.no 1628,gali no. 6, sanjay enclave nangla road , Faridabad , haryana ,121005
,
Faridabad , Haryana - 121005 Email: dheerajagarwal[at]omaxe.com |
|
| 5 | NON EXECUTIVE INDEPENDENT DIRECTOR | Nishal Jain |
B-22, friends colony,west , nehru nagar south delhi 110065
,
South Delhi , Delhi - 110065 Email: nishaljain[at]hotmail.com |
|
| 6 | Director | Shalini Barathi |
C-628, GF Back Portion, Near Gurudwara, New Friends Colony
,
New Delhi
New Delhi , Delhi - 110025 Email: shalinibarathi[at]omaxe.com |
|
Details of Parent Entity/ Entities (If Applicable)
| Sr.No | Name of Parent Entity | Type of Enterprise | Main Objects of Parent Entity | Registered Address |
|---|---|---|---|---|
| 1 | Omaxe Limited | Public Limited Company | Real Estate Activities i.e. Construction, Development, Sale Purchase etc. Civil Contractors, Broker, Real Estate agents, architect, designer etc. Manufacturer, Dealer of Construction Material etc. |
SHOP NO-19-B, FIRST FLOOR OMAXE CELEBRATION MALL, SOHNA ROAD
,
Gurgaon , Haryana - 122001 |
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | New Chandigarh Plots | Complete | 428970.74 | 08-Mar-2010 | 26-Feb-2012 | 10-Jun-2014 |
| 2 | OMAXE SILVER BIRCH CHANDIGARH EXTENSION | Complete | 119781.22 | 25-Apr-2010 | 11-Oct-2012 | 23-Jun-2014 |
| 3 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 34323.58 | 01-Dec-2010 | 01-Jan-2019 | 01-Jan-2019 |
| 4 | CHANDIGARH COMMERCIAL SCO | Complete | 9352.18 | 18-May-2011 | 03-Nov-2013 | 10-Jun-2014 |
| 5 | Omaxe Cassia | Complete | 48702.62 | 25-Jan-2012 | 13-Jul-2014 | 30-May-2017 |
| 6 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 55486.99 | 01-Feb-2012 | 01-Jan-2019 | 01-Jan-2019 |
| 7 | MULBERRY VILLAS CHANDIGARH | Complete | 18595.69 | 23-Jul-2012 | 14-Jan-2014 | 21-Oct-2015 |
| 8 | New Chandigarh Plots II | Complete | 61266.61 | 20-Feb-2013 | 10-Jun-2014 | 10-Jun-2014 |
| 9 | COMMERCIAL-1 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 5819.49 | 01-Mar-2014 | 31-Jul-2019 | 31-Jul-2019 |
| 10 | AMBROSIA INDEPENDENT FLOOR | Complete | 21772.85 | 26-Jul-2014 | 11-Jan-2017 | 13-Feb-2017 |
| 11 | Clockton High Street SCO Chandigarh | Complete | 6042.27 | 01-Aug-2014 | 01-Aug-2015 | 20-Feb-2017 |
| 12 | Clockton High Street Booth ChANDIGARH | Complete | 1175.77 | 01-Sep-2014 | 01-Jan-2015 | 01-Jan-2015 |
| 13 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 39418.71 | 01-Jan-2015 | 01-Jul-2020 | 01-Jul-2020 |
| 14 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | On-going | 61390.3 | 01-Jan-2015 | 01-Jul-2019 | 01-Jul-2019 |
| 15 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | On-going | 11353.31 | 01-Jan-2015 | 01-Jul-2021 | 01-Jul-2021 |
| 16 | CELESTIA GRAND | Complete | 3154.96 | 10-Feb-2015 | 13-Feb-2017 | 13-Feb-2017 |
| 17 | COMMERCIAL-6 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 3358.86 | 01-Apr-2016 | 31-Jul-2019 | 31-Jul-2019 |
| 18 | COMMERCIAL-2 OF MEGA RESIDENTIAL PROJECT AT MULLANPUR | On-going | 13475.92 | 01-Dec-2016 | 31-Jan-2020 | 31-Jan-2020 |
| 19 | The Resort Part A | On-going | 43215.16 | 01-Jan-2018 | 31-Jan-2023 | 31-Jan-2023 |
| 20 | The Resort Part B | On-going | 48293.39 | 01-Jan-2018 | 31-Jan-2023 | 31-Jan-2023 |
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | HIMANSHU SHARMA VS OMAXE LTD. | CC/785/2017 | SCDRC,PUNJAB |
| 2 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | PRIYANKA AHUJA VS OMAXE CHD. | CC/732/2017 | SCDRC,CHANDIGARH |
| 3 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | VEENA RANI and ORS. VS OMAXE CHANDIGARH EXTENSION DEVELOPERS PVT. LTD. and ANOR. | First Appeal No.1208 of 2016 | NCDRC,DELHI |
| 4 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | OMAXE CHANDIGARH EXTENSION DEVELOPERS PVT. LTD. and ORS. VS. SHEESHPAL SHARMA | FA/2374/2017 | NCDRC,NEW DELHI |
| 5 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | MS. PUNEET KOONER VS OMAXE CHD. and ORS | CC/738/2017 | SCDRC,CHANDIGARH |
| 6 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | ROHAN GOEL and ANR. VS OMAXE CHD. and ANR. | CC/771/2017 | SCDRC,CHANDIGARH |
| 7 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Col Virender Singh Vs Omaxe Chd. | CC/768/2017 | SCDRC,CHANDIGARH |
| 8 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | DEEPAK GOYAL AND ANOTHER VS ICICI BANK LTD and OTHERS OMAXE PROFORMA | CC No.826 of 2015 | DCDRF,CHANDIGARH |
| 9 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | M/S OMAXE CHANDIGARH EXTN., and ANR. VS. MR. BIRJ MOHAN AND ANR. | First Appeeal No.614/2017 | NCDRC,NEW DELHI |
| 10 | PHASE-2 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SANDEEP ALIPURIA and ANR. VS OMAXE CHD. and ANR. | CC/608/2017 | SCDRC,CHANDIGARH |
| 11 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | ANNKUR SONI VS OMAXE CHD. | CC/654/2017 | SCDRC,CHANDIGARH |
| 12 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Y.D Negi vs omaxe CHD | 76/2018 | PLA,CHANDIGARH |
| 13 | PHASE-3 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | DURGA DASS VS CREDAI and ORS. | CC/588/2017 | DCDRF,CHANDIGARH |
| 14 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Rajinder Garg Vs Omaxe Ltd. | CC/753/2017 | SCDRC,CHANDIGARH |
| 15 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | Anita Goel Vs Omaxe CHD | Anita Goel Vs Omaxe CHD | PLA,Mohali |
| 16 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | M/S OMAXE CHANDIGARH EXTN., DEV. PVT. LTD. VS PANKAJ GOYAL | FA/2256/2017 | NCDRC,NEW DELHI |
| 17 | PHASE-4 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | PANKAJ GOYAL VS. M/S OMAXE CHANDIGARH EXTN. DEVELOPERS PVT. LTD. | F.A.NO.2523/2017 | NCDRC,NEW DELHI |
| 18 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SONIA SHARMA and anr. VS OMAXE CHD. | CC/634/2017 | SCDRC,CHANDIGARH |
| 19 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | OMAXE CHANDIGARH EXTN., DEV. PVT. LTD. VS. HARISH BHARDWAJ | FA/1218/2017 | NCDRC,DELHI |
| 20 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SHASHI KALA GUPTA VS. OMAXE CHANDIGARH EXTN., DEVELOPERS PVT. LTD. | FA/1281/2017 | NCDRC,NEW DELHI |
| 21 | PHASE-5 DEVELOPMENT OF MEGA RESIDENTIAL PROJECT | SHASHI KALA GUPTA VS. OMAXE CHANDIGARH EXTN., DEVELOPERS PVT. LTD. | FA/1284/2017 | NCDRC,NEW DELHI |
| 22 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | SANJEEV DEWAN VS. M/S OMAXE CHANDIGARH EXTENSION DEVELOPERS LTD. | Complaint NO.76/2016 | DCDRF,Chandigarh |
| 23 | THE LAKE GROUP HOUSING PROJECT PART OF MEGA RESEDENTIAL PROJECT | Kanwal Preet singh Vs Omaxe Chd | 68/2018 | DCDRF,Chandigarh |
About the Project
| Project Name | The Lake Phase-3 | ||
| Project Address |
Omaxe New Chandigarh
,
Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901 |
||
| Project Amenities | Club, Commercial With kids Play Area, Jogging and Cycle Track, Meditation, Health Club, Basket Ball Tennis Court | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Commercial (Building/Tower Development) (2) Residential (Building/Tower Development) |
||
| Project Status | New Project | Project Cost (in rupees) | 275400000.00 (INR) |
| Project Start Date | 01-Oct-2021 | Proposed/ Expected Date of Project Completion as specified in Form B | 30-Sep-2024 |
| Project Web Link | omaxe.com | Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
RCC FRAMED STRUCTURE (Earthquake Resistance) :- The Lake Commercial - Shop GF, FF, SF (50mm thick IPS Flooring), Corridor (Marble/Tile Finish), Staircase & Lift Lobby (Granite) The Lake Floors - Living/Dinning/Family Room (Italianshade matching vertified tiles), Bed Rooms (Vitrified Tile), Toilets (Anti-Skid/Ceramic Tiles), Kitchen (Anti-skid Tiles/Ceramic Tiles) :- The Lake Commercial - Corridor (Granite Cladding upto 4 ft to 5 ft height only/Paint, Staircase (OBD Paint), Lift Lobby (Granite cladding around door opening/ OBD paint) The Lake Floors - Living/Dinning/Family Room/Bedroom/Kitchen/Staircase (Plastic Emulsion Paint), Servant Room (OBD Paint), Balcony (Water proofing external paint :- The Lake Floors - European WC, Wash Basin & CP fittings :- The Lake Commercial - Only DB shall be provided inside the shop and further distribution shall be done by the client at his own cost. The Lake Floors - Modular Switches, Sockets, Copper Wiring, Ceiling Fans :- The Lake Floors - Modular Kitchen Laminated Finish, Chimney, Hob, Water Purifier (RO), Instant 3 Lt Geyser, Tiles upto 2ft above the counter, Granite Counter with double bowl stainless steel sink with drain board. |
||
| Authorized Person for Communication with regards to Project |
Mukesh
Bhati
Omaxe India Trade Tower, First Floor, Chd-Siswan Road, , New Chandigarh, District SAS Nagar (Mohali) Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901 E-Mail: mukeshbhati[at]omaxe.com Mobile Phone: 9815903092 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | HDFC Bank Limited | Branch Name | kalkaji, Nehru enclave, delhi |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | HDFC0000271 |
| Account Holder Name | Omaxe New Chandigarh Developers Pvt.Ltd. | ||
| Bank Address |
kalkaji, Nehru enclave,
,
New Delhi
New Delhi , Delhi - 110019 |
||
Project Land Details
| 5410.69 (in sqr mtrs) | |||
| 0 (in sqr mtrs) | 5410.69 (in sqr mtrs) | ||
| 3174.82 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 1253.23 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 982.64 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 111min | 17.962 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 2 | 092 | 262.378 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 3 | 074 | 364.648 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 4 | 075 | 136.173 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 5 | 092 | 49.048 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 6 | 093 | 620.098 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 7 | 086 | 34.575 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 8 | 087 | 549.518 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 9 | 127/1 | 573 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 10 | 127/2 | 573 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 11 | 614/112/1 | 415.88 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 12 | 614/112/2 | 415.88 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 13 | 615/112 | 415.88 (in sqr mtrs) | Bharonjiyan | Owned By Promoter |
| 14 | 209 | 629.99 (in sqr mtrs) | Bharounjia | Owned By Promoter |
| 15 | 135 | 251.69 (in sqr mtrs) | Bharounjia | Owned By Promoter |
| 16 | 136 | 100.96 (in sqr mtrs) | Bharounjia | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 3 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 4 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 5 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 6 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 7 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 8 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 9 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 4 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 2 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 3 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 4 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 5 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 6 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 7 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
| 8 | Commencement Certificate (Mega Project Category) | -- | -- |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Details of Encumbrances over the land | -- | -- |
Open official attachment ↗
|
| 2 | Details of Encumbrances over the land | -- | -- |
Open official attachment ↗
|
| 3 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 4 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 5 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 6 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 7 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 8 | Non Encumbrance Certificate | -- | -- |
Open official attachment ↗
|
| 9 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|
Type of Project (The Lake Phase-3)
| 1 | Commercial ( Building/Tower Development ) |
| 2 | Residential ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | THE LAKE COMMERCIAL |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2 | THE LAKE VILLAS |
Number of Floor/Plots Currently Sanctioned:
4
Number of Floor/Plots Proposed: 4 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 3 | THE LAKE FLOORS |
Number of Floor/Plots Currently Sanctioned:
3
Number of Floor/Plots Proposed: 3 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 4 | LAKE FLOORS -F 6 |
Number of Floor/Plots Currently Sanctioned:
6
Number of Floor/Plots Proposed: 6 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 5 | LAKE FLOORS -F 7 |
Number of Floor/Plots Currently Sanctioned:
6
Number of Floor/Plots Proposed: 6 Number of Floors Constructed: 0 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Open | 1012 (in sqr Mtrs) | 44 | 0 |
| 2 | Basement | 1184 (in sqr Mtrs) | 37 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | As per NBC | 0.00 |
| 2 | Drinking Water | Treated drinking water supply from UGT | 0.00 |
| 3 | Emergency Evacuation | As per NBC | 0.00 |
| 4 | Use for Renewable Energy | Provided | 0.00 |
| 5 | Rain Water Harvesting | Provided as per Calculation | 0.00 |
| 6 | Street Lighting | Provided | 0.00 |
| 7 | Hospitals | In the Master Plan | 0.00 |
| 8 | Gym (Gymnasium) | In Club | 0.00 |
| 9 | Park | Provided | 0.00 |
| 10 | Religious Places | In the Master Plan | 0.00 |
| 11 | Schools | In the Master Plan | 0.00 |
| 12 | Swimming pool | Provided | 0.00 |
| 13 | Club House | Provided | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | External Development Work | 100 and 200 feet external Matel Road | 50.00 |
| 2 | Water Supply System | External Development Work | sector level water supply up to UGT and further connected to water tank of individual tower for supply | 0.00 |
| 3 | Sewerage and Drainage System | External Development Work | treated in STP and further connected to sector level sewer | 0.00 |
| 4 | Solid Waste Management and Disposal | External Development Work | provision on site | 50.00 |
| 5 | Electricity Supply Transformer and Sub Station | External Development Work | Connection of electrical HT supply from PSPCL and further connected to site ESS and distributed to individual units | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | APURBA BOHRA |
Architect
CA 2013 61618 |
omaxe new chandigrah pvt ltd 15 year | Silver Birch Cassia Ambrosia Mulberry Villa Plots Residential SCO Plots Commercial |
| Address for Official Communication |
Omaxe Ltd., 12,Local Shopping Centre,
,
Kalkaji,
South Delhi , Delhi - 110019 Email: apoorbabohra[at]omaxe.com Mobile/Landline Number: 9711800064 |
|||
| 2 | T D ANEJA |
Structural Engineer
F109427-7 |
omaxe new chandigarh pvt ltd 15 years | Silver Birch Cassia Ambrosia Mulberry Villa Villa Plots Residential SCO Plots Commercial Booth |
| Address for Official Communication |
Omaxe Ltd., 12, Local Shopping Centre
,
kalkaji new delhi
South Delhi , Delhi - 110019 Email: tdaneja[at]omaxe.com Mobile/Landline Number: 9711800814 |
|||
| 3 | BANSAL DEVELOPERS |
Real Estate Agent
PBRERA-HRY06-REA0031 |
Not applicable | Not applicable |
| Address for Official Communication |
133-P, SECTOR-1
,
HUNA AMBALA CITY
Chandigarh , Chandigarh - 134003 Email: bansaldevelopers[at]gmail.com Mobile/Landline Number: 9335925155 |
|||
| 4 | APEX REALTY SOLUTIONS |
Real Estate Agent
PBRERA-SAS79-REA0220 |
Not applicable | not applicable |
| Address for Official Communication |
SCO 28, Second Floor,
,
Sector 27 C,
Chandigarh , Chandigarh - 160019 Email: apexrealtysolutions[at]gmail.com Mobile/Landline Number: 9216925999 |
|||
| 5 | MANNAT EASTATE |
Real Estate Agent
PBRERA-CHD04-REA0123 |
not applicable | not applicable |
| Address for Official Communication |
VILL FEROJPUR
,
TEHSIL KHARAR DISTT-MOHALI
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055 Email: mannatestates[at]gmail.com Mobile/Landline Number: 9914311110 |
|||
| 6 | RE CONSULT ADVISORY SERVICES |
Real Estate Agent
PBRERA-SAS79-REA0339 |
not applicable | not applicable |
| Address for Official Communication |
SILVER OAK, 49,
,
TOWER-B, 6TH FLOOR, VIP ROAD, ZIRAKPUR-140603(PUNJAB)
Patiala , Punjab - 140603 Email: palav[at]re-consultant.in Mobile/Landline Number: 9988091143 |
|||
| 7 | CHAUDHARY PROPERTIES |
Real Estate Agent
PBRERA-SAS79-REA0314 |
not applicable | not applicable |
| Address for Official Communication |
SCO-21, MS ENCLAVE,
,
OLD PANCHKULA-AMBALA HIGHWAY, DHAKOLI, ZIRAKPUR, MOHALI-PUNJAB -160055
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055 Email: dnarealtors[at]hotmail.com Mobile/Landline Number: 9855504259 |
|||
| 8 | BANSAL DEVELOPERS |
Real Estate Agent
PBRERA-HRY06-REA0031 |
Not applicable | Not applicable |
| Address for Official Communication |
133-P, SECTOR-1,
,
HUNA AMBALA CITY-
Chandigarh , Chandigarh - 134003 Email: bansaldevelopers[at]gmail.com Mobile/Landline Number: 9335925155 |
|||
| 9 | APEX REALTY SOLUTIONS |
Real Estate Agent
PBRERA-SAS79-REA0220 |
Not applicable | Not applicable |
| Address for Official Communication |
SCO 28, Second Floor,
,
Sector 27 C,
Chandigarh , Chandigarh - 160019 Email: apexrealtysolutions[at]gmail.com Mobile/Landline Number: 9216925999 |
|||
| 10 | MANNAT EASTATE |
Real Estate Agent
PBRERA-CHD04-REA0123 |
not applicable | not applicable |
| Address for Official Communication |
VILL FEROJPUR
,
TEHSIL KHARAR DISTT-MOHALI
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160055 Email: mannatestates[at]gmail.com Mobile/Landline Number: 9914311110 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-IV (October-December) | 2021 | QUP2021L20220477 | 18-Feb-2022 | Open official attachment ↗ |
| 2 | QTR-I (January-March) | 2022 | QUP2022F20220930 | 25-Apr-2022 | Open official attachment ↗ |
| 3 | QTR-II (April-June) | 2022 | QUP2022S20221620 | 27-Jul-2022 | Open official attachment ↗ |
| 4 | QTR-III (July-September) | 2022 | QUP2022T20222219 | 03-Nov-2022 | Open official attachment ↗ |
| 5 | QTR-IV (October-December) | 2022 | QUP2022L20230372 | 20-Jan-2023 | Open official attachment ↗ |
| 6 | QTR-I (January-March) | 2023 | QUP2023F20231804 | 06-May-2023 | Open official attachment ↗ |
| 7 | QTR-II (April-June) | 2023 | QUP2023S20233063 | 24-Jul-2023 | Open official attachment ↗ |
| 8 | QTR-III (July-September) | 2023 | QUP2023T20234308 | 19-Oct-2023 | Open official attachment ↗ |
| 9 | QTR-IV (October-December) | 2023 | QUP2023L20240319 | 20-Jan-2024 | Open official attachment ↗ |
| 10 | QTR-I (January-March) | 2024 | QUP2024F20241234 | 02-May-2024 | Open official attachment ↗ |
| 11 | QTR-II (April-June) | 2024 | QUP2024S20241861 | 14-Jul-2024 | Open official attachment ↗ |
| 12 | QTR-III (July-September) | 2024 | QUP2024T20242758 | 15-Oct-2024 | Open official attachment ↗ |
| 13 | QTR-IV (October-December) | 2024 | QUP2024L20250208 | 10-Jan-2025 | Open official attachment ↗ |
| 14 | QTR-I (January-March) | 2025 | QUP2025F20251223 | 14-Apr-2025 | Open official attachment ↗ |
| 15 | QTR-II (April-June) | 2025 | QUP2025S20252188 | 14-Jul-2025 | Open official attachment ↗ |
| 16 | QTR-III (July-September) | 2025 | QUP2025T20253734 | 13-Oct-2025 | Open official attachment ↗ |
| 17 | QTR-IV (October-December) | 2025 | QUP2025L20260275 | 12-Jan-2026 | Open official attachment ↗ |
| 18 | QTR-I (January-March) | 2026 | QUP2026F20261541 | 14-Apr-2026 | Open official attachment ↗ |
| 19 | QTR-II (April-June) | 2026 | QUP2026S20263396 | 14-Jul-2026 | Open official attachment ↗ |
Open official attachment ↗