Promoter Details (Other Than Individual)
| Name of Organization | AMBIKA REALCON PRIVATE LIMITED | Type of Organization | Private Limited Company |
| Main Objects of Organization | (1) REAL ESTATE DEVELOPERS, (2) PROPERTY DEVELOPER AND PROPERTY DEVELOPERS | ||
| Registered Address of Organization | Building No. 251, Glatt Building, 2nd Floor , Behind Modi Flour Mill, Okhla, Phase-III New Delhi , Delhi - 110020 | ||
| Official Address | SCO 18-19, FIRST FLOOR , SECTOR 9-D, MADHYA MARG Chandigarh , Chandigarh - 160009 | ||
| Years of Experience of Promoter in Real Estate Development in Punjab | 10 (in years) | Years of Experience of Promoter in Real Estate Development in Other states or UTs | 0 (in years) |
| WebLink (Promoter/Parent-Entity) | Not Available |
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | DIRECTOR | RITESH SEHGAL | S/o KK SEHGAL HOUSE No 136 3rd FLOOR POCKET-1 , JASOLA NEW FRIENDS COLONY South Delhi , Delhi - 110025 Email: riteshs[at]teamambika.com | |
| 2 | DIRECTOR | DIWAKER BANSAL | S/o SHYAM SUNDER BANSAL HOUSE No 128 , SECTOR 31 ADJOINING COMMUNITY CENTRE AMARNAGAR Faridabad , Haryana - 121003 Email: diwaker[at]teamambika.com |
| Sr.No | Project Name | Project Status | Area Constructed (in Sqr mtr) | Project Start Date | Original Proposed Date of Complete | Actual Complete Date |
|---|---|---|---|---|---|---|
| 1 | FLORENCE PARK PHASE 1 | Complete | 18784 | 01-Oct-2016 | 30-Sep-2021 | 30-Sep-2021 |
| 2 | FLORENCE PARK PHASE 2 | Complete | 6000 | 01-Jun-2017 | 30-Sep-2022 | 30-Sep-2022 |
| 3 | FLORENCE PARK PHASE 3 | On-going | 11050 | 25-Jan-2019 | 31-Dec-2025 | 31-Dec-2025 |
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| 1 | FLORENCE PARK PHASE 3 | MRS BHUPINDER KAUR BAWA AND SUKHWINDER BAWA vs AMBIKA REALCON PVT LTD THRU DIR | GCNo04312024 | RERA, PUNJAB |
| 2 | FLORENCE PARK PHASE 3 | BHUPESH RANA AND AMBHIKA RANA vs AMBIKA REALCON PVT LTD | GCNo00182024 | RERA, PUNJAB |
| 3 | FLORENCE PARK PHASE 3 | SH PAVEL GARG vs M/S AMBIKA REALCON PVT LTD | GCNo02822024 | RERA, PUNJAB |
| 4 | FLORENCE PARK PHASE 3 | M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTD | GCNo02862024 | RERA, PUNJAB |
| 5 | FLORENCE PARK PHASE 3 | M/s COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTD | GCNo02842024 | RERA, PUNJAB |
| 6 | FLORENCE PARK PHASE 3 | M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTD | GCNo02832024 | RERA, PUNJAB |
| 7 | FLORENCE PARK PHASE 3 | M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTD | GCNo02852024 | RERA, PUNJAB |
| 8 | FLORENCE PARK PHASE 3 | PAVEL GARG vs AMBIKA REALCON PVT LTD | GCNo02742024 | RERA, PUNJAB |
| 9 | FLORENCE PARK PHASE 3 | SH PAVEL GARG vs AMBIKA REALCON PVT LTD | GCNo02732024 | RERA, PUNJAB |
| 10 | FLORENCE PARK PHASE 3 | M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTD | GCNo02872024 | RERA, PUNJAB |
| 11 | FLORENCE PARK PHASE 3 | MRS SOFIA MASIH vs M/S AMBIKA REALCON PVT LTD | GCNo04062024 | RERA, PUNJAB |
| 12 | FLORENCE PARK PHASE 3 | M/S COMBITIC GLOBAL CAPLET PVT LTD vs M/S AMBIKA REALCON PVT LTD | GCNo02902024 | RERA, PUNJAB |
About the Project
| Project Name | FLORENCE PARK PHASE IV | ||
| Project Address | FLORENCE PARK PHASE IV , SECTOR 14 NEW CHANDIGARH Mohali , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 121001 | ||
| Project Amenities | Project is located i on the border of Chandigarh, Baddi and kharar ropar on Airport Road. It is a commercial project constituting SCO and Booths. The construction quality is world class. | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project | (1) Commercial (Building/Tower Development) | ||
| Project Status | New Project | Project Cost (in rupees) | 162350100.00 (INR) |
| Project Start Date | 01-Mar-2023 | Proposed/ Expected Date of Project Completion as specified in Form B | 31-Dec-2026 |
| Project Web Link | www.ambikarealcon.com | Mega Project (Yes/No) | No |
| Specification Details of Proposed Project as per the Brochure/ Prospectus | 1. Structure :- RCC, MASONARY WALLS, MARBLE /TILES FLOOR ETC 2. Flooring :- MARBLED / TILES FLOORING 3. Wall Finishing :- PLASTERED WALLS 4. Sanitary Fittings :- ISI MARKED QUALITY SANITARY FITTINGS 5. Electrical Fittings :- CONCEALED WALLED ELECTRICAL FITTINGS OF ISI MARK 6. Kitchen :- NOT APPLICABLE | ||
| Authorized Person for Communication with regards to Project | HARSH BHARGAV SCO18-19 FIRST FLOOR , SECTOR 9 D Chandigarh , Chandigarh - 160009 E-Mail: frontdesk[at]teamambika.com Mobile Phone: 9855128694 |
| Bank Name | Punjab National Bank | Branch Name | PNB, Sector 17, Chandigarh |
| Bank Account Number | [Omitted from public archive; consult authority source] | Bank IFSC Code | PUNB0008700 |
| Account Holder Name | Ambika Realcon Pvt. Ltd. | ||
| Bank Address | Sector 17 B, Main Branch, , Chandigarh Chandigarh , Chandigarh - 160017 |
| Total Area of Land Proposed to be developed (in sqr mtrs) | 7660 (in sqr mtrs) | ||
| Area of Land Owned by Promoter | 7230.02 (in sqr mtrs) | Area of Land Not Owned by Promoter | 429.98 (in sqr mtrs) |
| Area under group housing development excluding common areas and ameneties | 376 (in sqr mtrs) | Area under residential plotted development excluding common areas and ameneties | 0 (in sqr mtrs) |
| Area under commercial development excluding common areas and ameneties | 2109.936 (in sqr mtrs) | Area under industrial development excluding common areas and ameneties | 0 (in sqr mtrs) |
| Area under common amenties servicing the entire project | 5174.064 (in sqr mtrs) |
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 4//25/2,25/1,4//24/1,24/2,24/3,60/1,7//17/1/1,16/1 | 7230.1 (in sqr mtrs) | DHODHE MAJRA | Owned By Promoter |
| 2 | 4//25/1 (4-13) vide Sale Deed 2803 dated 05022015 | 429.9 (in sqr mtrs) | Dhodhe Majra | Not Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 2 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 3 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 4 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 5 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 6 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 7 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 8 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 9 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 10 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 11 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 12 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 13 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 14 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 15 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 16 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 17 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 18 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 19 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 20 | Approved Layout Plan | -- | -- | Open official attachment ↗ |
| 21 | Approved Project Site OR Location Map | -- | -- | Open official attachment ↗ |
| 22 | Approved Project Site OR Location Map | -- | -- | Open official attachment ↗ |
| 23 | Approved Project Site OR Location Map | -- | -- | Open official attachment ↗ |
| 24 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 25 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 26 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 27 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 28 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 29 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 30 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 31 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 32 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 33 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 34 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 35 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 36 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 37 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 38 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 39 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 40 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 41 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 42 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 43 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 44 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 45 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 46 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 47 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 48 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 49 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| 50 | Sanctioned Building Plan | -- | -- | Open official attachment ↗ |
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- | Open official attachment ↗ |
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- | Open official attachment ↗ |
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- | Open official attachment ↗ |
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- | Open official attachment ↗ |
| 2 | CA Certificate (Form 3) | -- | -- | Open official attachment ↗ |
| 3 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- | Open official attachment ↗ |
| 4 | Proforma for Undertaking- cum-Indemnity Bond | -- | -- | Open official attachment ↗ |
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Permissions (Received) | 27-Jan-2022 | Open official attachment ↗ |
| 2 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Clearances (Received) | 11-Feb-2022 | Open official attachment ↗ |
| 3 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Permissions (Received) | 27-Jan-2022 | Open official attachment ↗ |
| 4 | Amendments or revisions in sanctioned Layout/ Sanction / Building Plan | Permissions (Received) | 28-Feb-2023 | Open official attachment ↗ |
| 5 | Amendments or revisions in sanctioned Layout/ Sanction / Building Plan | Revisions (Revised) | 10-Apr-2023 | Open official attachment ↗ |
| 6 | Amendments or revisions in sanctioned Layout/ Sanction / Building Plan | Permissions (Received) | 19-Apr-2023 | Open official attachment ↗ |
| 7 | Application for renewal of any of the NOCs/ Licenses | Permissions (Received) | 31-May-2022 | Open official attachment ↗ |
| 8 | Borewell Registration certificate from Central Ground Water Authority | Permissions (Applied) | 08-Jun-2022 | Open official attachment ↗ |
| 9 | CLU Certificate | -- | -- | Open official attachment ↗ |
| 10 | CLU Certificate | -- | -- | Open official attachment ↗ |
| 11 | Copy of Registration as Promoter | -- | -- | Open official attachment ↗ |
| 12 | Electric Substation NOC | Permissions (Received) | 13-May-2024 | Open official attachment ↗ |
| 13 | Environment Clearance certificate/ NOC | Approvals (Received) | 14-Feb-2024 | Open official attachment ↗ |
| 14 | Environment Clearance certificate/ NOC | Permissions (Received) | 31-May-2022 | Open official attachment ↗ |
| 15 | Environment Clearance certificate/ NOC | Approvals (Received) | 16-Jun-2023 | Open official attachment ↗ |
| 16 | Environment Clearance certificate/ NOC | Approvals (Received) | 09-Feb-2022 | Open official attachment ↗ |
| 17 | License as Promoter from competent Authority | Permissions (Received) | 28-Apr-2025 | Open official attachment ↗ |
| 18 | License as Promoter from competent Authority | Permissions (Received) | 24-Sep-2019 | Open official attachment ↗ |
| 19 | License as Promoter from competent Authority | Approvals (Received) | 18-Dec-2019 | Open official attachment ↗ |
| 20 | License to develop colony or society from Competent Authority | -- | -- | Open official attachment ↗ |
| 21 | License to develop colony or society from Competent Authority | -- | -- | Open official attachment ↗ |
| 22 | License to develop colony or society from Competent Authority | -- | -- | Open official attachment ↗ |
| 23 | License to develop colony or society from Competent Authority | -- | -- | Open official attachment ↗ |
| 24 | NOC from Fire Department/ Chief Fire Officer | Permissions (Applied) | 14-May-2025 | Open official attachment ↗ |
| 25 | Other Document (Access to Roads) | Permissions (Applied) | 09-May-2025 | Open official attachment ↗ |
| 26 | Other Document (Affidavit cum Undertaking reg open parking use ) | Legal Documents (Received) | 14-May-2025 | Open official attachment ↗ |
| 27 | Other Document (Affidavit reg submission of NOCs) | Legal Documents (Received) | 15-May-2025 | Open official attachment ↗ |
| 28 | Other Document (Affidavit reg Villa Status) | Legal Documents (Received) | 15-May-2025 | Open official attachment ↗ |
| 29 | Other Document (Bank Certificate for Phase 4 RERA Accounts) | Clearances (Received) | 25-Apr-2025 | Open official attachment ↗ |
| 30 | Other Document (Clarification on Khasra No 60 1) | Legal Documents (Revised) | 20-Jul-2023 | Open official attachment ↗ |
| 31 | Other Document (Clarification on Sanctioned Building Plan of Group) | Clearances (Applied) | 10-Apr-2023 | Open official attachment ↗ |
| 32 | Other Document (Declaration to submit remaining NOCs) | Legal Documents (Applied) | 12-May-2025 | Open official attachment ↗ |
| 33 | Other Document (Drainage NOC for 10.65 Acres) | Permissions (Received) | 08-Jun-2022 | Open official attachment ↗ |
| 34 | Other Document (Explanatory Letter to RERA Observations 16082023) | Revisions (Revised) | 03-Sep-2023 | Open official attachment ↗ |
| 35 | Other Document (Forest Deptt NOC 10.65 Acres) | Clearances (Received) | 31-May-2022 | Open official attachment ↗ |
| 36 | Other Document (Land map with Land details Pt No. 15) | Legal Documents (Received) | 10-Apr-2023 | Open official attachment ↗ |
| 37 | Other Document (Passport and Adhaar of Directors) | Legal Documents (Received) | 25-Sep-2015 | [Identity attachment omitted; consult authority source] |
| 38 | Other Document (Promoter License Extension and Bank Acc Cert) | Permissions (Received) | 28-Apr-2025 | Open official attachment ↗ |
| 39 | Other Document (Reply to Observation dated 14.05.2025) | Revisions (Applied) | 14-May-2025 | Open official attachment ↗ |
| 40 | Other Document (RERA Submission Diary No 4401 dated 21072023) | Legal Documents (Received) | 21-Jul-2023 | Open official attachment ↗ |
| 41 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 17-Feb-2025 | Open official attachment ↗ |
| 42 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 17-Feb-2025 | Open official attachment ↗ |
| 43 | Pollution Clearance from Punjab Pollution Control Board | Approvals (Received) | 03-Feb-2025 | Open official attachment ↗ |
| 44 | Pollution Clearance from Punjab Pollution Control Board | Revisions (Received) | 21-Mar-2024 | Open official attachment ↗ |
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 2 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 3 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 4 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 5 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 6 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 7 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 8 | Land Title Search Report | -- | -- | Open official attachment ↗ |
| 9 | Latest Jamabandi Document | -- | -- | Open official attachment ↗ |
| 10 | Latest Jamabandi Document | -- | -- | Open official attachment ↗ |
| 11 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- | Open official attachment ↗ |
| 12 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- | Open official attachment ↗ |
| 13 | Non Encumbrance Certificate | -- | -- | Open official attachment ↗ |
| 14 | Non Encumbrance Certificate | -- | -- | Open official attachment ↗ |
| 15 | Non Encumbrance Certificate | -- | -- | Open official attachment ↗ |
| 16 | Project Land Khasra Report or Plan | -- | -- | Open official attachment ↗ |
| 17 | Project Land Khasra Report or Plan | -- | -- | Open official attachment ↗ |
| 18 | Project Land Khasra Report or Plan | -- | -- | Open official attachment ↗ |
| 19 | Project Land Khasra Report or Plan | -- | -- | Open official attachment ↗ |
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus | Open official attachment ↗ |
| 2 | Advertisement and Brochure/ Prospectus | Open official attachment ↗ |
Type of Project (FLORENCE PARK PHASE IV)
| 1 | Commercial ( Building/Tower Development ) |
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | BLOCK1 BOOTH 1-8 | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 | |||||||||||||
| |||||||||||||||
| 2 | BLOCK2 SCO BASEMENT GFPLUS3 1-8 | Number of Floor/Plots Currently Sanctioned: 5 Number of Floor/Plots Proposed: 5 Number of Floors Constructed: 0 | |||||||||||||
| |||||||||||||||
| 3 | BLOCK 3 SCO BASEMENT GFPLUS3 9-17 | Number of Floor/Plots Currently Sanctioned: 5 Number of Floor/Plots Proposed: 5 Number of Floors Constructed: 0 | |||||||||||||
| |||||||||||||||
| 4 | VILLA GPLUS2 | Number of Floor/Plots Currently Sanctioned: 3 Number of Floor/Plots Proposed: 3 Number of Floors Constructed: 0 | |||||||||||||
|
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Basement | 3133.22 (in sqr Mtrs) | 97 | 0 |
| 2 | Open | 1182.947 (in sqr Mtrs) | 51 | 0 |
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | FIRE ALARMS SMOKE DETECTORS AND FIRE ESCAPE WILL BE PROVIDED | 0.00 |
| 2 | Drinking Water | PROVISION WILL BE PROVIDED | 0.00 |
| 3 | Emergency Evacuation | WILL BE PROVIDED FOR | 0.00 |
| 4 | Use for Renewable Energy | WILL BE DONE FOR PROJECT AS A WHOLE | 0.00 |
| 5 | Rain Water Harvesting | PROVISIONING TO BE DONE | 0.00 |
| 6 | Street Lighting | WILL BE PROVIDED | 0.00 |
| 7 | Park | FOR THE PROJECT | 0.00 |
| 8 | Gym (Gymnasium) | FOR THE PROJECT AS A WHOLE | 0.00 |
| 9 | Swimming pool | FOR THE PROJECT AS A WHOLE S.T. CONDITIONS | 0.00 |
| 10 | Club House | FOR THE PROJECT AS A WHOLE S.T. CONDITIONS | 0.00 |
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | Self-Development | WITHIN THE PROJECT BY THE DEVELOPER AND OUTSIDE BY THE GMADA | 0.00 |
| 2 | Water Supply System | Self-Development | WITHIN THE PROJECT BY THE DEVELOPER OUTSIDE BY THE LOCAL AUTHORITIES | 0.00 |
| 3 | Sewerage and Drainage System | Self-Development | WITHIN THE PROJECT BY THE DEVELOPERS | 0.00 |
| 4 | Electricity Supply Transformer and Sub Station | External Development Work (PSEB) | WITHIN PROJECT BY THE DEVELOPER AND OUTSIDE BY AUTHORITY | 0.00 |
| 5 | Solid Waste Management and Disposal | Self-Development | WITHIN THE PROJECT BY THE DEVELOPER AND OUTSIDE BY THE LOCAL AUTHORITY | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | K DESIGN SH RAKESH SHARMA | Architect | 1995 | FLORENCE PARK |
| Address for Official Communication | 206-208, 2ND FLOOR, , 99 EMPIRE PLAZA, SULTANPUR Central Delhi , Delhi - 110030 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9711800082 | |||
| 2 | A R ENTERPRISES | Contractor | 1990 | FLORENCE PARK |
| Address for Official Communication | HOUSE NO 460 - B, , N K FIRST INDRAPURAM Ghaziabad , Uttar Pradesh - 201001 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9582796924 | |||
| 3 | BALJEET SINGH | Real Estate Agent PBRERA-SAS81-REA0433 | 2017 | FLORENCE PARK |
| Address for Official Communication | HOUSE NO 1744 , PHASE 3B2 Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160069 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 7527000919 | |||
| 4 | TANGIBLE INC | Real Estate Agent PBRERA-SAS81-REA0010 | 2018 | FLORENCE PARK |
| Address for Official Communication | R - 107 , PHASE 8 B, SECTOR 74 Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160074 Email: tangible.inc[at]gmail.com Mobile/Landline Number: 8288870786 | |||
| 5 | DALIP KUMAR MAHAPATRA | Real Estate Agent PBRERA-SAS79-REA0568 | 2018 | FLORENCE PARK |
| Address for Official Communication | FLAT NO 5 - A , ANGEL APARTMENTS Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 120101 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9814600467 | |||
| 6 | AKB PROJECTS PRIVATE LIMITED | Structural Engineer | 1998 | FLORENCE PARK |
| Address for Official Communication | HOUSE NO 394-395, , SECTOR 40, URBAN ESTATE Gurgaon , Haryana - 122003 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9910070550 | |||
| 7 | AMAN ARYA | Real Estate Agent PBRERA-SAS79-REA0643 | 2017 | FLORENCE PARK |
| Address for Official Communication | HOUSE NO 217 MAMTA ENCLAVE , DHAKOLI ZIRAKPUR Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 7527000915 | |||
| 8 | TRILOK SINGH | Real Estate Agent PBRERA-CHD04-REA0052 | 2018 | FLORENCE PARK |
| Address for Official Communication | HOUSE NO 2449 , 2ND FLOOR SECTOR 37 C Chandigarh , Chandigarh - 160036 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 7527000920 | |||
| 9 | GROW MORE REALITY SOLUTIONS | Real Estate Agent PBRERA-SAS81-REA0060 | 2018 | FLORENCE PARK |
| Address for Official Communication | SCF 60 , PHASE 10 Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160059 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9988290230 | |||
| 10 | USHA RANI | Real Estate Agent PBRERA-HRY06-REA0099 | 2018 | FLORENCE PARK |
| Address for Official Communication | HOUSE NO 16 , SECTOR 15 Panchkula , Haryana - 134113 Email: frontdesk[at]teamambika.com Mobile/Landline Number: 9815639436 |
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-II (April-June) | 2025 | QUP2025S20252366 | 15-Jul-2025 | Open official attachment ↗ |
| 2 | QTR-III (July-September) | 2025 | QUP2025T20253838 | 14-Oct-2025 | Open official attachment ↗ |
| 3 | QTR-IV (October-December) | 2025 | QUP2025L20260579 | 16-Jan-2026 | Open official attachment ↗ |
| 4 | QTR-I (January-March) | 2026 | QUP2026F20261304 | 10-Apr-2026 | Open official attachment ↗ |
| 5 | QTR-II (April-June) | 2026 | QUP2026S20263259 | 13-Jul-2026 | Open official attachment ↗ |