Sushma Crescent

PBRERA-SAS79-PR0084

Authority record captured 16 September 2026 · Readable archive prepared 24 September 2026 by Acres To Yards.

This is the filed record for the project and registration shown here. Match the selected phase, tower, plot or unit to this record; it does not establish approval of other similarly named projects or components.

Presentation has been adapted for readable viewing. Portal scripts have been removed and bank account numbers omitted. Filed information has not been refreshed since capture; confirm subsequent amendments and extensions with the authority.

Open original authority record ↗

Registration and filed dates do not establish current availability, completion, title clearance or a contractual possession date.


Promoter Details (Other Than Individual)
Sushma Buildtech Limited Public Limited Company
Main Objects of Organization Builders, Developer, Coloniser, Real estate Development
Registered Address of Organization B-107, First Floor, , Business Complex at Elante Mall, Industrial Area - 1
Chandigarh , Chandigarh - 160002
Official Address B-107, First Floor, , Business Complex at Elante Mall, Industrial Area - 1
Chandigarh , Chandigarh - 160002
10 (in years) 0 (in years)
WebLink (Promoter/Parent-Entity) Not Available
Organization Member Details (If Applicable)
Sr.No Designation Name of Member Official Address View Photograph
1 Director Bharat Mittal B-107, First Floor, , Business Complex at Elante Mall, Industrial Area - 1
Chandigarh , Chandigarh - 160002
Email: bharat[at]sushmabuildtech.com
2 Managing Director Binder Pal Mittal B-107, First Floor, , Business Complex at Elante Mall, Industrial Area - 1
Chandigarh , Chandigarh - 160002
Email: binderpal[at]sushmabuildtech.com
3 Director Pardeep Kumar B-107, First Floor, , Business Complex at Elante Mall, Industrial Area - 1
Chandigarh , Chandigarh - 160002
Email: pardeep[at]sushmabuildtech.com
4 Executive Director Prateek Mittal B-107, First Floor, , Business Complex at Elante Mall, Industrial Area - 1
Chandigarh , Chandigarh - 160002
Email: prateek[at]sushmabuildtech.com
Details and Profile of On-Going and Completed Projects in Past Five Years or since Inception
Sr.No Project Name Project Status Area Constructed (in Sqr mtr) Project Start Date Original Proposed Date of Complete Actual Complete Date
1 Sushma Urban Views Complete 23977.69 22-Jun-2010 22-Jun-2015 29-Aug-2014
2 Sushma Elite Cross Complete 56691.45 27-Jun-2011 27-Jun-2016 27-Jun-2016
3 Sushma Green Vista Complete 22676.58 28-Jul-2011 28-Jul-2016 27-Jan-2016
4 Sushma Chandigarh Grande On-going 112871.74 11-Jan-2012 26-Jul-2022 26-Jul-2022
5 Sushma Infinium On-going 65427.5 20-Jan-2012 26-Jul-2022 26-Jul-2022
6 Sushma Homework On-going 11152.416 19-Feb-2015 26-Jul-2018 26-Jul-2018
7 Sushma Crescent On-going 126486.98 09-Sep-2016 26-Jul-2022 26-Jul-2022
Litigation(s) related to Past Projects
Sr.No Project Name Case Title Case Number Authority/Forum Name where case is Pending/Resolved
1 Sushma Chandigarh Grande Manjul Sabharwal CC/574/2017 State Consumer Disputes Redressal Commission Chandigarh
2 Sushma Chandigarh Grande Naresh Kumar Talwar and another CC/796/2017 State Consumer Disputes Redressal Commission Chandigarh
3 Sushma Chandigarh Grande Shweta Lamba and another CC/728/2017 State Consumer Disputes Redressal Commission Chandigarh
4 Sushma Chandigarh Grande Anil Lamba CC/727/2017 State Consumer Disputes Redressal Commission Chandigarh
5 Sushma Chandigarh Grande Chandani CC/88/2018 State Consumer Disputes Redressal Commission Chandigarh
6 Sushma Chandigarh Grande Suman Gupta and another vs. Sushma Buildtech Limited AO No. 22 of 2018 RERA Punjab
7 Sushma Chandigarh Grande Punam Sharda CC/3202/2017 National Consumer Disputes Redressal Commission New Delhi
8 Sushma Chandigarh Grande Priti Kohli CC/324/2018 National Consumer Disputes Redressal Commission New Delhi
9 Sushma Chandigarh Grande Sumit Kumar Gupta and another CC/745/2018 National Consumer Disputes Redressal Commission New Delhi
10 Sushma Chandigarh Grande Deepak Dutt CC/394/2018 National Consumer Disputes Redressal Commission New Delhi
11 Sushma Crescent Ambika Khullar vs Sushma Buildtech Limited CC No. 72 of 2018 RERA Punjab
12 Sushma Elite Cross Rubal Kaur Sarai CC/361/2018 National Consumer Disputes Redressal Commission New Delhi
13 Sushma Green Vista Meenu Yadav FA/1955/2017 National Consumer Disputes Redressal Commission New Delhi
14 Sushma Green Vista Ms Namarata CC/874/2017 District Forum - 1, Chandigarh
15 Sushma Green Vista Raminder Singh Sodhi CS/739/2016 Judicial Courts Dera Bassi
16 Sushma Infinium Dr. Sachin Gupta, Dr. Shaveta Gupta CC/780/2017 State Consumer Disputes Redressal Commission Chandigarh
17 Sushma Infinium Mrs. Sarla CC/621/2017 State Consumer Disputes Redressal Commission Chandigarh
18 Sushma Urban Views Manmohan Krishan Verma CC/1002/2017 State Consumer Disputes Redressal Commission Punjab

About the Project
Project Name Sushma Crescent
Project Address Village Gazipur - Kishanpura , Sushma Square, Dhakoli, Zirakpur
Dera Bassi , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603
Project Amenities Unobstructed Accessibility from K Area Zirakpur Dhakoli Road, Club House, Gym Facility, Landscaped Parks, Lighting inside the project premises, Power Back Up, Security, STP.
Project Zone Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur.
Type of Project (1) Residential (Building/Tower Development)
Project Status On-going Project Cost (in rupees) --
Project Start Date 09-Sep-2016 Proposed/ Expected Date of Project Completion as specified in Form B 29-Jul-2022
Litigation(s) related to Project Yes Mega Project (Yes/No) No
Specification Details of Proposed Project as per the Brochure/ Prospectus :- RCC Framed Structure
:- Vitrified Tiles / Ceramic Tiles / Anti Skid Tiles
:- Oil Bound Distemper
:- Branded Sanitary Fixtures
:- Modular
:- Double Bowl SS Sink and Granite Counter Top
Authorized Person for Communication with regards to Project Bhupinder Singh Bedi
B-107, First Floor, , Business Complex at Elante Mall, Industrial Area - 1`
Chandigarh , Chandigarh - 160002
E-Mail: bhupinder[at]sushmabuildtech.com Mobile Phone: 9872889933
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
Bank Name ICICI Bank Limited Branch Name Churchgate Branch
Bank Account Number Account number omitted from this archived copy; consult the authority source. Bank IFSC Code ICIC0000393
Account Holder Name
Bank Address 122, Mistry Bhavan , Dinshaw Vachha Road, Churchgate,
Mumbai , Maharashtra - 400020
Litigation(s) Related to Project (If Any) Details
Sr No Case Title Case Number Name of Authority/Forum where Case Pending/Resolved
1 Ambika Khullar vs Sushma Buildtech Limited CC No. 72 of 2018 RERA Punjab
Project Land Details
41719.0429 (in sqr mtrs)
23328 (in sqr mtrs) 18409.918 (in sqr mtrs)
8530.909 (in sqr mtrs) 0 (in sqr mtrs)
0 (in sqr mtrs) 0 (in sqr mtrs)
33207.009 (in sqr mtrs)
Project Land Khasra(s) and Area Details
SrNo Khasra Number of Land proposed to be developed Area of Land proposed under Khasra Name of Villages under Khasra Project Land Status
1 18, 23, 13, 18, 25, 16, 14, 17, 24, 314-113, 333 23328 (in sqr mtrs) Village Gazipur and KIshanpura Owned By Promoter
2 99, 321, 100, 101, 102, 103 and 333 18395 (in sqr mtrs) Kishanpura Not Owned By Promoter

Project Plan(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 Approved Layout Plan -- -- Open official attachment ↗
2 Approved Project Site OR Location Map -- -- Open official attachment ↗
3 Approved Sanctioned Plan -- -- Open official attachment ↗
Proforma of documents to be signed with Allottees
Sr.No Document Name Reference Number Issue Date View PDF
1 Pro forma Agreement of Sale -- -- Open official attachment ↗
2 Pro forma of Allotment Letter -- -- Open official attachment ↗
3 Pro forma of Conveyance Deed -- -- Open official attachment ↗
Project Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Architects Certificate (Form 1) -- -- Open official attachment ↗
2 Authenticated Copy of Form B -- -- Open official attachment ↗
3 CA Certificate (Form 3) -- -- Open official attachment ↗
4 Engineers Certificate (Form 2) -- -- Open official attachment ↗
Project Approvals Document(s)
Sr.No Document Name Reference Number Issue Date View PDF
1 AAI Height NOC from Civil Aviation Department/ Airport Authority Permissions (Received) 21-Sep-2015 Open official attachment ↗
2 Building Permit Issue from Municipal Authority Permissions (Received) 09-Sep-2016 Open official attachment ↗
3 CLU Certificate -- -- Open official attachment ↗
4 Completion/ Phase Completion certificate from Municipal/ Competent Authority Permissions (Received) 15-Dec-2017 Open official attachment ↗
5 Copy of Registration as Promoter -- -- Open official attachment ↗
6 Electric Substation NOC Clearances (Received) 22-Nov-2017 Open official attachment ↗
7 Environment Clearance certificate/ NOC Clearances (Received) 25-May-2016 Open official attachment ↗
8 License as Promoter from competent Authority Approvals (Received) 10-Aug-2017 Open official attachment ↗
9 License to develop colony or society from Competent Authority -- -- Open official attachment ↗
10 NOC from Fire Department/ Chief Fire Officer Approvals (Received) 24-Nov-2017 Open official attachment ↗
11 Pollution Clearance from Punjab Pollution Control Board Approvals (Received) 14-Aug-2012 Open official attachment ↗
Project Land Documents
Sr.No Document Name Reference Number Issue Date View PDF
1 Collaboration or Development Agreement -- -- Open official attachment ↗
2 Collaboration or Joint Development Agreement -- -- Open official attachment ↗
3 Consent details of actual owner of Land -- -- Open official attachment ↗
4 Copies of such title and other documents -- -- Open official attachment ↗
5 Details of Land Encumbrances -- -- Open official attachment ↗
6 Land Title Search Report -- -- Open official attachment ↗
7 Latest Jamabandi Document -- -- Open official attachment ↗
8 Legal Title Deed(s) - In case Land is owned by Promoter -- -- Open official attachment ↗
9 Project Land Khasra Report or Plan -- -- Open official attachment ↗
Project Brochure/ Prospectus Documents
Sr.No Document Name View Details
1 Building/ Tower/ Block Construction Open official attachment ↗

Type of Project (Sushma Crescent)
1 Residential ( Building/Tower Development )
Project Building/ Tower/ Block Construction & Inventory Details
Sr.No Building/Tower/Block Name Number of Floor/Plots related to Building/ Tower/ Block
1 TOWER - A Number of Floor/Plots Currently Sanctioned: 12
Number of Floor/Plots Proposed: 12
Number of Floors Constructed: 12
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 4BHK 24 22 130.01 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 TOWER - B Number of Floor/Plots Currently Sanctioned: 11
Number of Floor/Plots Proposed: 11
Number of Floors Constructed: 11
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 36 36 105.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 3BHK 4 4 122.68 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
3 TOWER - C Number of Floor/Plots Currently Sanctioned: 12
Number of Floor/Plots Proposed: 12
Number of Floors Constructed: 12
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 40 40 92.16 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 3BHK 4 3 119.12 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
4 TOWER - D Number of Floor/Plots Currently Sanctioned: 11
Number of Floor/Plots Proposed: 11
Number of Floors Constructed: 11
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 36 36 105.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 3BHK 4 4 122.68 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
5 TOWER - E Number of Floor/Plots Currently Sanctioned: 11
Number of Floor/Plots Proposed: 11
Number of Floors Constructed: 11
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 36 36 105.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 3BHK 4 4 122.68 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
6 TOWER - F Number of Floor/Plots Currently Sanctioned: 11
Number of Floor/Plots Proposed: 11
Number of Floors Constructed: 11
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 36 36 105.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 3BHK 4 2 122.68 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
7 TOWER - G Number of Floor/Plots Currently Sanctioned: 12
Number of Floor/Plots Proposed: 12
Number of Floors Constructed: 12
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 40 36 92.16 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 3BHK 4 1 119.12 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
8 TOWER - H Number of Floor/Plots Currently Sanctioned: 11
Number of Floor/Plots Proposed: 11
Number of Floors Constructed: 11
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 36 35 105.31 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
2 3BHK 4 2 122.68 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
9 TOWER - I Number of Floor/Plots Currently Sanctioned: 12
Number of Floor/Plots Proposed: 12
Number of Floors Constructed: 12
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 4BHK 24 24 130.01 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
10 TOWER - K Number of Floor/Plots Currently Sanctioned: 10
Number of Floor/Plots Proposed: 10
Number of Floors Constructed: 3
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 59 46 91.07 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
11 TOWER - J Number of Floor/Plots Currently Sanctioned: 11
Number of Floor/Plots Proposed: 11
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 59 3 91.07 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
12 TOWER - L Number of Floor/Plots Currently Sanctioned: 10
Number of Floor/Plots Proposed: 10
Number of Floors Constructed: 3
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 2BHK 59 49 73.22 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
13 TOWER - M Number of Floor/Plots Currently Sanctioned: 10
Number of Floor/Plots Proposed: 10
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 2BHK 59 14 73.22 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
14 TOWER - N Number of Floor/Plots Currently Sanctioned: 10
Number of Floor/Plots Proposed: 10
Number of Floors Constructed: 2
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 59 28 83.41 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
15 TOWER - O Number of Floor/Plots Currently Sanctioned: 11
Number of Floor/Plots Proposed: 11
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 3BHK 63 18 98.7 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
16 TOWER - P Number of Floor/Plots Currently Sanctioned: 70
Number of Floor/Plots Proposed: 70
Number of Floors Constructed: 0
Sr.No Type of Apartment/ Shop/ Plot Total Number of Apartment/ Shop/ Plot Number of Apartment/ Shop/ Plot already sold Carpet Area of Apartment/ Shop/ Plot Exclusive OpenTerrace Area Area of the Exclusive Balcony/Verandah
1 EWS 70 0 15.64 (in sqr mtrs) 0 (in sqr mtrs) 0 (in sqr mtrs)
Parking Details
Sr.No Type of Parking Total Area of Parking Space Total Number of Parking Space No of Parking Space Booked or Sold
1 Open 7600.749 (in sqr Mtrs) 0 0
2 Stilt 4708.207 (in sqr Mtrs) 0 0
3 Basement 11426 (in sqr Mtrs) 0 0
Internal Infrastructure and Facilities Details
Sr.No Internal Infrastructure Facilities Name Internal Infrastructure Facilities Details Work Progress % Percentage
1 Fire Fighting Fire Fighting for common areas along with Alarm system as per Fire Department Norms along with provision of Fire Extinguishers 50.00
2 Drinking Water To be provided by MC Authorities and shall be ultimately provided to project occupants 50.00
3 Emergency Evacuation Fire Staircase and Proper Signage provided for Phase 1 which has been completed 50.00
4 Use for Renewable Energy To be provided in terms of applicable ECBC norms 40.00
5 Rain Water Harvesting Recharge Wells, installations as per relevant applicable PPCB norms 50.00
6 Street Lighting Provided for Phase 1 and shall be provided for the remaining development 50.00
7 Club House Club House, Gym, 80.00
External Infrastructure and Facilities Details
Sr.No External Infrastructure Facilities Name Facilities Type External Infrastructure Facilities Details Work Progress %age
1 External Roads and Road System Landscaping External Development Work (Municipal Council for External Road Works) Landscaping Work undertaken by Promoter for inside project area Phase 1 of the Project 60.00
2 Water Supply System Self-Development Water Tanks Installed for Phase 1 of the Project 50.00
3 Sewerage and Drainage System Self-Development Sewerage System connected to STP and Drainage System connected to Recharge Well for phase 1 of the project 50.00
4 Electricity Supply Transformer and Sub Station Self-Development Cabling Done and Transformers installed and working for Phase 1 of the project 50.00

Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
Sr.No Name of Professional Associated Consultant Type Name & Year of Establishment of Promoter Name & Profile of Key Projects Completed
1 LOKESH KUMAR TYAGI Structural Engineer
LKT Engineering Sushma Delivered Projects
Address for Official Communication 10/14 , Subhash Nagar,
New Delhi , Delhi - 110015
Email: meenu[at]sushmabuildtech.com Mobile/Landline Number: 8427417766
2 RAJESH MITTAL Contractor
Surya Contractors Reputed Contractor of Zone
Address for Official Communication # 1245 , Sector 82
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160059
Email: karamjeet[at]sushmabuildtech.com Mobile/Landline Number: 8427417766
3 MR MANIK Architect
N U Design Studio Reputed Delhi Architects
Address for Official Communication A-243 Okhla Industrial Area Phase-1 , Industrial Area, Phase - 1
New Delhi , Delhi - 110020
Email: manik[at]designstudio.com Mobile/Landline Number: 9654066555

Quarterly Updates of Registered Project
Sr.No. Quarter Name Quarter Year Reference Number Reference Date View Details
1 QTR-IV (October-December) 2020 QUP2020L20210134 01-Feb-2021 Open official attachment ↗
2 QTR-I (January-March) 2021 QUP2021F20210523 12-Apr-2021 Open official attachment ↗
3 QTR-II (April-June) 2021 QUP2021S20211083 13-Jul-2021 Open official attachment ↗
4 QTR-III (July-September) 2021 QUP2021T20211808 12-Oct-2021 Open official attachment ↗
5 QTR-IV (October-December) 2021 QUP2021L20220080 14-Jan-2022 Open official attachment ↗
6 QTR-I (January-March) 2022 QUP2022F20220825 14-Apr-2022 Open official attachment ↗
7 QTR-II (April-June) 2022 QUP2022S20221529 15-Jul-2022 Open official attachment ↗
8 QTR-III (July-September) 2022 QUP2022T20222365 18-Nov-2022 Open official attachment ↗
9 QTR-IV (October-December) 2022 QUP2022L20230307 19-Jan-2023 Open official attachment ↗
10 QTR-I (January-March) 2023 QUP2023F20231664 25-Apr-2023 Open official attachment ↗
11 QTR-II (April-June) 2023 QUP2023S20233570 18-Sep-2023 Open official attachment ↗
12 QTR-III (July-September) 2023 QUP2023T20240244 17-Jan-2024 Open official attachment ↗
13 QTR-IV (October-December) 2023 QUP2023L20240913 10-Apr-2024 Open official attachment ↗
14 QTR-I (January-March) 2024 QUP2024F20241025 15-Apr-2024 Open official attachment ↗
15 QTR-II (April-June) 2024 QUP2024S20242080 30-Jul-2024 Open official attachment ↗
16 QTR-III (July-September) 2024 QUP2024T20250808 14-Feb-2025 Open official attachment ↗
17 QTR-IV (October-December) 2024 QUP2024L20250813 14-Feb-2025 Open official attachment ↗