Promoter Details (Other Than Individual)
| Suksha Developers Private Limited | Private Limited Company | ||
| Main Objects of Organization | Real Estate Developer | ||
| Registered Address of Organization |
# 5069-B
,
Sector 38 West
Chandigarh , Chandigarh - 160038 |
||
| Official Address |
B-107, First Floor,
,
Business Complex at Elante Mall, Industrial Area, Phase - 1
Chandigarh , Chandigarh - 160002 |
||
| 0 (in years) | 0 (in years) | ||
| WebLink (Promoter/Parent-Entity) | Not Available | ||
Organization Member Details (If Applicable)
| Sr.No | Designation | Name of Member | Official Address | View Photograph |
|---|---|---|---|---|
| 1 | Director | Binder Pal Mittal |
House No. 36
,
Sector 8
Chandigarh , Chandigarh - 160009 Email: binderpal[at]sushmabuildtech.com |
|
| 2 | Director | Bharat Mittal |
House No. 36
,
Sector 8
Chandigarh , Chandigarh - 160009 Email: bharat[at]sushmabuildtech.com |
|
Litigation(s) related to Past Projects
| Sr.No | Project Name | Case Title | Case Number | Authority/Forum Name where case is Pending/Resolved |
|---|---|---|---|---|
| -- | -- | -- | -- | -- |
About the Project
| Project Name | Sushma Empiria | ||
| Project Address |
Village Nagla
,
Near Manav Mangal School, Zirakpur
Dera Bassi , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 |
||
| Project Amenities | Great Connectivity through PR7, state of art commercial development, proper and adequate facilities for water supply, electricity, sewerage disposal for successful occupation and operation of the project. | ||
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. | ||
| Type of Project |
(1) Commercial (Building/Tower Development) |
||
| Project Status | New Project | Project Cost (in rupees) | 2000000000.00 (INR) |
| Project Start Date | 01-Dec-2020 | Proposed/ Expected Date of Project Completion as specified in Form B | 31-Dec-2027 |
| Project Web Link | www.sushma.co.in | Mega Project (Yes/No) | No |
| Specification Details of Proposed Project as per the Brochure/ Prospectus |
:-
RCC Framed Structure :- Bare Slabs in Units, Vitrified Tiles in Common Areas :- Plaster in Units, OBD in Common Areas :- Branded Sanitary Fixtures in Toilets in Common Areas of the project :- Modular in Common Areas :- NA |
||
| Authorized Person for Communication with regards to Project |
Bharat
Mittal
House No. 36 , Sector 8 Chandigarh , Chandigarh - 160009 E-Mail: bharat[at]sushmabuildtech.com Mobile Phone: 9876200054 |
||
Bank Account Details of the Special/Separate Account to be maintained in a Schedule Bank
| Bank Name | HDFC Bank Limited | Branch Name | Industrial Area Chandigarh |
| Bank Account Number | Account number omitted from this archived copy; consult the authority source. | Bank IFSC Code | HDFC0000873 |
| Account Holder Name | SDPL PROJECT 2 MASTER COLLECTION ESCROW AC | ||
| Bank Address |
PLOT NO. 28
,
PHASE 1, IND AREA, CHD
Chandigarh , Chandigarh - 160002 |
||
Project Land Details
| 28315.2 (in sqr mtrs) | |||
| 28315.2 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 0 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 11317.703 (in sqr mtrs) | 0 (in sqr mtrs) | ||
| 16997.497 (in sqr mtrs) | |||
Project Land Khasra(s) and Area Details
| SrNo | Khasra Number of Land proposed to be developed | Area of Land proposed under Khasra | Name of Villages under Khasra | Project Land Status |
|---|---|---|---|---|
| 1 | 233 234 235 236 237 238 239 240 241 242 243 244 | 28315.2 (in sqr mtrs) | Nagla | Owned By Promoter |
Project Plan(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Approved Layout Plan | -- | -- |
Open official attachment ↗
|
| 2 | Approved Project Site OR Location Map | -- | -- |
Open official attachment ↗
|
| 3 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 4 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 5 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 6 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 7 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 8 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 9 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 10 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 11 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 12 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 13 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 14 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 15 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 16 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 17 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 18 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 19 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 20 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 21 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 22 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 23 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 24 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 25 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
| 26 | Sanctioned Building Plan | -- | -- |
Open official attachment ↗
|
Proforma of documents to be signed with Allottees
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Pro forma Agreement of Sale to be signed with allottees | -- | -- |
Open official attachment ↗
|
| 2 | Pro forma of Allotment Letter to be provided to allottees | -- | -- |
Open official attachment ↗
|
| 3 | Pro forma of Conveyance Deed to be signed with allottees | -- | -- |
Open official attachment ↗
|
Project Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Authenticated Copy of Form B | -- | -- |
Open official attachment ↗
|
| 2 | CA Certificate (Form 3) | -- | -- |
Open official attachment ↗
|
Project Approvals Document(s)
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | AAI Height NOC from Civil Aviation Department/ Airport Authority | Permissions (Received) | 18-Jan-2019 |
Open official attachment ↗
|
| 2 | CLU Certificate | -- | -- |
Open official attachment ↗
|
| 3 | CLU Certificate | -- | -- |
Open official attachment ↗
|
| 4 | Copy of Registration as Promoter | -- | -- |
Open official attachment ↗
|
| 5 | Defense Clearance | Permissions (Received) | 18-Jan-2019 |
Open official attachment ↗
|
| 6 | Environment Clearance certificate/ NOC | Clearances (Received) | 09-Dec-2019 |
Open official attachment ↗
|
| 7 | License as Promoter from competent Authority | Legal Documents (Received) | 24-Aug-2018 |
Open official attachment ↗
|
| 8 | License to develop colony or society from Competent Authority | -- | -- |
Open official attachment ↗
|
Project Land Documents
| Sr.No | Document Name | Reference Number | Issue Date | View PDF |
|---|---|---|---|---|
| 1 | Details of Land Encumbrances | -- | -- |
Open official attachment ↗
|
| 2 | Land Title Search Report | -- | -- |
Open official attachment ↗
|
| 3 | Latest Jamabandi Document | -- | -- |
Open official attachment ↗
|
| 4 | Legal Title Deed(s) - In case Land is owned by Promoter | -- | -- |
Open official attachment ↗
|
| 5 | Project Land Khasra Report or Plan | -- | -- |
Open official attachment ↗
|
Project Brochure/ Prospectus Documents
| Sr.No | Document Name | View Details |
|---|---|---|
| 1 | Advertisement and Brochure/ Prospectus |
Open official attachment ↗
|
Type of Project (Sushma Empiria)
| 1 | Commercial ( Building/Tower Development ) |
Project Building/ Tower/ Block Construction & Inventory Details
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | TOWER T-1 - GROUND FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 2 | TOWER T-1 - FIRST FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 3 | TOWER T-1 - SECOND FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 4 | TOWER T-1 - THIRD FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 5 | TOWER T-1 - FOURTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 6 | TOWER T-1 - FIFTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 7 | TOWER T-1 - SIXTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 8 | TOWER T-1 - SEVENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 9 | TOWER T-1 - EIGHTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 10 | TOWER T-1 - NINTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 11 | TOWER T-1 - TENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 12 | TOWER T-1 - ELEVENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 13 | TOWER T-1 - TWELVETH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 14 | TOWER T-1 - THIRTEENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 15 | TOWER T-1 - FOURTEENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 16 | TOWER T-1 - FIFTEENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 17 | TOWER T-1 - SIXTEENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 18 | TOWER T-1 - SEVENTEENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 19 | TOWER T-1 - EIGHTEENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 20 | TOWER T-1 - NINETEENTH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 21 | TOWER T-1 - TWENTIETH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 22 | TOWER T-2 GROUND FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 23 | TOWER T-2 1ST FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 24 | TOWER T-2 2ND FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 25 | TOWER T-2 3RD FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 26 | TOWER T-2 4TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 27 | TOWER T-2 5TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 28 | TOWER T-2 6TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 29 | TOWER T-2 7TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 30 | TOWER T-2 8TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 31 | TOWER T-2 9TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 32 | TOWER T-2 10TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 33 | TOWER T-2 11TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 34 | TOWER T-2 12TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 35 | TOWER T-2 13TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 36 | TOWER T-2 14TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 37 | TOWER T-2 15TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 38 | TOWER T-2 16TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 39 | TOWER T-2 17TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 40 | TOWER T-2 18TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 41 | TOWER T-2 19TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 42 | TOWER T-2 20TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
21
Number of Floor/Plots Proposed: 21 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 43 | TOWER T-3 GROUND FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 44 | TOWER T-3 1ST FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 45 | TOWER T-3 2ND FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 46 | TOWER T-3 3RD FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 47 | TOWER T-3 4TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 48 | TOWER T-3 5TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 49 | TOWER T-3 6TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 50 | TOWER T-3 7TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 51 | TOWER T-3 8TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 52 | TOWER T-3 9TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
| 53 | TOWER T-3 10TH FLOOR |
Number of Floor/Plots Currently Sanctioned:
11
Number of Floor/Plots Proposed: 11 Number of Floors Constructed: 0 |
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||
Parking Details
| Sr.No | Type of Parking | Total Area of Parking Space | Total Number of Parking Space | No of Parking Space Booked or Sold |
|---|---|---|---|---|
| 1 | Open | 4455.239 (in sqr Mtrs) | 193 | 0 |
| 2 | Basement | 19828.083 (in sqr Mtrs) | 619 | 0 |
| 3 | Basement | 6048 (in sqr Mtrs) | 378 | 0 |
| 4 | Basement | 23349.095 (in sqr Mtrs) | 729 | 0 |
Internal Infrastructure and Facilities Details
| Sr.No | Internal Infrastructure Facilities Name | Internal Infrastructure Facilities Details | Work Progress % Percentage |
|---|---|---|---|
| 1 | Fire Fighting | Fire Escape Routes, Staircase is being provided with proper fire extinguishers | 0.00 |
| 2 | Drinking Water | Will be facilitated by MC Authorities | 0.00 |
| 3 | Emergency Evacuation | Fire Escapes, Staircase with proper signages shall be provided | 0.00 |
| 4 | Street Lighting | Shall be provided as per applicable norms | 0.00 |
| 5 | Rain Water Harvesting | Shall be provided in terms of the applicable norms of relevant departments. | 0.00 |
External Infrastructure and Facilities Details
| Sr.No | External Infrastructure Facilities Name | Facilities Type | External Infrastructure Facilities Details | Work Progress %age |
|---|---|---|---|---|
| 1 | External Roads and Road System Landscaping | External Development Work | To be provided by MC Authorities and GMADA | 0.00 |
| 2 | Electricity Supply Transformer and Sub Station | Self-Development | Shall be provided at the relevant stage of completion of the project after procuring the same from the concerned department | 0.00 |
| 3 | Sewerage and Drainage System | Self-Development | STP to be provided by us in terms of approval. Also the relevant charges with regards to the project have been and shall be paid by us for external connectivity with our project. | 0.00 |
| 4 | Solid Waste Management and Disposal | Self-Development | Shall be provided in terms of the applicable norms of the concerned departments. | 0.00 |
| 5 | Water Supply System | Self-Development | Underground water tank(s) shall be provided for the project purposes. | 0.00 |
Project Professionals (Real Estate Agents, Structural Engineer, Architect, Contractors and other person)
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | MR AJAY GUPTA |
Structural Engineer
|
Perceptive Ideas Consulting Engineer Pvt Ltd | N.A. |
| Address for Official Communication |
40/221, Lower Ground Floor
,
CR Park,
New Delhi , Delhi - 110019 Email: ajay[at]perceptiveideas.org Mobile/Landline Number: 9873409784 |
|||
| 2 | MR RANJIT SABIKHI |
Architect
|
RSA Associates | N.A. |
| Address for Official Communication |
W-43, Suite B-6
,
Greater Kailash - II
New Delhi , Delhi - 110048 Email: info[at]rsar204.com Mobile/Landline Number: 9810500398 |
|||
| 3 | MR RAJESH MITTAL |
Contractor
|
Surya Contractors Pvt Ltd | N.A. |
| Address for Official Communication |
#1245
,
Sector 82
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 160059 Email: rajeshmittal[at]suryacon.co.in Mobile/Landline Number: 9915281654 |
|||
| 4 | MR PUNEET BANSAL |
Real Estate Agent
PBRERA-SAS79-REA0367 |
Raksha Realty | N.A. |
| Address for Official Communication |
SCO 19 FF CHD AMBALA HIGHWAY
,
ZIRAKPUR
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 Email: puneet.bansal[at]raksharealty.com Mobile/Landline Number: 9779043300 |
|||
| 5 | MR ABHINEET SAPRA |
Real Estate Agent
PBRERA-SAS79-REA0031 |
Value Homes | N.A. |
| Address for Official Communication |
C-03 403 Nirmal Chhaya Towers
,
VIP Road Zirakpur
Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140603 Email: abineet.sapra[at]gmail.com Mobile/Landline Number: 9988400888 |
|||
Quarterly Updates of Registered Project
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date | View Details |
|---|---|---|---|---|---|
| 1 | QTR-I (January-March) | 2021 | QUP2021F20210534 | 12-Apr-2021 | Open official attachment ↗ |
| 2 | QTR-II (April-June) | 2021 | QUP2021S20211094 | 13-Jul-2021 | Open official attachment ↗ |
| 3 | QTR-III (July-September) | 2021 | QUP2021T20211820 | 12-Oct-2021 | Open official attachment ↗ |
| 4 | QTR-IV (October-December) | 2021 | QUP2021L20220093 | 14-Jan-2022 | Open official attachment ↗ |
| 5 | QTR-I (January-March) | 2022 | QUP2022F20220836 | 14-Apr-2022 | Open official attachment ↗ |
| 6 | QTR-II (April-June) | 2022 | QUP2022S20221546 | 16-Jul-2022 | Open official attachment ↗ |
| 7 | QTR-III (July-September) | 2022 | QUP2022T20222354 | 18-Nov-2022 | Open official attachment ↗ |
| 8 | QTR-IV (October-December) | 2022 | QUP2022L20230317 | 19-Jan-2023 | Open official attachment ↗ |
| 9 | QTR-I (January-March) | 2023 | QUP2023F20231671 | 25-Apr-2023 | Open official attachment ↗ |
| 10 | QTR-II (April-June) | 2023 | QUP2023S20233577 | 18-Sep-2023 | Open official attachment ↗ |
| 11 | QTR-III (July-September) | 2023 | QUP2023T20240254 | 17-Jan-2024 | Open official attachment ↗ |
| 12 | QTR-IV (October-December) | 2023 | QUP2023L20240919 | 10-Apr-2024 | Open official attachment ↗ |
| 13 | QTR-I (January-March) | 2024 | QUP2024F20241034 | 15-Apr-2024 | Open official attachment ↗ |
| 14 | QTR-II (April-June) | 2024 | QUP2024S20242086 | 30-Jul-2024 | Open official attachment ↗ |
| 15 | QTR-III (July-September) | 2024 | QUP2024T20250819 | 14-Feb-2025 | Open official attachment ↗ |
Open official attachment ↗